Christopher Segunde Gomez D. Cueto Apartment# ** Kanluran St.
Barangay Gulod Itaas
E-Mail: ac4ov5@r.postjobfree.com Batangas City, Batangas, Philippines
ac4ov5@r.postjobfree.com Home: +63-43-984****
Mobile: +639**-*******/ +639*********
Skype ID: chrisgomez19
Job Summary
24 years of experience in Construction Industry with projects such as High Rise Buildings, Factory and Hotels and Mixed-Used-Developments involving Project Management, Quantity Surveying and Site Implementation and Commissioning works such as
Owner side MEPF system testing and commissioning
Provide drawing and Plan review for JW Marriot Hotel projects in reference to Fire and Life safety codes and standards and also to the MDS (Marriot Design Standards) 14
Provide Technical report with regards to Fire and Life safety requirements and submit to JW Marriot Project Manager
Attends the Project Technical Group Meeting.
Conduct factory Audit with regards to the fire and life safety conditions of Ready –made Garments manufacturing industry in Bangladesh
Provide Technical Report for the factory audit conducted and submit to the Project Manager
Supervises the day to day activities of our workers
In charge of QA/QC works
Coordinate the approval of installed works at site by main contractor and consultant
Attends the Project Technical Group Meeting.
Ensures that the company’s quality standards are being implemented on site
Change order evaluation
Shop drawing development
Testing and commissioning
Engineering and Design review
Cost and Quantity evaluation
Project Management
Supervises the Electrical and Mechanical works at site
Quantifies the Materials required at site
Supervises the Cable pulling and termination at site
Supervises the Electrical and Mechanical works at site
Experiences:
Shinryo Corporation (Dubai branch) Senior Electrical Engineer Al Karama, Dubai November, 2017 to Present Noguchi Memorial Institute for United Arab Emirates
Medical Research, project
University of Ghana, Accra
Republic of Ghana
Main Contractor: Shimizu Corporation
Brief Description:
In charge of the Testing and commissioning of all the electrical systems from HV/MV (11kV) to ELV systems including coordination of the interface works for the Mechanical systems..
Shinryo Corporation (Mauritius branch) Senior Electrical Engineer Port Lois, Republic of January, 2017 to August, 2017 Mauritius Telecom Data Center Mauritius
Tier-4 Class Data Center project
Port Lois, Mauritius
Main Contractor: RG- Grinaeker
Brief Description:
In charge of the Testing and commissioning of all the electrical systems from HV/MV(22kV) to ELV systems including coordination of the interface works for the Mechanical systems..
Jensen Hughes International Fire protection/Life safety Specialist Keunshin Annex Building January 27, 2014 to April, 2016 JW MARRIOT HOTEL PROJECTS Suite-312/251-1 Dohwa-
Accord for Bangladesh Foundation Dong/ Mapo-Gu, Seoul, Korea
H&M Garments Factory Audit at
Phonm pehn, Cambodia
Courtyard Siem Reap at Siem Reap Cambodia
Brief Description:
To provide guidelines and gather field data in regards to the implementation and application of Fire and life safety codes and standards acceptable to JW Marriot Hotel projects and providing the proper information with regards to fire safety and life safety to both the management and safety practitioners in the Ready- made Garments manufacturing industry in Bangladesh in behalf of the European buyers.
Shinbo Vina CO. LTD. Senior Electrical Engineer Room 402; 90-92 le thi
Rieng
NOVEMBER 2011 to January, 2014 JW MARRIOT HOTEL PROJECT P. Ben Thanh, Q1, TP, Ho
HANOI, VIETNAM Chi Minh, Vietnam
Main Contractor: Hyundai
Engineering & Construction
Brief Description:
- Senior electrical engineer in charge of MV and LV (power, lighting, fire alarm, telephone
CATV and security) system for JW Marriot hotel project, an 8-storey commercial building designed to cater to the growing tourism industry in Vietnam
JUNG WEON CO. LTD. Senior Electrical Engineer Room 402;90-92 le thi Rieng
NOVEMBER 2010 to 2011 JW MARRIOT HOTEL PROJECT P. Ben Thanh,Q1, TP, Ho Chi
HANOI, VIETNAM Minh, Vietnam
Main Contractor: Hyundai Engineering
&Construction
Brief Description:
- Senior electrical engineer in charge of MV and LV (power, lighting, fire alarm, telephone
CATV and security) system for JW Marriot hotel project, an 8-storey commercial building designed to cater to the growing tourism industry in Vietnam
TAISEI CORPORATION Senior Electrical Engineer
April, 2008 to AUGUST, 2010 DOHA ROAD DOUBLE DECKING P.O.Box31202, Dubai,
RAS AL KHOR CROSSING- R800/5 U.A.E
04-321-7750
Brief Description:
Senior Mechanical- electrical engineer in charge of MEPF’s and Utility(sewerage, drainage, irrigation,traffic signal system) works for a road infrastructure project with two underpasses and two bridge type overpasses connecting the business bay area and Dubai mall including the world renowned Burj Khalifa tower. Electro-mechanical system consist of the construction of three (3) utility substation to provide power for the street lighting at two parallel roads and two parallel bridges and underpasses, two (2) drainage pumping stations to connect and collect storm water system connected to the road and underpass network, one (1) fire pumping station designed as underground to provide fire water to the hose reel system at the underpasses.
SHINRYO (Phil) CO.INC. Electrical Engineer Room. 403 One Corporate Plaza Bldg.
December, 2005 to April, 2008 Joya lofts & Tower Project 845 A. Arnaiz Ave. Makati City
Brief Description:
-Assistant to the project manager for electrical and life safety, security systems works of these twin tower commercial and residential building situated at the heart of the Philippines financial district which is Makati (south tower is 51 storey and the north tower is 49 storey’s).
SKI Const. Group Inc. Electro-Mechanical Manager 17th/flr. Phil-am building,
May, 2005 to December, 2005 Operations head-MEPF Paseo De Roxas Avenue, Makati City
North Triangle Commercial
Center Project (TRINOMA)
Brief Description:
-As an operations head assist the project manager and project director for the MEPF and Architectural nominated sub-contractors’ scope of works such as coordination and execution in cooperation with the group of engineers and architectural staff, this project is a commercial (mall) owned and operated by one of the most successful realty developer in the Philippines (Ayala land Inc.)
RIDER HUNT LIACOR INC. Electrical Engineer Unit-1108 East Tower, PSE Bldg.
September, 2004 to May, 2005 PM/CM-Division Exchange Road, Ortigas, Ave. Pasig City
The Montgomery Place
Project, phase 1b and phase 3
Brief Description:
- As part of the construction management division, (consulting) in charge of all electrical works, these project is a first class residential hub owned and developed by Ayala Land Inc. built to provide a world class community which is safe and secure. This project is situated in E. Rodriguez avenue, Quezon city, Philippines.
FAWAZ ELCTRO-MECH. CONT. CO.WLL Electrical Engineer P.O. Box 1170, Sharjah
April, 2003 to June, 2004 EMAAR Properties United Arab Emirates
Emirates hill Project
Brief Description:
- In charge of all electrical works, this project is a two cluster block building with each block has a 4 building 7 storey’s high for each building, it is situated at emirates hill, jebel ali. Our company is subcontractor to Al-Hashemi contracting, the developer, EMAAR properties is the first class developer in the UAE.
SHINRYO (Phil) CO. INC. Electrical Engineer Room. 403 One Corporate Plaza Bldg.
January, 2002 to April, 2003 Phillip Morris Project 845 A.Arnaiz Ave. Makati City
Brief Description:
- A Tobacco manufacturing plant located at First Philippine Industrial Park, at Baranggay Anastacia, Sto Tomas, Batangas, Philippines. A 25- hectare manufacturing facility for Marlboro and Philip Morris cigarettes. I am in charge of electrical works for the water treatment, waste water treatment, production building and chemical storage building.
TYCO INTEGRATED SYSTEM, INC. Project-In- Charge /Electrical 2561 Lamayan St.
February, 2000 to January, 2002 Analog Devices Project Sta. Ana, Manila.
Phase II & Phase III
Brief Description:
-This project is a micro-chip (semi- conductor) manufacturing facility which is a fit-out type of project situated at Gateway Industrial park, General Trias, Cavite, Philippines. Our company is subcontractor to Fluor Daniel(Main –contractor) and our scope of work is Electrical,,instrumentation and process piping and fire fighting works including fire alarm system. We have provided all this system in areas such as 100k cleanroom and 10k cleanroom.
RIDER HUNT LIACOR INC. Electrical Engineer Unit-1108 East Tower, PSE Bldg.
June, 1999 to February, 2000 PM/CM-Division Exchange Road, Ortigas Ave.
Pasig City
The Industrial Galvanizing
Plant project
Brief Description:
- As part of the construction management division, (consulting) in charge of all MEPF works, these project is a steel processing facility providing fabrication and zinc iron coating(galvanizing) using automated machineries. This project is located at Trece Martirez city, Cavite, Philippines.
.
MERALCO IND’L ENG’G SERVICES CORP. Const. Supervisor/MEP works 4th/floor 1000
May, 1998 to November, 1998 LRT-1Rehabilitation Project Renaissance
Tower
Ortigas avenue,
Pasig City Brief Description:
This project is a rehabilitation /improvement of the existing mass transit system at the heart of the capital of the Philippines the power system was improved from 480Vdc to 750Vdc and also the railway system was improved in the aftermath of the 7.2 richter scale earth quake that hit the country in July,1991.
K.TA.(SARAWAK) SDN. BHD. MEPF Engineer at site Lot-8650 Jalan simpang
March, 1997 to March, 1998 Bakun Hydo-elect. Power Project Tiga, Sarawak, East, Malaysia
Malayan Assurance Bldg.
Rajang Port Project
Brief Description:
Our company is a design and project management consulting firm base in Sarawak east Malaysia that provides technical services on various types of construction project from design stages to construction completion. Bakun hydro power plant, in charge of the design of electrical power system for the relocation site of the displaced villages that was affected by the construction of the dam, the federal government of Malaysia have provided this villagers with a new site complete with shop houses,schools, university, and hospital in the new site. Malayan Assurance building- is a 20 storey building located in Kuching, Sarawak, East Malaysia. Rajang Port is a federally funded port facility that handles the processed timbers and logs in the sarikei division, Sarawak, East Malaysia. My main responsibility in this project is to ensure that contract design and specifications and conditions are being complied at site .
SHINRYO (Phil) CO.INC. Electrical Engineer Room. 403 One Corporate Plaza Bldg.
June, 1994 to September, 1996 Three Salcedo Place Project 845 A. Arnaiz Ave. Makati City
Brief Description:
Our company is a MEPF (Japanese management) subcontractor that specializes for Mechanical -electrical, plumbing and fire- fighting works. The project is a twin tower 26 storey commercial/ residential facility located in Makati city, Philippines, developed and managed by Ayala land Inc.
EDUCATION:
ADAMSON UNIVERSITY Bachelor of Science in Electrical Engineering 900 San Marcelino St.
October, 1992 Ermita, Manila
SKILLS :
MICROSOFT WORD
MICROSOFT EXCEL
MICROSOFT PROJECT
PERSONAL:
Place of Birth: Parañaque City
Date of Birth: November 04, 1968
SSS: 03-9851790-4
TIN: 169-656-600
PRC: 0015036-95
PASSPORT NO.: EB7083399