Construction Piping Supervisor/ Commissioning Piping Supervisor
ROGELIO YOSON LAPITAN JR.
#*** **** **., ******** ******, Paniqui, Tarlac, Philippines
Mobile: +639*********, Home: +639*********
Email Add: rogeliojr *******@*****.***
EDUCATION
1986~1991 Bachelor of Science in Mechanical Engineering. Gregorio Araneta University foundation– Malabon, Metro Manila, Philippines.
ADDITIONAL INFORMATION
Date of Birth – May 30, 1967
Citizenship – Filipino
Mechanical Engineer - Philippines
COMPUTING EXPERIENCE
Microsoft Office:
Word
Excel (Spreadsheets)
Outlook
Microsoft Project (Planning)
SEMINAR AND TRAINING ATTENDED
Sept. 2005 – Safety Orientation Course ( Singapore )– 8hours
Oct. 2006 – Maximo Program (CMMS) (Libya) – 8hours
July 2007 – Auto Cadd (Philippines) – 70hours
Oct. 2007 – Basic NDT(RT,UT,PT,MT)(Philippines) – 48 hours
Nov. 2007 – Primavera 5 (Philippines) – 24hours
Nov. & Dec. 2008 – Institute of Leadership & management – Leadership and Supervisor Training (QISC)-GTL, Qatar – 88 hours.
March 2015 – Saudi Aramco work permit receiver (up to confined)
EXPERIENCE SUMMARY
Total of 17 years experience as Piping, Tank, Mechanical Commissioning Supervisor both and Skilled worldwide in Petrochem, Oil & Gas construction and other plant. Specializing in Fabrication, Erection, Installation, Construction,Testing, Pre-commissioning, commissioning, Maintenance and Operation.
Work Experiences
September 9, 2014 – December 13, 2015
Wasit Gas Project – Package #3 & #4 – Khursaniyah, Jubail KSA
(SK Engineering and construction)
Commissioning Supervisor
Responsible for all pre-commissioning, commissioning works like internal cleanliness of all utilities and process pipe up to dry layup inspection. Project scope all utility pipes and process pipes on Sulfur Recovery Unit and Catalyst loading on Sulfur converter. Supervised contractor’s activities like chemical cleaning,hydromilling,steam blowing and lube oil flushing. Assigned in different areas as directed by commissioning manager.
June 2, 2013 – September 8, 2014
EPC- 2 YASREF Crude Projects. – Yanbu KSA
(SK Engineering and construction)
Commissioning Piping Supervisor
As construction still ongoing, I was assigned on monitoring sub constructor for their daily progress on Installation of process piping for two months. After two months I started working on pre-commissioning work. Responsible for all pre-commissioning activities. Prepare pre-commissioning package document and raised RFI. Coordinate with QC prior for inspection. I worked under the supervision of commissioning engineer and manager. Punch list killing prior for PMCC.
May 2008 – Sept. 2011
Qatar Shell (Gas to Liquid) – Ras laffan Ind’l City, Qatar.
(Consolidated Constructor International Company)- Under JGC/KBR Supervision.
Piping Supervisor
Responsible on providing resources for commissioning work under KBR supervision.
I work directly under the supervision of KBR commissioning engineers/superintendent.
Responsible for production of pre-fabricated spools from small bore to big bore pipes. Monitor and Supervised proper execution of spools from isometric to actual lay out. Follow all international codes/ standards. Project work scope Utilities pre-commissioning/commissioning of piping and equipments. Production of pre-fabricated spools for process piping for phase 1 and 2 areas.
June 2006 – June 2007
Eni Gas BV Western Libya Gas Plant – Wafa Libya
(M.A.N. Ferostaal, Oil and Gas Lmtd.)- Under Udhe Thyssenkrupp of Germany Supervision.
Technical Support Engineer
Assistance to maintenance engineer. Gather documents required for maintenance works and shutdown activities. Prepare material take off for modification of process piping. Site verification of maintenance and shutdown work. Encoding completed preventive maintenance on CMMS (Maximo). Checking all Existing Pressure safety valve and encode to data base.
Sept. 2004 – Sept. 2005
Petro Chemical of Singapore – Jurong Island of Singapore
Singapore Takada Ind. Pte. Ltd. (Singapore
Piping foreman
Responsible for all pre-fabrication spools on fabrication shop. Erection and installation of pipe on site. Responsible also for erection and installation of plant equipments (vessels, hopper etc.). I work under mechanical piping engineer. Assigned to lead plant maintenance for all mechanical equipment. Project scope plant construction, maintenance and shutdown.
May 2001 – May 2004
Allied Industrial Corporation – Taiwan
Mechanical Engineer/Plant Operator
Responsible for piping modification. Monitor and maintain good operation of all plant equipments. Supervised subcontractor for installation of piping and insulation. Operate centralized spray drying plant. Conduct inventory of spare parts for equipments and process piping. Job scopes production of food supplements
Nov.1997 – Nov. 1999
Super Electronics Co. Ltd. (Taiwan)
Mechanical Technician/Plant Operator
Operates different machine e.g. Automatic Cutting machine, Press Machine, Vacuum Sealer and etc. Perform maintenance work for all plant equipment and erect and install piping spools. Job scopes production of ferrites.
May 1995 – May 1997
Tung –Ho Steel Enterprise Corporation (Taiwan)
Mechanical Technician
Responsible for maintenance on all plant equipments. Fabrication of cooling pipe for electric furnace. Erection and installation of pre-fabrication spool for plant modification. Repair pneumatic and hydraulic cylinder for rolling machine and electric furnaces.
June 1993 – June 1995
Unilever Philippines – Paco, Philippines
Times Maintenance Corporation
Junior Fabricator Engineer
Calculates materials take-off of steel fabrication. Execute actual layout of plan according to Isometric Drawing. Responsible for pre-fabrication of spools and jacketed vessel. Additional duties as safety officer on site.