CHANDRASEKAR.C
: *.*************@*****.*** : Seelapadiankalam,Velvarkottai-(PO),
: +91-958*******, +91-880******* Vedasandur-(tk), Dindigul-624803.
TamilNadu,India.
OBJECTIVE
Seeking growth oriented assignments to bring out my potential and to grow professionally along with your organization.
ACADAMIC PROFILE
2005: S.S.L.C CSMAHr Sec. School,Dindigul– 71%
2005 – 2008: D.M.E SBM Polytechnic College,Dindigul– 67%
SOFTWARE PROFICIENCY
PDMS 11.6,12.5&Aveva Review
Smart Plant Design (SP3D). Trained
Smart Plant Review (SPR)
Auto CAD and Micro station
Auto Plant Bentley V8i/Prosteel V8i
MS Office /Word.
PROFESSIONAL EXPERIENCE
Successful, highly motivated Piping Designer with 10 years extensive experience throughout the Oil, Gas, Power Plant & Water Treatment Industry. Have hands on experience in many FPSO Projects, Platforms & few Onshore Projects. Major Clients worked with are SBM, MODEC, ONGC, GPS, PETRONAS, Technip, BWO Offshore, MCGM, KPOC, Dong Energy, Martin Linge, Sibur (ZAPSIB2) and Dahej type plant..
PRESENTLY WORKING FOR L&T TECHNOLOGY SERVICES, CHENNAI, FROM JAN’18 to till date.
PROJECTS INVOLVED / HANDLED:
oDAHEJ TYRE PLANT.
oClient : MRF
oProject : DAHEJ TYRE PLANT, Gujarat
oJob involved : Equipment Layout, Piping GA, Isometrics, Pipe Supports and Stress input, Material take-off, Pipe routing
RESPONSIBILITIES:
oPreparation of Piping Layout/Equipment Layout,Pipe Routing, 3D Model, and Piping Isometric, Preliminary and Final Bill of Material (BOM) and Tie-In Register As per P&ID.
oOverall design and drafting, Piping & Instrumentation Diagrams (P&ID’s), Process Flow Diagram (PFD), Plot plans, Piping GA/Mechanical GA, Nozzle Orientation As per (P&ID’s).
oChecking all detail drawings before submitting for approval.
WORKED FOR TECHNIP INDIA PVT LTD CHENNAI), FROM FEB’13 to MAY’16
PROJECTS INVOLVED / HANDLED:
oZAPSIB-2 Project, 700 ktpa HDPE UNIT.
Client : ZapSibNeftekhim, LLC,
Licensor : Ineos
Consultant : Technip ind.iapvt ltd Chennai.
Project : Extension of existing Sibur petrochemical complex located at Tobolsk, Western Siberia, Russia (Onshore).
Job involved : Equipment Layout, Tie-in Register, Piping GA, Isometrics, Pipe Supports and Stress input.
oMARTIN LINGE P/F TOPSIDES PROJECT.
Client : TOTAL E & P NORGE AS
Construction consortium : Samsung Heavy industries
Project : Process and Utility Module
Location : Topsides- Fixed production platform (Offshore), in North sea, Norway.
Job involved : Equipment Layout, Tie-in Register, Piping GA, Isometrics, Pipe . Supports and Handling study.
o5/98 HEJRE DEVELOPMENT PROJECT / PLATFORM EPC.
Client : Dong Energy
Project : Detail Engineering of Process and Utility Module
Location : Offshore, Norway
Job involved : Equipment Layout, Tie-in Register, Piping GA, Isometrics, Pipe Supports,
RESPONSIBILITIES:
Preparation of Piping Layout/Equipment Layout,Pipe Routing, 3D Model, and Piping Isometric, Preliminary and Final Bill of Material (BOM) and Tie-In Register As per P&ID.
Overall design and drafting, Piping & Instrumentation Diagrams (P&ID’s), Process Flow Diagram (PFD), Plot plans, Piping GA/Mechanical GA, Nozzle Orientation As per (P&ID’s).
Checking all detail drawings before submitting for approval.
Equipment list, valve list, line list in coordination with other departments.
Familiar with codes and standards.
Preparation of Handling ways and devices drawing, selection of handling devices and handling report preparation considering Handling philosophy.
WORKED IN KAVIN ENGINEERING SERVICES & PRIVATE LIMITED AS A PIPING DESIGNER FROM NOV’08 TO JUL’12
RESPONSIBILITIES:
Preparation of Piping Layout/Equipment Layout,Pipe Routing, 3D Model, and PipingIsometric, Preliminary and Final Bill of Material (BOM) and Tie-In Register As per P&ID.
Overall design anddrafting,Piping & Instrumentation Diagrams (P&ID’s), Process Flow Diagram (PFD), Plot plans, Piping GA/Mechanical GA, Nozzle Orientation As per (P&ID’s).
Checking all detail drawings before submitting for approval.
Equipment list, valve list,line list in coordination with other departments.
Familiar with codes and standards.
Modeling and Drafting of products.(using, AutoCAD,Microstation, Autoplant v8i, PDMS)
Preparation of As-Built Drawings as per Red-Line Markups.
Preparation of Pipe Support 2D, 3D as per stress analysis.
Internal, External and vessel clips 2d&3d.
Engineering drawings and technical documents issued for Internal Design Checks (IDC’s) and Self Discipline Checks (SDC’s) and coordinate with other departments
PROJECTS INVOLVED / HANDLED:
oFPU JOKOTOLE FOR TERANG SIRASUN BATUR FIELD.
Client : BWO/ KANGEAN ENERGY INDONESIA / VME PROCESS.
Project : Detail Engineering of Utility Module
Location : Offshore, Indonesia.
Job involved : Equipment Layout, Tie-in Register, Piping GA, Isometrics, Pipe Supports
o5 WELL HEAD PLATFORM
Client : SIME DARBY ENGG. / ONGC
Project : 5 WHP Project.
Location : Mumbai.
Job involved : Equipment Layout, Piping GA, Isometrics, and pipe Supports.
oFPSO – JUBILEE FIELD UNIT
Client : MODEC/TULLOW GHANA LIMITED
Project : FPSO – JUBILEE FIELD UNIT/Inlet Separation Module - 2P&3P
Location : Ganga
Job involved : Equipment Layout, Tie-in Register,Piping GA, Isometrics, Pipe Supports
o FPSO CAPIXABA RELOCATION
Client : PETROBRAS / SBM Atlanta
Project : Detail Engineering of Amine Sweetening Plant.
Location : Off-Shore, Brazil
Job involved : P&ID, Piping GA, Isometrics, Pipe Supports
oTANGA BARAT CLUSTER DEVELOPMENT PROJECT
Client : PETRONAS CARIGALI SDN. BHD
Project : Fuel Gas Package
Location : Off-Shore, Malaysia
Job involved : Equipment Layout, Tie-in Register, Piping GA, Isometrics, Pipe Supports
oKBB NORTHERN HUB PROJECT
Client : KPOC-Kebabangan Petroleum Operating Company Sdn. Bhd.
Project : Diesel Filter Coalescer Package.
Location : Off-Shore, Malaysia.
Job involved : Equipment Layout, Tie-in Register, Piping GA, Isometrics, and Pipe Supports.
oKBB NORTHERN HUB PROJECT
Client : Technip Off-shore
Project : LP Compressor Package, HC Blanketing VOC Recovery Unit.
Location : Off-Shore, Singapore.
Job involved : Equipment Layout, Tie-in Register, Piping GA, Isometrics, and Pipe Supports.
WORKED IN IDEAL INDUSTRIES INCORPORATION PVT LTD AS A DRAFTSMAN FROM MAY’08 TO NOV’08
RESPONSIBILITIES:
Boiler, Vessel, Filter and plant Accessories Detail Drawings Prepared (Using AutoCAD).
Daily Progress Report Prepared and client submitted.
Monitoring the progress of work and arranging the materials etc.
WORKING IN SMC INFRASTRUCTURE PVT LTD THANE (W), AS A PIPING DESIGNER FROM JUL’12 TO FEB’13
1. Project: 900MLD Water Treatment Plant,
Client: MCGM/Degremont Ltd.
Consultant: Mott MacDonald Consortium.
RESPONSIBILITIES:
Preparation of As-Built Drawings as per site survey.
Preparation of Civil & Mechanical GA as per site conditions.
Weekly Progress Report submission.
PACKAGES:
Raw water inlet/parshall flume & distribution chamber/pulsatube clarifiers
Aquazur v – filters/chlorine contact tank/waste water recovery tank/pulsatube clarifier sludge sump/common sludge balancing tank/flocculator for sludge thickener/sludge thickener/thickened sludge sump/supernatant ¢rate tank & pumps/centrifuge building/chemical building/chlorination building/sludge sump & pump for existing clarifier.
PERSONAL INFORMATION
D.O.B : 15.05.1987
Gender : Male
Martial Status : Single
Linguistic Abilities : English, & Tamil
Nationality : Indian
Passport No : H1589164
DECLARATION
I hereby declare that the above information is true to the best of my knowledge.
CHANDRASEKAR.C