Resume

Sign in

Power Plant Technician

Location:
Doha, Qatar
Posted:
March 30, 2018

Contact this candidate

Resume:

NYL W. SABURAO

Taytay, El-Salvador City, Misamis Orriental,

Philippines

Contact No. +639*********, +639*********

Email: ac4y8w@r.postjobfree.com

ac4y8w@r.postjobfree.com

Profile of Experience

More than ten (10) years field experience mainly in the field of electronics and communication, gaining actual and hands-on skills and field exposure in installing, configuring, troubleshooting, testing, repair and maintenance of various standard and specialized electronic, instrument and electrical devices, equipments and gadgets commonly used in telecommunication, telephone exchange and data networks, including start-up operations, calibration and testing with exposure in most advance fire alarm systems.

Work Experience

Supervisor/Engineer (Fire Alarm System) -May 10, 2017 to Present

Fire Fighting / HVAC Department

Samsung C & T, Qatar

Umm Al Houl Power Plant IPWP

Al Wakra, Qatar

Duties and Responsibilities:

In-charge over all for the installation of Fire Alarm system, FM200 Systems, Fire pumps for entire Power Plant.

Review, Evaluate and Suggest rectification for Pre-Installation documents such as Material approval, Method of Statement and Inspection Test Plan (ITP) prior to actual installation.

Review, Evaluate and Revised if necessary Installation Drawings prior to Site Erection.

Perform Site Survey and Evaluate Site Condition.

Analyzed Quantity of materials like engineering length and Approved Installation material quantity as per actual site requirement.

Planning of manpower quantity as per site requirement.

Coordinate and discuss with other disciplines for possible installation clashing points.

Final Site advance survey for proper access prior to actual work and site condition prior to manpower deployment on-site.

Monitor, Supervise and Rectify on-site problems that may occur during the Installation Process.

Prepare and process approval for Documents pertaining to Pre-Commissioning and Final Testing.

Perform and Witness Inspection and Discuss with Client Representative possible options for some rectification work that may arise during the inspection.

Preparation and Process approval for the Erection Complication Certificate (ECC).

Perform Final Walk Down with Client and its representatives prior to handover.

Supervisor/Engineer (Fire Alarm System) -April 13, 2016 to December 2016

Fire Fighting Department

Hyundai Heavy Industries Co. LTD

S.E.C Shuqaiq Steam Power Plant

Shuqaiq, KSA

Duties and Responsibilities:

In-charge over all for the installation of Fire Alarm system, FM200 Systems, Fire pumps for entire Power Plant.

Review, Evaluate and Suggest rectification for Pre-Installation documents such as Material approval, Method of Statement and Inspection Test Plan (ITP) prior to actual installation.

Review, Evaluate and Revised if necessary Installation Drawings prior to Site Erection.

Perform Site Survey and Evaluate Site Condition.

Analyzed Quantity of materials like engineering length and Approved Installation material quantity as per actual site requirement.

Planning of manpower quantity as per site requirement.

Coordinate and discuss with other disciplines for possible installation clashing points.

Final Site advance survey for proper access prior to actual work and site condition prior to manpower deployment on-site.

Monitor, Supervise and Rectify on-site problems that may occur during the Installation Process.

Prepare and process approval for Documents pertaining to Pre-Commissioning and Final Testing.

Perform and Witness Inspection and Discuss with Client Representative possible options for some rectification work that may arise during the inspection.

Preparation and Process approval for the Erection Complication Certificate (ECC).

Perform Final Walk Down with Client and its representatives prior to handover.

Supervisor (Fire Fighting I&C, Electrical) -November 2011 to December 2014

Building Facility Department

DOOSAN HEAVY INDUSTRIES and CONSTRUCTION

S.E.C. Rabigh 700 X 4 Units Power Plant 2 Project

Rabigh, KSA

Duties and Responsibilities:

In-charge over all for the installation of Fire Alarm system, FM200 Systems, Fire pumps for entire Power Plant.

Review, Evaluate and Suggest rectification for Pre-Installation documents such as Material approval, Method of Statement and Inspection Test Plan (ITP) prior to actual installation.

Review, Evaluate and Revised if necessary Installation Drawings prior to Site Erection.

Perform Site Survey and Evaluate Site Condition.

Analyzed Quantity of materials like engineering length and Approved Installation material quantity as per actual site requirement.

Planning of manpower quantity as per site requirement.

Coordinate and discuss with other disciplines for possible installation clashing points.

Final Site advance survey for proper access prior to actual work and site condition prior to manpower deployment on-site.

Monitor, Supervise and Rectify on-site problems that may occur during the Installation Process.

Prepare and process approval for Documents pertaining to Pre-Commissioning and Final Testing.

Perform and Witness Inspection and Discuss with Client Representative possible options for some rectification work that may arise during the inspection.

Preparation and Process approval for the Erection Complication Certificate (ECC).

Perform Final Walk Down with Client and its representatives prior to handover.

Fire Alarm System Technician & 1st Telecomm Technician -July 8, 2009 to August 15, 2010

Low Current Department

Saudi Oger LTD.

KAUST Project

Jeddah, KSA

Duties and Responsibilities – Fire Alarm System Technician:

Additional work load as a Low Current 1st technician, in-charge of troubleshooting of EST 3, Simplex, Honeywell, and quickstart fire alarm system.

Troubleshooting of loop wiring trouble, smoke detector, heat detector and duct detectors.

Install fire alarm system cables, pipes, equipments and others

Fire alarm maintenance of almost 5000 villa, 50 apartment bldgs, 4 hotels for King Abdullah University of Science and Technology.

Duties and Responsibilities – Telecom Technician:

Troubleshooting, testing and repair of all telecomm and data line, router, network configurations and CESCO IP phone.

Installation of additional IP telephone lines and network cable and alike.

Installation and activations of CCTV Surveillance cameras.

Structured cabling for computer networking, electrical cabling and internet configuration.

Installation and maintenance of PaBX telephone switch.

Project Technical Support & Supervisor -July 2008 to May 2009

(Project Base)

(Electrical & Technical Security Service Technician)

2AB Designs and Computer Services

Cagayan de Oro City, Philippines

Install and/or service customer’s commercial security equipment including alarm systems, CCTV, card access, fire systems and associated components and electrical component system

Duties and Responsibilities - Telecom and Fire Alarm System Technician:

Perform proper installation of security type equipment

Adhere to local and national building/construction codes, including safety standards

Stay abreast of product knowledge, pricing adjustments and availability of special product applications

Maintain good, solid, honest, open relationship with all departments and the management staff

Submit activity reports to management as requested

Carry out assignments given by management

Train the customer in the care and use of equipment

Equip company vehicle with proper parts and tools needed to perform installations

Attend classroom and field training as required

Comply with Interface’s safety policy

Maintain a good driving record

Inform the Installation Supervisor or Manager of any events that may cause labor or equipment overages, damage of property and safety issues

Other duties as assigned

Maintain industry certifications as required.

Ability to communicate effectively with customers to explain how system works and the installation process.

Knowledge and ability to operate hand tools such as a drill, hammer, pliers, and cutters.

Installation and activations of CCTV Survellance cameras. Structured cabling for computer networking, electrical cabling and internet configuration.

Installation and maintenance of PaBX telephone switch.

Duties and Responsibilities – Electrical Field & Project Supervisor:

Daily monitoring of Electrical Materials

Perform material check before installation

Prepare material turn over documentation for subcontractor

Supervise the manpower of project subcontractor during work/installation

Supervise cable tray layout works/installation

Supervise lighting and conduit installation

Supervise cable termination to distribution panel

Perform routine inspection and testing with client

Telephone Switch & Data –March 2007 to March 2008

Communication Technician

Philippine Telegraph & Telephone Co.

Cagayan de Oro City, Philippines

Duties and Responsibilities:

Troubleshooting, testing, repair and maintenance of telephone switch equipments and accessories.

Testing and configuring trunklines from unwanted signals and interferences.

Repairing or replacing defective circuit cards.

Ensuring perfect signal exchanges between switch branches.

Ensuring standard, quality and Policy-assured operation. Installation, repair, testing and maintenance of datacom, network and related equipments, devices and accessories such as modems, hubs, routers, etc, and program, set-up/configure the same.

Ensuring standard or customized operation of datacom lines, equipments and accessories per client needs and specifications.

Sr. Field Technician -April 2001 to February 2007

Philippine Telegraph & Telephone Co.

Cebu City, Philippines

Duties and Responsibilities:

Installation, start-up and test operation, troubleshooting, repair and maintenance of telephone cable facilities, including the associated devices and accessories.

Splicing/re-splicing, connecting and terminating cables and wires.

Handling and operating thermal splicing machines for fiber optic cable splicing.

Surveying, mapping, site preparation, preparing and sourcing materials in preparation for any installation of physical cables and drop-wires.

Also assists in installation and testing of related electrical connections; operating and testing of various instrument and calibrating devices

Telephone Switch & Data -September 2000 to March 2001

Communication Technician

Philippine Telegraph & Telephone Co.

Cagayan de Oro City, Philippines

Duties and Responsibilities:

Troubleshooting, testing, repair and maintenance of telephone switch equipments and accessories.

Testing and configuring trunklines from unwanted signals and interferences.

Repairing or replacing defective circuit cards. Ensuring perfect signal exchanges between switch branches.

Ensuring standard, quality and Policy-assured operation. Installation, repair, testing and maintenance of datacom, network and related equipments, devices and accessories such as modems, hubs, routers, etc, and program, set-up/configure the same.

Ensuring standard or customized operation of datacom lines, equipments and accessories per client needs and specifications

Headend / Field Technician –April 1999 to May 1999

DEARBCI Cable TV Network

Bukidnon, Philippines

Duties and Responsibilities:

Install, set-up, troubleshoot and repair CATV equipments and devices.

Test, calibrate, configure or replace electronic parts of CATV taps, amplifiers and related devices/accessories.

Install, troubleshoot and repair physical CATV dropwires, including preparatory site visits/mapping and materials survey.

Educational Background & Qualifications:

BS in Electronics & Communications Engineering

Graduated October 1999

Liceo de Cagayan University, Cagayan de Oro City, Philippines

Skills

Special training for plant equipment lifters;

Falcon Spider lifters

Genie lifters

Nifty man lifter

Scissor man lifter

Skilled in common PC applications (MS Suite, etc), Internet use /Email

Familiar with standard/specialized computer-based telecom/datacom troubleshooting software

Network hardware installation, set-up/configuration

Fiber-optic cable splicing and termination

Driving

Seminars/Trainings:

Transmission Fundamentals

(Liceo de Cagayan Univ., Cag. de Oro City, Philippines)

Fiber Optic Workshop

(Mindanao Polytechnic State College, Cag. de Oro City, Philippines)

Wireless Local Loop Workshops

(Liceo de Cagayan Univ., Cag. de Oro City, Philippines)

Trunking Fundamentals Workshop

(Liceo de Cagayan Univ., Cag. de Oro City, Philippines)

CCNA 1 CISCO System Training Program

CIE (Center for International Education)

Cebu City, Philippines

Personal Details:

Date of Birth: July 21, 1977

Place of Birth: Camp Phillips, Manolo Fortich, Bukidnon

Fathers Name: Ronilo T. Saburao

Mothers Name: Leoncia W. Saburao

Status: Single

Religion: Roman Catholic

Height: 5’8

Weight 160lbs

Passport number: EC0796964

Place of Issue: PCG Jeddah

Character References:

Engr. Arnel Baba Contact Info: 091********

Owner

2AB Design and Computer Services

Cagayan de Oro City

Carl Max Labis Contact Info: 091********

Owner

Eon Technology

Cagayan de Oro City

Grace N. Cantones Contact Info: 091********

Quality Control Analyst

San Miguel Foods, Inc



Contact this candidate