• Civil Engineer with 28 years of construction experience, 16 years solid project management experience in the Philippines for various government and multi-million foreign funded projects.

• More than 5+ years in Power plant and desalination project, 6 years in Petro-chemical, oil and gas various projects, and 18 years several water resources, water supply, medium rise building, road works, and pipeline projects.

• Extensive knowledge in project management, multi discipline works, quantity surveying, estimation, quality control and assurance.

• Works in principal client abroad such as SWCC – Saline Water Conversion Corporation, SABIC, Saudi Aramco, National Industrial Gas Company and Saudi Chevron.

• Works in local client in the Philippines LWUA, MWCI, MWSI, DILG, DPWH and various foreign funded projects.

• 6 years with EPC contractor that is KENTZ Engineers now (SNC Lavalin), 6 more years in Poyry Switzerland Limited as Owners Engineer for Ras Al Khair Power and Desalination Plant.

• Registered Professional Civil Engineers in the Professional Regulation commission Licensed no 0073023


• Being a part of the owner’s engineer team in the construction, commissioning and warranty of Guinness world record largest desalination plant in the world producing more than 1.2million cubic meter per day and 3000MW power plant.

• Part of the U&O and Kentz Engineering team in the construction and completion of one of the largest Petrochemical plant –Saudi Kayan Petrochemical Complex- 2007-2012


Project Quantity Surveyor for Owner’s Engineer (Consultant)

Poyry Switzerland Limited 2012-Present

Key Achievements:

Work as the only Project Quantity Surveyor for the owner’s engineer for a USD 7.2Billion Ras Al Khair Power and Desalination Project looking into project weekly and monthly progress. Power plant producing 2400MW with 12 Gas Turbines and 5 Steam Turbine, Desalination Plant consist of 8MSF and 2 RO plant producing 1,050,000m3/day.

Assist to CM/PM in some contracts, construction, quality assurance and safety matters.

Guide and direct resolution of project difficulties and complex control problems.

Interact with clients and attend regular meetings and provide reports.

Warranty Assurance and quality control management.

Detailed estimation of all the materials, equipment, manpower and time schedule. Review and checks of the quantities as per IFC drawings, and prepare a detail logs of the required quantity of materials, equipment to be installed, mobile equipment to be use, manpower schedule, time and cost schedule.

Determine design changes and schedule slippages impact.

Develop and maintain establish standards to exhibit schedule and plan hierarchy and inform project and company management.

Review and evaluate project change orders for variation approval.

Prepare weekly and monthly progress executive consultant report.

Identify construction and maintenance costs on materials, equipment and labor.

Create, review and manage project schedules to identify progress, lead times and project sequences.

Manage organizing the hand over certificates as per project requirement.

Checks and verified hand over certificates/ Turn over documents from construction, pre-commissioning and commissioning stages

Support the discipline engineers in organizing construction and commissioning procedures towards the project completion.

Site progress evaluation and measurements in related to contractor’s payment progress.

Civil Engineer/ Quantity Surveyor for KENTZ Engineers International Limited (now member of SNC Lavalin group) 2005-2012

Work Description

Preparation of payment application request for civil and structural works, mechanical piping and equipment delivery and installation, electrical and instrumentation equipment delivery and installation.

Manage and engineered the erection of 230KV lattice gantry structures, reviews, inspect according to approved ITP, preparation of punch-list reports, QVD completion and submit drawings to client for approval regarding structural and civil modifications.

Administer civil excavation, cable trenching works, duct-banks, structural platforms and pipe-racks, concrete foundations, substations, transformers foundation and cages.

Survey and analyze IFC drawings, specifications and site conditions related to the scope of work for engineering documentations.

Keep updates of all site changes and variation order request.

Interface with EPC contractor’s regarding interface work issues and resolve all concerns regarding quality control and assurance.

Reconcile commercial disputes based on the approved method of measurement.

Resolve engineering and technical issues associated with designs, estimates and construction related to civil, structural, steel supports, equipment alignment, surveys, fabrication and erection deficiencies, standards failure, and procedures.

Providing technical supports and analysis for the preparation of Method of statements, ITP, QVD, M&DS, RFI’s, updated IFC drawings, and specifications Saudi Aramco (SAES), SABIC (SES), Royal Commission (RC standards) and Saline Water Conversion Corporation (SWCC standards)

Attended seminars on Assertiveness and Essential Skills in Management on Corporate Learning Consultants Ltd courses in Saudi Arabia for key client Kentz Engineers & Constructors.

Projects completed in SNC Lavalin (Kentz)

a. 2005-2006 Shaybah Gas and Oil Separation Plant GOSP2

b. 2006-2007 Saudi Chevron Phillips

c. 2007-2008 National Industrial Gas Company

d. 2008-2012 Saudi Kayan Petro Chemical Complex


Project Manager, Lead Project Engineer 1989- 2005

Lead Project Engineer : 2004-2005 China Kuangye Non ferrous metal Limited

Site Project Manager : 1997-2004 ME Sicat Construction Company Inc.

Site Project Engineer : 1995-1997 MMRR Construction

Site Superintendent : 1990-1995 MV Construction

Project Coordinator : 1989-1990 Victory Seven


Exploratory well drilling for Local Water Districts for water supply Projects under KFW German Funding Agency. (P21M)

Construction of Rural Water Supply and Sanitation Phase V Projects under Japan Bank Inter cooperative Fund (P14M).

Feasibility studies on tapping the shallow aquifer of Laguna lake as water supply for the Municipality of Taguig and Pateros.(P3.25M)

Construction of Two storeys 12 classrooms building in Casiguran, Sorsogon (P21M) under Local Gov’t Funding Institute-World Bank loans.

Engineering and construction of Casiguran, Sorsogon Public Market (P28M).

Pipe-laying, hydro-testing, flushing, dis-infection, interconnection works and commissioning of 30km Main transmission line steel pipes ranging from 600mm to 1200mm diameter and 85kms PVC pipes.

Pipeline relocation along EDSA-Shaw Boulevard to Boni Avenue due to MRT-EEI Project.

Road concreting and drainage works of the 4km provincial roads of Irosin, Sorsogon.

Asian Development Bank Funded P120M Calamba Water Districts Phase II Project includes 80km pipe–lines, ground reservoir, pump stations, intake boxes, chlorination building, and gen-set building. (P120M)

14kms concrete and road asphalting of Calamba-Tagaytay Road connecting the province of Laguna and Cavite.

Angeles City Water Supply Expansion Project Comprising of 112km of distribution pipelines, 30km of main pipelines, 3- pumping station of turbine water pumps, 3-submersible pumping stations, electro mechanical works, 5000cum. Concrete ground reservoir, pipe bridge crossings, aqueducts, spillways, and a high service pump stations with 4-250hp pumps and 750KVA power generators. (P175M)


1984-1989 Baliuag University Bachelor of Science in Civil Engineering

1980-1984 St Paul School Secondary

1974-1980 San Rafael Elementary School Primary

Civil Engineer Professional registration no.0073023


Operating System – Windows 10 Word, Excel, Powerpoint

Applications – MS Office, MS Project 2012, Windows 7


Patrick Martin Construction Manager Poyry Switzerland Ltd


RAKPP Phase I Project

Ras AL Khair, KSA

Frank Kenny Project Manager Poyry Switzerland Ltd


RAKPP Phase I Project

Ras AL Khair, KSA

Anthony Uy Project Manager SNC Lavalin


Contact this candidate