ANURAG KUMAR
AT+PO-Madhopur, P.S.-Majholiya,
Dist-W.Champaran, BIHAR PIN-845454
ID- ac4mox@r.postjobfree.com
Birth Date:29/11/1990
Birth Place: Madhopur
Nationality: Indian
Passport Status: Available
Languages: Hindi, English, Tamil
Employment History
JUNE 2010 Paricha power plant (2*250mw)
Site engineer Jhansi, U.P.
Turbine pedestal blue matching
M.O.T. erection, B.F.P. erection & alignment.
C.E.P. pump to motor blue matching.
In mot tank A.O.P., E.O.P., J.O.P. blue matching.
Commissioning of dearator tank
NOVEMBER 2010 Shree Mega Power (2*150mw)
Site engineer Beawer, Rajasthan
Fabrication, erection & hydro of Condenser.
Erection & alignment of B.F.P.
Blue matching of M.O.P.& Packer plate.
Oil line piping & also oil flushing.
Also involves in Commissioning.
JULY 2011 Salasar steel & power Ltd (65mw)
Site engineer raigarh, Chhattisgarh
Erection of H.P. heaters L.P. heaters, M.O.T. tank & Condenser.
Generator erection, M.O.P. blue matching & oil line piping.
H.P. & I.P. casing parting plane matching & Erection.
Seal bore reading, rotor slope reading & correction & horn drop reading.
Oil flushing & commissioning, Also Condenser hydro test.
B.F.P. Alignment & Commissioning.
Box-up of turbine.
JULY 2012 D.S.C.L. Sugar ajbapur (20mw)
Service Engineer Overhauling
Turbine steam consumptions are increases in GE make turbine .
Turbine casing open & found labyrinth seals on H.P. side is damaged .
Turbine rotor & diaphragms send-blasting done.
Turbine & generator Bearings D.P.test.
Generator & rotor Varnish Also cleared.
Alignment completed & turbine running on bearing-gear.
After rolling turbine running in good condition. SEPT 2012 MCL, Tamilnadu
Service Engg 18mw SNM
SNM make turbine sparks created in running time & also vibration created.
Turbine rotor H.P. side fins damaged gone workshop for re-fining.
Turbine bearings D.P. Test completed.
After re-fining Alignment completed.
After rolling turbine running in good condition.
NOV 2012 Nandi,Sugar karnatka
Service Engg 18mw SNM
Turbine have Vibration problem,
Alignment between Turbine & Gear-box is good.
Alignment between Gear-box needs correction.
Generator shifted & takes reading.
Reading completed & rolling completed.
After rolling turbine running good condition.
DECEMBER 2012
Turbine AMC at 4x135 MW Jindal steel and power limited, Raigarh.CG Job responsibility: - Maintenance of 4x135 MW STG set including all auxiliaries, pipelines and valves related to Turbine.
NOVEMBER 2013
Joined SHIN THERMO DYNAMIC ENGINEERING PVT. LTD (Chennai) an associate
of SHIN NIPPON MECHANARY CO. LTD, JAPAN
Till working in same organization.
Job responsibility: - Site engineer for erection and commissioning / Overhauling of SNM Turbine. (Turbine Engineer)
EDUCATIONS
2004-05(10th) K.R. High School, Bettiah (69.5%)
2006-07(+2) M.R.R.G. Collage, Bettiah (56%)
2008-10(diploma) Birsa institutes of engg & tech (72%) Other Experience
.Diploma in computer application.
. Tally & c++ & Auto cad
References
Available upon request
Regards
ANURAG SINGH