Curriculum Vitae. Jayaraj.P.
QC-Welding/NDT/AUT/Coating Insp.
CSWIP-Sr.3.2/AUT/PCN/NACE/ASNT–Lev-II.
Jayaraj.P.
*/**, ******* ***** **** Road,
Thiruvottiyur, Chennai- 6000 19,
Tamilnadu, INDIA.
e-mail:*******.****@*****.***
****************@*****.***
Mob No-+91-988*******.(India)
Land No-+91-735*******.(India)
QA/QC Insp (Welding/AUT,NDT/Coating.)Aramco App AUT Interpreter & Welding Insp.
Sr.Welding Insp CSWIP-3.2,/ NACE-Coating-Lev-2/PCN & ASNT–Lev-II.
CSWIP-AUT-Lev-2-PA/TOFD Data Interpreter./PCN-Lev-2-UT-3.1&3.2/MT/RTFI.
Personal Details.
Name : Pydipati. Jayaraj.
Nationality : Indian.
Date of Birth : 30th May 1970.
Languages known : English, Hindi ( Fluent.)
Passport Details : No : : Z-1759086 (Exp Date-25/02/2019)
Technical Engg Qual (Pass in 1990) : Diploma in Mechanical Engineering.
Holding UAE Driving Licence : Licence No--63628863/Exp-10/01/2027
Professional Qualifications
Welding Inspection Qualifications.
1)Senior Welding Inspection (CSWIP-3.2)Cert No-95286.
Date of Expiry-22 AUGUST 2019.
2)Diploma In International Institute of Welding (IIW).
3)Diploma In European Welding Inspection Practioner.
Coating / Painting Qualifications.
1) NACE International-CIP-Lev-2-Cert No-21807
Date of Expiry-28 FEBRUARY 2021.
Non Destructive Testing Qualifications.
1)Automated Ultrasonic Testing( AUT) PHASED ARRAY(Pipe WIZARD) DATA INTERPRETER,
CSWIP-Lev-2 (As per ISO 9712 & EN 473,Cert for NDT Personal) CSWIP-Cert No-595302
Date of Expiry-25 August 2021.The Course & Exam done at TWI-ABERDEEN-UK.
2)Hands On Training in “Advanced Phased Array UT,Using Omni Scan-PA & TOFD” Inspection & Data Acquisition & Data Analysis Using “Tomoview” Software. Done at Blue Star Limited,Chennai,India,In Association with M/S OLYMPUS NDT Training Academy-CANADA.In DEC-2008.
3)The British Institute of Non Destructive Testing (BINDT)-PCN-Lev-2 in UT-3.1,3.2,MT,RTFI-PCN No-310622.
4)ASNT (SNTC-TC-1A,2006 Edition)Lev-2 in UT,RT,RTFI,MT&PT.(Date of Expiry-2020.)
QMS (ISO-9001-2008) Lead Auditor : IRCA-Course Number-A17120.
(Guardian Independent Certification- Cert Number-LAC/11108.(Val upto 09 March 2015)
Pte Ltd.)
Safety Training Programs.
1)Opito Approved BOSIET(BASIC OFFSHORE SAFETY INDUCTION & EMERGENCY TRAINING)Certificate-Valid Until 10 MARCH 2019,Done at Survival Systems India,
Certificate No-11065700110315004.
2)Holding PANAMA-CDC-Seaman Book No-1191117/Valid Upto 13 FEB 2022.
3)Holding Oil & Gas UK(OGUK)-Pin No-OGUK/2008/1266,Offshore MEDICAL Certificate Valid Until 27 FEB 2019.
4)Holding International Certificate of Vaccination for YELLOW FEVER,Valid Until 08 FEB 2016.(Port Health ORGN-Govt of India).
Career History / Projects Work Experience In Chronological Order.
Having more than 24 years of experience in various Oil & Gas Projects in the field of QA/QC,Inspections.
Out of 25 Years Experience,7 Years worked as a QC Client Inspector for Various Client/Company Projects, QG-II-Qatar Gas, MAERSK oil Qatar, KJV-Gorgon Australia,NDC/DNV-Abudhabi/China,
RELIANCE/BECHTEL-USA.
19-Years Abroad Experience ( Saudi Arabia,Qatar,Azerbaijan,Angola,Nigeria,Indonesia-
6-Years in India. -UAE,China,Iraq,Israel,Malaysia & Egypt.)
(Nigeria & Qatar Offshore Platforms Hook-ups / Qatar,India,Indonesia,Iraq,Israel & Egypt-Offshore Pipelay.AUT-PA/TOFD Data Interpretation-6 Years).
Familiar of Codes & Standards. :Familiar with ASME,API,AWS,ASNT,ANSI,NACE & DNV-OS-F101 Codes &Standards related to Welding,Piping,Onshore Pipeline,Offshore Pipe Lay & Mechanical.Have knowledge in Fab, Insp &Testing viz. CS,LTCS,AS,SS,Duplex,Super Duplex, Cuni,CRA( Corrosion Resistant Alloy-Cladded PipeLine )etc @ various stages of Construction.
Responsibilities carried out as a QA/QC (Welding/Coating/NDT.)
Being a Certified Diploma Holder in Mech Engg,Total around 24 Years Exp of Inspections in
Construction/Installation of Offshore Pipe Lay, Onshore Pipeline, Offshore Platforms,FPSO
Modules Modifications,Risers,Offshore Platforms Hook-ups, Onshore RIG Fabrication, Refinery,
Petrochemical,Gas Plants & Construction of LNG Jetty Marine Structures, PAR’S, Cryogenic,
Condensate & Duplex & Super Duplex Piping Fabirication,Erection & Welding &
Painting Activities.
.Summary of Offshore Experience.
Total of around 9 years,working in Offshore-Quality Control&Inspection of Welding
Coating/Painting of Pipelay Installation,Jacket Installation,Plets/Plems,Topside&Hook-up Projects.
Inspection Activities Included but not Limited to in Offshore as Follows.
Welding.
Review of ITP, WPS/PQR for Pipeline/Piping/Structural Fabrication works.
Qualifing of Welders as per ASME Sec IX, API-1104, DNV-OS-F101 & AWS-D1.1).
Interpretation and Evaluation of NDT (RT, MT, PT, UT& AUT) Reports.
Interpretation of Radiographs as per ASME--V,ANSI 31.3, API-1104 and AWS D1.1.
Witnessing MT, PT, UT as Requested and Report Review.
Preparing RT repair Instruction Tracing Sheet, Issue to Construction Crew and follow-up.
Welding Inspectors Supervision and Surveillance.
Witnessing of Destructive Testing including Fracture Analysis.
Preparation of Daily welding reports, NDT Co-Ordination.
Review Procedures of Welding Consumables, Monitoring /Check and Control.
RFI Approvals by Contractor & Client for Inspection Release.
Witness of HYDRO,PNEUMATIC TESTS / TIE-INS / PWHT.
Witness of Punch works & Clearing Punch List Items.
Material Receiving Inspection,Fit-up,Dimensional Welding Visual,NDT,Hydro-Test Inspection for Vessel,Tanks & Piping as per ASME, API, ANSI, BSI, AWS, etc.
Automated Welding Equipment System (GMAW)Familiar with.
1) JAWS- JRay Mc Dermott.
2) PHOENIX-All Seas.
3) SERIMAX-Global Offshore.
4) CRC EVANS-Leighton Offshore.
5) SWS-Saipem welding system.
Coating/Painting.
Review the Coating/Painting Procedure.Verify/Review all Onshore/Offshore related Coating/Painting works carried out in accordance with the Approved PQP & Inspection & Test Plan.
Ensure all documentation to Execute the work such as Approved Coating/Painting procedures, Quality Control Codes & Standards are available at work site.
Verify that all applicable Equipment is Calibrated & have valid Certifications.
Check Coating/Painting Application process are carried out in accordance with Approved procedures & Specifications.Inspection & confirmation of Coating/Painting Materials as per the specifications.
Check & Witness of Profile Salt Test,Wet film Thick/Dry film Thick,Adhesive Test,Peel Test & Holiday Test.
Witness & Inspection of All Coating/Painting Activities,Review of Inspection documents.
Automated Ultrasonic Testing (AUT)
Review/Verify AUT System Verification, Documents & Inspection Personal Qualifications.
Verify all documentation to Execute the work such as Approved AUT Procedure/Specifications.
ECA-Approved document verification prior to start of AUT-Welding Testing.
Check the AUT Calibrations (Cal IN & Cal OUT) as per the Procedures.
Online Monitoring and Evaluate the Scan result of Girth Welds Using Tomo Viewer.
Interpretation & Audit of AUT- PHASED ARRAY & TOFD Methods.
Witness & Inspection of AUT,MUT activities,Review of AUT,MUT documents & Have the Authority to Reject Defective work and carried out the weekly Auditing
Automated Ultrasonic Testing (AUT) Scans Familiar Monitored & Interpreted.
1) SHAW PIPELINE AUT-INFOCUS & Hybrid PHASED ARRAY-Pipe WIZARD.
2) RTD-Netherlands-ROTO SCAN.
3) OLYMPUS/Oceaneering-RD Tech-Pipe Wizard.’
Summary of Experience on Projects.
From :-Jan-2018 To Till date. ( EGYPT-Offshore-ZOHR Field Development Proj)
Saipem Barges-COSTORO-1.
Company : ENI / PETROBEL Seconded by RINA Inspection,ITALY.
Project : ZOHR Field Development Proj
Inspection : RINA Inspections
Designation : QC Client Inspector (Welding/AUT,NDT& Coating)
Offshore Pipelaying QC Inspections on PIPELAYING,30” & 8”dia.,Routine Monitoring & Random Inspections on Welding,AUT & Coating activities as per the Project Specifications,Client Specifications & International Standards.
References :Mr.William (*******.**********@****.***)
From :-Oct-2017 To Jan-2018. ( SAUDI-Fadhili Onshore & Offshore Upstream Facilities Div)
Company : L&T/EMAS-Saudi Arabia ONSHORE Pipelines.
Project : Hasbah Offshore Gas Facilities Increment-II
Inspection : Saudi Aramco/L&T/NDT CCS.
Designation : AUT Interpreter (Aramco Approved-Validity-2022.)
Onshore Pipelines QC-AUT Interpretation on PIPELINES,36”dia X 40.64 & 31.75 mm.,Routine Monitoring & AUT Interpretations on daily AUT Scans as per the Project Specifications,Client Specifications & International Standards.
References :Mr.Sankar Munusamy (QC *******-**.******@************.***)
From :-April-2017 To Aug-2017. ( EGYPT-Offshore-ZOHR Field Development Proj)
Saipem Barges-COSTORO-6,10 & PMS-12
Company : ENI / PETROBEL Seconded by RINA Inspection,ITALY.
Project : ZOHR Field Development Proj
Inspection : RINA Inspections
Designation : QC Client Inspector (Welding/AUT,NDT& Coating)
Offshore Pipelaying QC Inspections on PIPELAYING,26”,14” & 8”dia.,Routine Monitoring & Random Inspections on Welding,AUT & Coating activities as per the Project Specifications,Client Specifications & International Standards.
References :Mr.William (*******.**********@****.***)
From :-Feb-2016 To Mar-2017. ( UAE-Sharjah Khalid Port,LAMPRELL Yard)
Company : HEEREMA Marine Contractors.
Project : Total-Block-32,KAOMBA Project Offshore Angola.
Client : TOTAL-E&P,Angola.
Inspection : Lamprell/Heerema/Total.
Designation : QC Inspector (Welding/PAUT/TOFD,NDT & Coating)
Fabrication of Buoyancy Tanks & Suction piles (Static load Equipment)QC Inspections on Fabrication & Erection of Structurals,Carbon Steel Piping Fabrication,Erection and welding Activities,Routine Monitoring & Random Inspections on Welding,PAUT/TOFD & NDT activities as per the Project Specifications,Client Specifications & International Standards.
References :Mr.Clark Gordon,Sr.Inspector.(*********@***.***)
From :Nov-2015 To Feb-2016. ( INDIA-Mumbai High OFFSHORE,Swiber Barges)
Swiber Triumphant,SeaMec-2.
Company : SWIBER Offshore Singapore Pte Ltd.
Project : Pipeline Replacement Project-4
Client : Oil and Natural Gas Corporation Limited.
Inspection : Swiber/DNV/ABS.
Designation : Sr.QC Inspector (Welding/AUT/NDT/Coating)
SWIBER Offshore Pipelay Installation of 136.55 KM,36 Nos of Risers Installation and Flexible Pipelines 15.8 KM.Topside Modifications of Existing Platforms-38 Nos.(Including Deck Modification/Strengthening/Extensions)QC Inspections on Pipeline Welding,NDT,AUT Interpretation &FBE Coating,HeatShrink Sleeves & other related Quality Control Inspection Activities.Witness and Inspection of Blasting & Painting of Structurals and Piping on the Existing Platforms.(Primer/Intermediate and Final Coating)
Reference :Mr.Brian Coward.QA/QC Director.(*****.******@******.***)
Mr.Bhanudas Biradar.QA/QC Manager (********.*******@******.***)
From :May-2014 To May-2015. ( INDIA-Chennai.)
Company : SIS NDT INSPECTION SERVICES.
Client : Multi Clients-Oil and gas Projects.
Inspection : Consultant for Inspections & Third Party .
Designation : Welding & NDT QC Consultant.
SIS Inspection services Inspects--Vessels,Skids with Piping,Mudmat Systems,Seperator Packages and Burner Booms Etc. QC Inspections on Fabrication & Erection of the above mentioned Oil and Gas Equipments.Piping.Routine Monitoring & Random Inspections on Welding & NDT activities as per the Proj Specifications,Client Specifications & International
Standards.Monitoring & Witness of Flushing,Leak,Pneumatic & HydroTesting.
From :May-2012 To Dec-2013. ( MALAYSIA-Lumut, Kencana Petroleum Const Yard )
Design & Const of LNG Jetty & Marine Structures.
Company : Chevron-KBR/CLOUGH (Joint Venture-GORGON)
Project : Gorgon Project,BARROW Island LNG Plant-Australia.
Client : CHEVRON Australia Pte Ltd.
Inspection : KJV-G.( Chevron-PMC) Welding/Painting &NDT
Designation : QC Client Inspector.(Chevron-PMC).
Chevron-Gorgon,Barrow Island-Australia,Construction of LNG Jetty & Marine Structures. QC Inspections on Fabrication & Erection of Tubular Structurals,Process CRYOGENIC Piping/Pipeline- Duplex & Super Duplex Piping Fabirication,Erection & Welding Activities,Routine Monitoring & Random Inspections on Welding & NDT activities as per the Project Specifications,Client Specifications & International Standards.
Witness and Inspection of Blasting & Painting of Structurals and Piping.(Primer/Intermediate and Final Coating)
Flushing,Leak,Pneumatic HydroTesting & Re-instatement witness.Assist on Pre-commissioning & Commisioning Activities.
References :Mr.Clark Gordon,Sr.Inspector.(*********@***.***)
From :Dec-2011 & Mar-2012. (ISRAEL-Offshore, All Seas Barge-MV-AUDACIA.)
16”X 28.02mm,Pipelay with 8”X14.3mm Piggy Back of 1.5 Kms.
10”X 20mm,Pipelay with 6”X 11mm of 2 Piggy Backs of 39 Kms.
Company : ALL SEAS Marine Contractor-Netherland.
Project : TAMAR Field Development-EAST-Pipeline-ISRAEL.
Client : Noble Energy Mediterranean Ltd.
Inspection : All Seas / Noble Energy.
Designation : QC AUT Interpreter/NDT/Welding Inspector.
All Seas Offshore Pipelay Installation of 16”&10”,QC Inspections on Pipeline AUT(Shaw core pipelines) Interpretation,Welding &NDT,FBECoating,HeatShrink Sleeves & other related Quality Control Inspection Activities.
References :Al Bright-Malaysia-Mr.Ian Mccall.(*********@********.***.**)
From :Mar-2011 To June-2011. (IRAQ-Offshore-48”X 22.23/20.62mm Dia Pipelay of 120 Kms)
(Leighton Barge-STEALTH.)
Company : LEIGHTON Offshore Middle East.
Project : Iraq Crude Oil Export Expansion Project Phase-1.
Client : South Oil Company IRAQ/Foster Wheeler.
Inspection : Leighton Offshore/GL-TPI,Abudhabi.
Designation : Lead QA/QC Inspector.( AUT Interpreter/NDT/WeldInspector.)
Leighton Offshore Middle East,48”Diameter Pipelay Installation-QC Inspections on Pipeline AUT(Oceaneering/RD Tech)Interpretation,Welding,NDT&AUT Interpretation, Coating,Heat Shrink Sleeves,PUF Infill & other related Quality Control Activities.
References : NES Global-Dubai-Mr.Neil Melin.( ****.******@*********.*** )
From :Sep-2010 To March-2011. (CHINA-BOAJI,Const&Comm of Onshore Oil RIG-7 No’s )
Company : Det Norske Veritas (TPI Services)
Project : LRAP-Onshore RIG Fab & Comm (BOMCO Yard-China)
Client : NDC-National Drilling Company-Abudhabi.
Inspection : Det Norske Veritas
Designation : QC Engineer.
National Drilling Company(Abudhabi) Fabrication & Commisioning of their Onshore OIL RIGS in CHINA-BOAJI with BOMCO, RIG-Fabrication Contractors.DET NORSKE VERITAS Assigned as 3rd Party Inspections.QC Inspections on Masts,Substructure,Frames,Draw work Skids,Castings & Forgings.Fabrication & Erection of Structurals,Piping, Equipment.Routine Monitoring & Random Inspections on Welding & NDT Interpretation & witness as per the Project Specifcations,Client Specifications & International Standards.Witness on FAT, Flushing, Leak,Pneumatic,HydroTesting & Re-instatement.Assist on Pre-commissioning & Commisioning Activities.
References :DNV-Abudhabi-Mr.Sirajudeen (**********.********@***.***)
From : Jan-2010 To Apr-2010. (QATAR-Offshore-ED-Process Platform Hook-up & Comm.)
(NPCC Barge-PLB-648.)
Company : MAERSK Oil Qatar A/S.
Project : Al Shaheen FDP 2005 Package 17/18.
Client : MAERSK Oil Qatar A/S
Inspection : MAERSK Oil Qatar A/S
Designation : QC-Client Inspector (AUT/NDT/Welding)
Maersk Oil Qatar ED-Offshore Platform Hook-up,Riser Lines Tie-in,Process Piping Tie-in to the Existing EA-Platform.QC Fit-up,Visual,Welding,NDT&Painting Inspections.RT Film Interpretation & UT witness. Flushing,Leak,Pneumatic,HydroTesting &Re-instatement witness.Assist on Pre-Com
& Commisioning Activities.
References : QA/QC Coordinator Mr.K.P.Rao (*******@**********.***)
From : June-2009 To Dec-2009. (Abudhabi-UAE-Offshore GA-Well head & GD,ED-Process
Platforms Construction in NPCC Yard.)
Company : MAERSK Oil Qatar A/S.
Project : Al Shaheen FDP 2005 Package 17/18.
Client : MAERSK Oil Qatar A/S
Inspection : MAERSK Oil Qatar A/S
Designation : QC-Client Inspector (AUT/NDT/Welding).
Maersk Oil Qatar Offshore Platform Construction From Cellar Deck to Upper Deck Structurals, Vessels,Equipment,Piping Fabrication & Erection.QC Inspections on Fabrication & Erection of Structurals,Piping-LTCS,SS,CUNI,GRE & Duplex & Super Duplex Piping Fabirication,Erection & Welding Activities.Routine Monitoring & Random Inspections on welding & NDT activities as per the Project Specifcations,Client Specifications & International Standards Requirements.Flushing,Leak,Pneumatic,HydroTesting & Re-instatement witness.Assist on Pre-commissioning & Commisioning Activities
References : QA/QC Coordinator Mr.K.P.Rao (*******@**********.***)
From : March & April-2009. (INDONESIA-Offshore-28”X 15.9mm Dia Pipe Lay of 23 Kms.)
Global Barge-DLB-COMANCHE.(KUALA TUNGKAL-PANARAN)
Company : Global Industries Pte Ltd-Singapore.
Project : TGI-Offshore Pipeline.
Client : Transportasi Gas Indonesia/Worley Parsons.
Inspection : Global Industries/TGI/Worley Parsons.
Designation : QA/QC Inspector.(AUT/NDT/Welding)
TGI-Indonesia Gas Operating Company,Existing Offshore Pipe Line Replacement From KP-110 to KP-133.New Pipe lay for about 23Kms.QC Inspections on AUT-RTD-Rota Scan systems Weld Interpretation,Pipeline,Welding,Painting,Coating & Cold-Servi Wrap Sleeves Installation,PUF Foam Infill Activities.
From : Oct-2007 To Jan-2009. (INDIA-Off Shore-Main Line-6”,8”,10”12”,16”,18”&24” Dia-
- PipeLay With 3.5”,4.5”& 6” Dia Piggy Back.)
ALL SEAS-Barges-DLB-TOGMOR for Shallow Water.
MV-LORELAY & AUDACIA for Deep Water.
Company : RELIANCE Industries Limited.
Project : Reliance KG-D6 Project-Dhirubhai 1&3 Gas Field Development.
Client : RELIANCE Industries Limited.
Inspection : RIL / Seconded by BECHTEL-USA.
Designation : QC-Client Inspector( RT Films & SPS-Shaw Core Pipeline Ser-
-vices Scanning & System AUT/NDT Interpretation.)
RELIANCE Indutries Ltd, Offshore PipeLay,Plet,Plem Installation,Hydro Testing & Commi- sioning Activities Between 400 & 2800 Mts,Depth on KRISHNA GODAVARI Basin of Bay of Bengal,INDIA-QC Inspections on Pipeline,Welding,NDT,AUT & RT Film Interpretation, Coating,Heat Shrink Sleeves,PUF Infill & other related Quality Control Activities.
From:June-2007 To August-2007. (QATAR-Off Shore-54.43 Kms 42”X22.23mm Dia Pipe Lay)
Mc DERMOTT Barge-DLB KP-1
Company : Qatar Gas-II ( Seconded by VELOSI Certification-Qatar)
Project : Common Condensate SPM Facilities Proj(Offshore 42”Pipe Lay)
Client : Qatar Gas Operating Company Ltd,
Inspection : QG-II-Qatar Gas.
Designation : QA/QC Inspector.(AUT/NDT/Welding).
QG-Qatar Gas Operating Company Ltd,Offshore Pipe Lay-54.43Kms 42”X 22.23mm Dia Pipe Lay
From Raslaffan Industrial City to PLEM-2 Pipe lay.QC Inspections on Pipeline,welding,Painting
Coating & PUF Foam Infill Activities.
From : March–2007 To June-2007. (INDONESIA-Papua Island.)
Company : SAIPEM-Indonesia.
Project : BP-Tangguh LNG Project.
Client : BP BERAU LTD.( 24”-2 Lines CRA-Pipe Lines 800-m Onshore )
Inspection : Saipem / British Petroleum.
Designation : QA/QC Coordinator.
BP LNG Tangguh Onshore Receiving Facilities, ONSHORE PIPE LINES-24”dia 2 lines Tie-Ins to Offshore Lines & LNG Plant,with 2-PIG Receivers.QC-Coordination for Quality Inspections, Issues & other related Quality activities including Civil,Pipeline Welding,Painting/Coating & Ndt.
From: July-2006 To Jan-2007. (AFRICA-NIGERIA / OFFSHORE-ACERGY-Barge-Seaway
ORION,JASCON-1 & MAJOR for EDOP-QI & GR Platforms)
SubCellar & Upper Deck Str /Risers,Pip Hook-up,Tie-ins & Commisioning.
Company : ( ACERGY-Formerly STOLT OFFSHORE.)
Project : East Area Project-EPC2B-NGL-Hook Up & Comm Works.
Clients : Nig Nat Pet Com / Mobil Producing Nigeria.( NNPC / MPN )
Inspection : NNPC / MPN / ACERGY.
Designation : QA/QC Engr.
On Existing Platform Additional Sub cellar Deck & Upper Deck Structural & Piping Erection With Pig Reciever & Launcher.Daily Fit-up,Welding & NDT inspections as per the Project & Client Requirements.Hydro Testing Witness & Reinstatement Activities Inspection & Assist on Precommisioning Activities for Start-up.
From: Feb-2006 To June -2006. (AFRICA-ANGOLA-Lobito Yard.)
Company : ( ACERGY-Formerly STOLT OFFSHORE.)
Project : FPSO Modules Struc & Pip Modifications ( ROSA LIRIO.)
Clients : Portumo / Total.
Inspection : Total / Portumo / Stolt Offshore.
Designation : QC Engr/Supv.
Routine Structural & Piping Fabirication,Erection & Welding activities For FPSO Modules. Duplex & Super Duplex Piping Fabirication,Erection & Welding activities.Supervision of Local Inspectors for Fabrication & NDT Activities. as per the Project & Client Requirements.Hydro Testing Witness.
From : May-2004 To Jan-2006. (AZERBAIJAN) Offshore Platforms Const & Comm.
Company : Tekfen (Amec,Tekfen,Azfen / ATA- Consortium.)
Project : (CA-CWP/PCWU) Central Azeri-Compresser & Water Injection
Process,Compression,Water Injection & Utilities Platform.
Clients : AIOC/ British Petroleum (B.P)
Inspection : AIOC/ British Petroleum /ATA.
Designation : Approved QC Welding,Piping & NDT Inspector.
Offshore Platform Construction From Cellar Deck to Upper Deck,Piping Fabrication,Erection & Welding Daily Structural,Duplex & Super Duplex Piping Fabirication,Erection & Welding activities. Supervision of Local Inspectors for Fabrication & Ndt Activities. as per the Project & Client require- ments.Hydro Testing Witness.Assist on Pre commissioning Activities.
From : June-2003 To Dec–2003. (QATAR)
Company : CCIC (Consolidated Contractors International Company)
Project : Raslaffan LNG Expansion Project (RLX-Train-3)
Client : RAS GAS
Inspection : RAS GAS
Main Contractor : Chiyoda & SnamProjetti (CMS&A)
Designation : Approved QC Welding, Piping & NDT Inspector.
RasGas Train-3 Piping Fabrication,Erection & Welding Daily Structural & Piping Fabrication, Erection & Welding activities.Routine Daily Inspections on Welded Spools & Ndt Clearance for spools Erection. as per the Project & Client Requirements.Hydro Testing Witness. Assist on Pre-
commissioning Activities.
From : Dec-2002 To May-2003. (INDIA)
Company : Petron Engineering.
Project : SHAR Rocket ( Second Launching PAD)
Client : ISRO (Indian Space Research Organization)
Inspection : ISRO (Indian Space Research Organization )
Main Contractor : MECON
Designation : QC Welding & Piping Inspector.
Duplex & Super Duplex Spools Fabrication,Erection & Welding activities.Routine Daily Inspections on Welded Spools & Ndt Clearance for spools Erection. as per the Project & Client Requirements.Hydro Testing Witness.
From : Sep-2001 To Nov-2002. (SAUDI ARABIA)
Company : Nesma /Agap Arabia Ltd.
Project : HARADH Gas Plant ( Technip Offsites & Utilities Project )
Client : Saudi Aramco
Inspection : Agap Arabia Ltd / Aramco.
Main Contractor : Technip Saudi Arabia Ltd
Designation : Aramco Approved QC Welding, Piping & NDT Inspector.
SAUDI-Haradh New Gas Plant Construction-Inspection carried out on Structural & Piping Fabrication,Erection & Welding Activities.Routine Daily Inspections on Welded Spools & Ndt Inspections & Release of Structurals & Piping spools for Erection. as per the Project & Client Requirements & Hydro Testing Witness.
From : Jan-2001 To Aug-2001. (INDIA)
Company : Petron Engineering.
Project : Expansion of N2 Plants
Client : Hindustan Petroleum Corporation Ltd
Inspection : Engineers India Ltd
Main Contractor : Petron Engineering
Designation : QC Inspector for Piping & Welding.
Fabrication,Erection & Welding activities.Routine Daily Inspections on Welded Spools & Ndt Clearance for spools Erection. as per the Project & Client Requirements.Hydro Testing Witness.
From : Sep & Oct-2000. (QATAR)
Company : Mideast Construction (MECON)
Project : DUKHAN Oil Field
Client : QAPCO
Inspection : QGPC
Main Contractor : Technip Qatar Ltd
Designation : QC Welding,Piping & NDT Inspector.
Pressure Vessel,Piping,Structural Fabrication,Erection & Welding activities.Routine Daily Visual & NDT Inspections on Welded Spools & Structurals.Ndt Clearance for spools Erection. as per the Project & Client Requirements & Hydro Testing Witness.
From : Sep-1995 To Aug-1999. (Mohammad Al Mojil Group-SAUDI ARABIA)
Piping Fabrication/Erection,Welding & NDT-QC Inspector.
Project/Client : Saudi Cement Expansion (HOFUF)/ Saudi Cement.
Inspection : MMG / Saudi Cements.
Main Contractor : KHD HUMBOLT WEDAG (GERMANY)
Project/Client : Sadaf Expansion Projects-MTBE(AL-JUBAIL)/SABIC.
Inspection : MMG / Brown & Root
Main Contractor : Brown & Root Saudi Arabia Ltd.
Project/Client : Saudi Methanol Project (AL-JUBAIL)/AR-Razi-3
Inspection : MMG / Mitsubishi / AR-Razi
Main Contractor : Mitsubishi Heavy Industries Ltd.
Project/Client : Additional Fract Capacity(RASTANURA)/Juaymah Gas Plant.
Inspection : MMG / Saudi Aramco.
Main Contractor : Japan Gas Corporation (JGC)
Project/Client : Polymer Plant (YANBU)/Yanbu Petrochemicals.
Inspection : MMG / Yanpet.
Main Contractor : Mitsubishi Heavy Industries Ltd.
Assigned On Various Projects as a QC Inspector for Piping,Structural,Welding & Ndt Inspections to carry out the Quality Inspections As per the project & Client requirements on Quality Activities.
From : 1990 -1995 ( INDIA)
Kinetics Technology of India Ltd:Pressurized Sewing Adsorber(PSA N2 Plants)Piping Fabrication
& Erection activities. Stage Wise Inspection for Piping & Welding. Documentation for NDT Works, Hydro Test witness & Re-instatement.
Ion Exchange India Ltd :De-Mineralized Water Treatment Plant,Job Involved Stage wise inspe- ection in Fabrication & Erection of Piping,Tanks,Vessels etc,Coordinate with Client Insp for various Inspection activities.Arrangements for NDT,PWHT with Sub contractors,Inspection & witnessing of Hydro,Pneumatic & Service Tests.Preparing & Submitting QA/QC documents.
Kinetics Technology of India Ltd :Revamp of Fired Heaters & Agitated Piping. Responsible for Stage wise Insp in Fab & Erec of Piping. Coordination with Client Insp for various Insp activities.
Tata Consultancy :LP Steam Piping for Tank Wagon Heating(Hindustan Petroleum Corporation Ltd).Stage wise Inspection for Piping Fabrication,Erection &Testing.Preparing documents for NDT Works,Re-instatement & Mechanical Completion.
India Tube Mills & Metal Industries (Hindustan Petroleum Corporation Ltd) Storage Tanks Con-
struction of Floating Roof & Cone Roof.Stage wise Inspection for Fabrication, Erection & Testing. Preparing for NDT works as per Project Requirements.
END