Juan Dominguez
Junction City, KY *****
************@*****.*** - 859-***-****
A position that will utilize my skills in leadership, problem solving, team player, and planning to improve barriers in communication and production. ACCOMPLISHMENT
Localization of commodities in 4 months saving $95,000 Oversee Start-up of new production plant in Monterrey Mexico. Implemented work procedures in Spanish for Production, Material Coordinator in Monterrey, Mexico. Negotiated a contract for solder that saved $10,000 annually. Gained control of inventory problems through employee teamwork training over 7-month period that improved inventory control from a negative $150,000 to a
positive $40 over control.
Implemented work procedures that achieved direct labor performance goal of 92% from a previous 64%.
Directed procedures on production line to reduce Inventory cycle count from $83,000 to $2,000. Utilized ISO14000 to successfully recycle solder dross and printed circuit boards.
WORK EXPERIENCE
Wiring Technician
RJ Corman RailRoad Signaling - Nicholasville, KY - June 2017 to Present
Lay out various sizes signal houses 6x6 thru 8x10 per layout prints, and schematics,install wiring panduit cut to fit using machine shop saw, Build relay Signal Board, install personality module,personality card, Battery chargers, electrologics, relays,equalizer and other electical components. Wiring Signal houses with different gauge wires, 6awg, 12awg,14awg,16awg,10awg per schematics, build cantilever and rail road install signal lights according to prints, assure quality standards on each house as required. Professional Spanish Medical Interpreter / Freelance Spanish Interpreter Central Kentucky Interpreter Referral - Danville, KY - 2004 to Present
Manufacturing Training, Railroad Safety Training, Face to Face Interpreting for Hospitals, Medical Health Clinics, Behavioral Health Clinics, Managed Care Clinics, Board of Education, ARC, Student Parent Meetings, DCBS / Family Services, Law Enforcement, and Lawyers. Car Loader /Shuttle Driver
RJ Corman RailRoad Switching - Georgetown, KY -
August 2016 to July 2017
Car Loader / Shuttle
Drive new vehicle's from Toyota assemly production plant inspect and check instrumental panel check all guages on panel are in working order and park in stageing area. Inspect new cars for dents scratches, drive up ramp load onto train rail carrier strap down and secure for shipment.
Buyer
Matsushita Home Appliance - Danville, KY -
2001 to 2002
Communicate with US/Mexico vendors on daily basis. Assure purchase orders are done in timely manner,analyze production allow time lead for production parts and verify all ECN's and request quotes for any parts that are assigned commodities and purchase. Maintain and ensure vendor quality standards. Implement cost down ideas. Project Coordinator
Matsushita Home Appliance - Danville, KY -
2000 to 2001
Coordinate production model movement with buyers to assure purchase orders are done in a timely manner.Localize new vendors and projects in Monterrey, Mexico. Coordinate Training for Production, and Material Coordination.
Liaison and Interpreter/Translator
Train new employees on production assembly line in new manufacturing plant in Monterrey, Mexico. Material Coordinator
Matsushita Electric Corporation Of America - Danville, KY - 1999 to 2000
Prepare parts kit check and assure correct parts are in order for production assembly line. Monitor internal and external inventory.
Complete international and export scheduling for lead time on parts. Production Supervisor
Matsushita Electric Corporation Of America - Danville, KY - 1998 to 1999
Supervisor duties for 30 hourly and 5 salaried employees. Coordinate and prioritize production activities to meet production schedules. Responsible for leading production employees to the success of ISO9002 and ISO14000 Quality Technician
Printed Circuit Board -
1997 to 1998
Monitored in process production of the final assembly of Printed Circuit Boards. Perform daily production test to assure quality of product and evaluation of components. Gather all manufacturing data, prepare, and present quality data analysis. Assisted with problem
solving and provided long-term countermeasures.
Operated electrical hand tester to evaluate for shorts, imperfect solder welds and malfunction of components. Troubleshooting circuit board testing equipment.Travel to vendors in Tijuana, Mexico to oversee trial run of production circuit boards.
Oversee production equipment removal for shipment to other company facilities in Tijuana Mexico. Lead Utility
Matsushita Appliance Corporation - Chicago, IL -
1995 to 1997
Monitored parts quality and ensured that parts were on line for utilization. Trained new operators on quality and use of correct method to Assemble. Expeditor
Stock Chaser -
1992 to 1995
Ensure accurate and timely delivery of parts/materials to the production line verified part numbers and counts. Assembly Line Worker
Matsushita Electric Corporation Of America - Franklin Park, IL - 1984 to 1991
Completed variety of production assembly.
EDUCATION
Some High School
SKILLS
MANUFACTURING SKILLS Front Line Leadership ISO 14000, ISO 9002, Quality Data Base, Technical Knowledge of Printed Circuit Boards, Fork Lift, Bilingual English/Spanish, Quality Corrective/Preventive (5 years)