Post Job Free
Sign in

Engineer Mechanical

Location:
Paniqui, Central Luzon, Philippines
Salary:
2500 USD
Posted:
March 20, 2018

Contact this candidate

Resume:

Construction Piping Supervisor/ Commissioning Piping Supervisor

ROGELIO YOSON LAPITAN JR.

#*** **** **., ******** ******, Paniqui, Tarlac, Philippines

Mobile: +639*********, Home: +639*********

Email Add: rogeliojr *******@*****.***

EDUCATION

1986~1991 Bachelor of Science in Mechanical Engineering. Gregorio Araneta University foundation– Malabon, Metro Manila, Philippines.

ADDITIONAL INFORMATION

Date of Birth – May 30, 1967

Citizenship – Filipino

Mechanical Engineer - Philippines

COMPUTING EXPERIENCE

Microsoft Office:

Word

Excel (Spreadsheets)

Outlook

Microsoft Project (Planning)

SEMINAR AND TRAINING ATTENDED

Sept. 2005 – Safety Orientation Course ( Singapore )– 8hours

Oct. 2006 – Maximo Program (CMMS) (Libya) – 8hours

July 2007 – Auto Cadd (Philippines) – 70hours

Oct. 2007 – Basic NDT(RT,UT,PT,MT)(Philippines) – 48 hours

Nov. 2007 – Primavera 5 (Philippines) – 24hours

Nov. & Dec. 2008 – Institute of Leadership & management – Leadership and Supervisor Training (QISC)-GTL, Qatar – 88 hours.

March 2015 – Saudi Aramco work permit receiver (up to confined)

EXPERIENCE SUMMARY

Total of 17 years experience as Piping, Tank, Mechanical Commissioning Supervisor both and Skilled worldwide in Petrochem, Oil & Gas construction and other plant. Specializing in Fabrication, Erection, Installation, Construction,Testing, Pre-commissioning, commissioning, Maintenance and Operation.

Work Experiences

September 9, 2014 – December 13, 2015

Wasit Gas Project – Package #3 & #4 – Khursaniyah, Jubail KSA

(SK Engineering and construction)

Commissioning Supervisor

Responsible for all pre-commissioning, commissioning works like internal cleanliness of all utilities and process pipe up to dry layup inspection. Project scope all utility pipes and process pipes on Sulfur Recovery Unit and Catalyst loading on Sulfur converter. Supervised contractor’s activities like chemical cleaning,hydromilling,steam blowing and lube oil flushing. Assigned in different areas as directed by commissioning manager.

June 2, 2013 – September 8, 2014

EPC- 2 YASREF Crude Projects. – Yanbu KSA

(SK Engineering and construction)

Commissioning Piping Supervisor

As construction still ongoing, I was assigned on monitoring sub constructor for their daily progress on Installation of process piping for two months. After two months I started working on pre-commissioning work. Responsible for all pre-commissioning activities. Prepare pre-commissioning package document and raised RFI. Coordinate with QC prior for inspection. I worked under the supervision of commissioning engineer and manager. Punch list killing prior for PMCC.

May 2008 – Sept. 2011

Qatar Shell (Gas to Liquid) – Ras laffan Ind’l City, Qatar.

(Consolidated Constructor International Company)- Under JGC/KBR Supervision.

Piping Supervisor

Responsible on providing resources for commissioning work under KBR supervision.

I work directly under the supervision of KBR commissioning engineers/superintendent.

Responsible for production of pre-fabricated spools from small bore to big bore pipes. Monitor and Supervised proper execution of spools from isometric to actual lay out. Follow all international codes/ standards. Project work scope Utilities pre-commissioning/commissioning of piping and equipments. Production of pre-fabricated spools for process piping for phase 1 and 2 areas.

June 2006 – June 2007

Eni Gas BV Western Libya Gas Plant – Wafa Libya

(M.A.N. Ferostaal, Oil and Gas Lmtd.)- Under Udhe Thyssenkrupp of Germany Supervision.

Technical Support Engineer

Assistance to maintenance engineer. Gather documents required for maintenance works and shutdown activities. Prepare material take off for modification of process piping. Site verification of maintenance and shutdown work. Encoding completed preventive maintenance on CMMS (Maximo). Checking all Existing Pressure safety valve and encode to data base.

Sept. 2004 – Sept. 2005

Petro Chemical of Singapore – Jurong Island of Singapore

Singapore Takada Ind. Pte. Ltd. (Singapore

Piping foreman

Responsible for all pre-fabrication spools on fabrication shop. Erection and installation of pipe on site. Responsible also for erection and installation of plant equipments (vessels, hopper etc.). I work under mechanical piping engineer. Assigned to lead plant maintenance for all mechanical equipment. Project scope plant construction, maintenance and shutdown.

May 2001 – May 2004

Allied Industrial Corporation – Taiwan

Mechanical Engineer/Plant Operator

Responsible for piping modification. Monitor and maintain good operation of all plant equipments. Supervised subcontractor for installation of piping and insulation. Operate centralized spray drying plant. Conduct inventory of spare parts for equipments and process piping. Job scopes production of food supplements

Nov.1997 – Nov. 1999

Super Electronics Co. Ltd. (Taiwan)

Mechanical Technician/Plant Operator

Operates different machine e.g. Automatic Cutting machine, Press Machine, Vacuum Sealer and etc. Perform maintenance work for all plant equipment and erect and install piping spools. Job scopes production of ferrites.

May 1995 – May 1997

Tung –Ho Steel Enterprise Corporation (Taiwan)

Mechanical Technician

Responsible for maintenance on all plant equipments. Fabrication of cooling pipe for electric furnace. Erection and installation of pre-fabrication spool for plant modification. Repair pneumatic and hydraulic cylinder for rolling machine and electric furnaces.

June 1993 – June 1995

Unilever Philippines – Paco, Philippines

Times Maintenance Corporation

Junior Fabricator Engineer

Calculates materials take-off of steel fabrication. Execute actual layout of plan according to Isometric Drawing. Responsible for pre-fabrication of spools and jacketed vessel. Additional duties as safety officer on site.



Contact this candidate