Post Job Free
Sign in

Engineer Manufacturing

Location:
Bowling Green, KY
Posted:
March 25, 2018

Contact this candidate

Resume:

John Frank

**** ****** ******

Bowling Green KY, 42101

270-***-****

****.********@******.***.***

Education: Western Kentucky University, Bowling Green Kentucky

B.S. in Advance Manufacturing (2016)

Related courses Basic Electricity, Industrial Statistics, Manufacturing Methods, SoildWorks, Automated System (PLCs), Work Design/Ergonomics, Systems Design and Operation, Project Management, Quality Assurance and Lean Manufacturing

Work Experience:

2018-Present ProCom Heating Industry, Bowling Green Ky,

(Full-Time)

Plant Supervisor: Responsibility include production scheduling and reporting, define manufacturing prosses for parts, raw material scheduling, programing CNC machines, obtain quotes for new tooling and new machines, costing of finish goods, assist with product deployment.

2016- 2018 ProCom Heating Industry, Bowling Green Ky,

(Full Time)

Product/ Manufacturing Engineer: Product development with new and existing products. Making 3D models and 2D drawings. Maintain all engineer and manufacturing documentation ECNS, BOMs, drawings etc. Create routings for new manufacture parts. Perform line balancing actives. Perform quality audits. Design and produced fixtures to be used on assembly lines. Obtain quotes for new tooling and machines.

Program both CNC laser/punch and press break for sheet metal fabrication.

(2015-2016) ProCom Heating Industry, Bowling Green Ky,

(co-op)

Manufacturing Engineer: Perform daily quality test on products. Designed

Line layouts for new products with solidworks. Made a 3D model of the plant on solidworks to help with the placement of new machines. Document quality test and production processes. Used solidworks to build models and drawing of the heaters.

2014-2015 Zachary Industrial Construction, Louisville Ky,

(Full time)

Electrician helper and pipe fitter helper: As an electrician helper, I would install

conduit that was specified on prints. Install grounding on all equipment and structures. As pipe, fitter helper I would help with install of pipe and help with the fitting process.

References available on request



Contact this candidate