SANJIT KUMAR DAS

AT/PO: Begunia,

Dist: Khurda, ORISSA

Mobile: +91-778*******)

E-Mail: ac4tv4@r.postjobfree.com

KEY QUALIFICATION

I have over six & half years experience in the field of Highway projects. I have carried out Quality Assurance/Quality control of pavement works for National Highway Projects. Also I am familiar with computer literature as MS Office. I am fully conversant with the laboratory procedures and field control test of the Highway projects and also conversant with the modern methods of construction and code of practices generally being followed for construction of highways and Bridges, (Well versed with IS Codes, ASTM, MOST guidelines.)

EDUCATION : B. A

COMPUTER PROFICIENCY : MS Office

EMPLOYMENT RECORD:

Period : November 2009 to till date.

Position : Lab Technician

Name of Employer : PSK Infrastructures & Projects Ltd.

Name of Project : Operation & Maintenance of 4-lane

Divided carriageway facility Constructed

On BOT (Annuity) on NH-5 in A.P, for

Nellore Bypass-Periodic Maintenance

Laying of Overlay.

Client : Nation Highways Authority of India.

Consultant : Span Consultants Pvt Ltd.

Concessionaire : NYSE Infrastructure Pvt Ltd.

Salient features of the projects:

The Project is Constructed laying of overlay of the Nellore Bypass reach from km 165+183 to Km 182+349 on NH-5 in the state of A.P. Total cost of the project is 570 cores.

Task Performed

Conducting Mix Designs for DBM & BC.

Calibration of Laboratory equipments & Plants. (Hot Mix Plant).

Carried out the pavement Roughness test by bump Integrator Machine.

Getting approval for Material sources & coordinating with the Consultant Engineer’s.

Maintain records of tests on materials and completed works

Assess and check all tests and carryout independent tests.

Review Quality control testing of all materials works are as per the technical specifications.

Preparing the monthly progress report of laboratory and checking the quantity of materials which are taken for the mobilization advance.

Period : January 2008 to November 2009.

Position : Sr. Lab Technician.

Name of Employer : PSK Infrastructures & Projects Ltd.

Name of Project : Design, Construction, Development,

Finance, Operation and maintenance

of Km 367.000 To Km 464.000 on

NH-7. (Contract Package No: NS2/

BOT/AP-2).

Client : Nation Highways Authority of India.

Independent Consultant : Span Consultants Pvt Ltd.

Concessionaire : GMR Pochanpalli Expressways Pvt Ltd.

EPC Contractor : GMR Projects Pvt Ltd.

Salient features of the projects:

The Project is Construction and strengthening of existing two-lane carriageway to four lane divided carriageway from km 367+000 to Km 407+000 including Bypasses, section of NH-7 in the state of A.P. Total cost of the project is 570 cores. A total length of 44 Km. consists of 3 bypasses, 1ROB, 5 minor Bridges & 153 Culverts, drains and service duct, retaining walls and Service roads etc.

Task Performed

Testing of all materials (Soil, Cement, Aggregate, Bitumen and CRMB) with reference to I.S Codes.

Conducting Mix Designs for GSB, WMM, BM, SDBC, DBM, BC etc.

Calibration of Laboratory equipments & Plants. (WMM Plant, Batching Plant, Hot Mix Plant etc).

Carried out the pavement Roughness test by bump Integrator Machine.

Getting approval for all Material sources & coordinating with the Consultant Engineer’s.

Maintain records of tests on materials and completed works

Assess and check all tests and carryout independent tests.

Review test results of quarry and borrow area material suitability for use on the project.

Review Quality control testing of all materials works are as per the technical specifications.

Preparing the monthly progress report of laboratory and checking the quantity of materials which are taken for the mobilization advance.

Period : December 2010 to January 2013.

Position : Sr. Lab Technician.

Name of Employer : PSK Infrastructures & Projects Ltd

Name of Project Design, Engineering, Construction,

.Development, Finance, Operation and

Maintenance of 4 Lanin of Pune -

Solapur Road NH-9

. IndependntEngineer km144.400tokm249.000NHDPpha

Salient features of the projects: ICT pvt,Ltd

Balance work of widening to 4 lanes and upgrading of the existing 2-lane road including minor bridge (upto 30mt), service road and auxiliary works in the state of Maharashtra Pradesh between km 144.400 to and km (Mohal) section of NH-9 Construction package Maharashtra under NHDP phase Carriageway with shoulders, drains, service duct and Environment mitigation works. PSK infrastructures pvt.Ltd Construction executing this project with IL $ FS Construction Ltd of Hyderabad .

Task Performed

Preparation of Request for Inspection (RFI)

Preparing monthly progress report of laboratory and prepare the Bar charts..

Maintain records of tests on materials and completed works.

Carried out the calibration of all Laboratory equipments.

Carried out Quality control tests of material sources for different pavement layers and structures as earthwork in Embankment, Sub grade, and Sub base, Base & Wearing Courses

Conducting Cement & Concrete test. (i.e. Fineness, Consistency, Initial & Final setting time, Specific Gravity and Cube test)

Conducting various aggregate tests. ( GSB Material, Sieve analysis, 10per cent fines value, Flakiness & Elongation, Impact value, Specific Gravity)

Conducting various bituminous test & Bitumen mix. (i.e. Penetration, Softening point, Ductility, Elastic Recovery, Viscosity, Stripping value, Specific Gravity, Extraction, Marshall stability and Flow test)

Field dry density test. (Sand replacement method & Nuclear density gauge)

Checking the Calibration of Batching plant, hot mix plant and Laboratory equipments.

Period : June 2013

Position :Sr. Lab Technician.

Name of Employer : Laxmi civil Engineering Services.pvt.Ltd

Name of Project : Darbhnga-Samastipur Road (SH-50) to . SHOBHAN VILLAGE (NH-57)

on the western embankment of khiroi river.

Clientt RCD Road division Darbhanga.

.

Salient features of the projects:

The Project is up gradation of State Highways (Darbhnga – Samastipur) The cost of the project is Fifty Five cores. A total length of 10 Km. consists of 7 m and 9 m carriageway with shoulders, drains and service duct, retaining wall and Environment

Mitigation Wark

Task Performed :

Conducting various soil tests. (i.e. Liquid limit and Plastic limit, Proctor, Free swell Index, Grain size Analysis and CBR Test)

Conducting Cement & Concrete test. (i.e. Fineness, Consistency, Initial & Final setting time, Specific Gravity and Cube test)

Conducting various aggregate tests. ( GSB Material, Sieve analysis, 10per cent fines value, Flakiness & Elongation, Impact value, Specific Gravity)

Conducting various bituminous test & Bitumen mix. (i.e. Penetration, Softening point, Ductility, Elastic Recovery, Viscosity, Stripping value, Specific Gravity, Extraction, Marshall stability and Flow test)

Field dry density test. (Sand replacement method & Nuclear density gauge)

Maintain records of tests on materials and completed works

Preparation of the Bar charts.

Salient Features of the Projects:-

(Construction of Plant Road Network Phase – II of 3.0 MTPA Integrated Steel Plant of NMDC Limited) at Nagarnar, Chhattisgarh, India-Pkg. No. EW-98”-Progress at Site Reg. LAC No. – HO (Contracts)/NISP/PRN/PH-II/2014/444/30/1910.

Task Performed :

Conducting various soil tests. (i.e. Liquid limit and Plastic limit, Proctor, Free swell Index, Grain size Analysis and CBR Test)

Conducting Cement & Concrete test. (i.e. Fineness, Consistency, Initial & Final setting time, Specific Gravity and Cube test)

Conducting various aggregate tests. ( GSB Material, Sieve analysis, 10per cent fines value, Flakiness & Elongation, Impact value, Specific Gravity)

Conducting various bituminous test & Bitumen mix. (i.e. Penetration, Softening point, Ductility, Elastic Recovery, Viscosity, Stripping value, Specific Gravity, Extraction, Marshall stability and Flow test)

Field dry density test. (Sand replacement method & Nuclear density gauge)

Maintain records of tests on materials and completed works

Preparation of the Bar charts.

Period : March 25/03/2016

Position : Sr. Lab Technician

Name of Employ : ARSS Infrastructures & Projects Ltd.

Name of Project : Construction of Plant Road Network Phase -II

of 3.0 MTPA Integrated Steel Plant of NMDC Limited

Client : NMDC Ltd.

Independent Consultant : MACON Ltd.

Concessionaire : ARSS Infrastructures & Projects Ltd.

Languages

:

Language Speak Read Write

(a). Oriya Excellent Excellent Excellent (b). Hindi Excellent Excellent Excellent

(c). English Good Good Good

(d). Telugu Good

(e) Bangoli Good

PERSONNEL INFORMATION:

Date of Birth : 24.6.1981

Permanent Address (Correspondence) : AT/Po- Begunia,

DIST- Khurda, ORISSA - 762062

Mobile No :, 077********

E-Mail : ac4tv4@r.postjobfree.com

Nationality : Indian

Expected Salary :

CERTIFICATION

I, the undersigned certify that to the best of my Knowledge and belief, this Bio-data correctly describes my qualification, my experience & myself.