SYED SHAFIQUZZAMAN

Mobile: +923*********

HOTMAIL: z **********@*******.***

GMAIL: s *********@*****.***

SUMMARY OF QUALIFICATIONS

High Qualified Engineer with 32 years of experience in a Mechanical field. With super solid back ground Knowledge in thermal power plants. Also Have a strong technical knowledge

& skills in Operation, Planning and Supervision of Gas turbine power plants with proven track record for operational excellence. Supervised and followed commissioning and testing in large power plant projects.

ACHIEVEMENTS RECORD

● Prepared GT operation check list.

● Reviewed and edited Black out restoration with the extension in the power plant.

● Taken over Hydrogen Plant from Contractor and trained all staff for operation.

● Operation of Fuel Crude Oil Treatment Plant.

● Trained technicians and engineer in power plant operation field.

● Lead the DCS F oxboro replacement & upgrade project at power plant-8.

● Working as consultant with PP8 Manger/Director.

EDUCATION & TRAINING

● B.E. Mechanical (4 yrs Degree): N.E.D. Engineering University Karachi Pakistan-1980.

● One year On-Job Training for Boiler, Turbine, Electrical Systems & Auxiliaries Operation & Maintenance.

SUMMARY OF EXPERIENCE

Riyadh-PP8 ABB 11D5, GE 7FA & GE 7EA with TIAC (Turbine Inlet Air Cooling) System

Commissioning & Testing:

● Followed MK V & VI, EX-2000 and GT startup.

● Followed Generator, power transformer, and switch gears checks.

● Participated in BOP equipment / systems commissioning checks.

● Supervised simple cycle performance testing.

● Followed mod bus / DCS loop & control checks.

● Followed testing & commissioning of gas turbine conversion to gas fuel.

● Checked MV/HV switching and inter locks.

● Participated in commissioning liquid fuel & gas treatment plant.

● Participated for crude oil pipe line replacement in PP-8. Plant Operation Supervision:

● Supervised GT operation activities

● Carried out MV/HV switching operations

● Supervised Fuel unloading / transfer maneuverings.

● Supervised crude oil pipe line operation including scrapper cleaning, Royalty Metering Proving.

● Supervision of Fuel Crude Oil Treatment (Unwashed to Washed) for use in Gas Turbines

● Supervised water treatment plant.

● Supervised hydrogen generation plant.

● Trained and mentored engineers & technicians.

P age 1 of 3

175 MW Juba Power Plant, GE (6xframe6)

Power Plant Shift in charge Engineer:

-Supervised shift operation activities

-C arried out MV/HV switching operations

-Conducted fuel management

-Restored emergencies

500 MW PP-7 Powe Plant, GE 7E

- Supervised shift operation activities

- C arried out MV/HV switching operations

- Conducted fuel management

- Restored emergencies

KESC (Karachi Electric Supply Corporation) Ltd. Karachi- Pakistan 100 MW (4 x 25) GE Gas Turbine unit Korangi-Pakistan

● Worked as Assistance Executive Engr. Mech. Maint. for Turbine /Workshop section

Page 2 of 3

Employment History

Saudi Electric Company-Central Operating Area, Riyadh –Saudi Arabia Position Held Period Key Responsibilities

Operation

Manager (acting)

April

2014 to

30th

Nov

2017

Directed all operation activities, supervised performance, operation Planning & services, conducted MV/HV switching and isolations, participated in commissioning activities in PP-8

Section Engineer

Operation

March

2012 to

2014

Directed all operation activities & operation Planning, conducted MV/HV switching and isolations, participated in commissioning activities in PP-8

Unit Eng A Aug 96 to

March 2012

Participated in testing and commissioning activities, followed gas turbine PAC tests, witnessed performance tests simple cycle, Participated in DCS commissioning of turbine control interface Followed testing & commissioning of gas turbine conversion to gas fuel in PP-8

Unit Eng B June 95 to

Aug-96

Shift Operation In charge in PP-8

Unit Eng B March 88

to J une 95

Shift Operation In charge in Juba plant

Unit Eng B May 83 to

March 88

Shift Operation In charge in PP-7

KESC Ltd. Karachi, Pakistan

Assistant

Executive Eng

(Mech. Maint)

Aug 81 to

Feb 83

Worked in Korangi thermal (KTGT) Power Plant.

Assistant

Executive Eng

(Power Gen. O

& M Trainee)

Aug 80 to

Aug 81

One year ON-the-Job Training for Boilers. Steam Turbines & BOP Operation & Maint. in different Power Plants of KESC Page 3 of 3