Resume

Sign in

Plant Commissioning

Location:
Abu Dhabi, Abu Dhabi, United Arab Emirates
Salary:
15000 AED
Posted:
February 23, 2018

Contact this candidate

DADHANIA BIPINKUMAR. V

E-Mail:-ac4k6m@r.postjobfree.com/ ac4k6m@r.postjobfree.com

Mobile: +971-*********, +91-957*******

PLANT OPERATIONS ~ INSTALLATION & COMMISSIONING ~ SAFETY/ QUALITY

PROFICIENCY FORTE

A seasoned professional with over 20 years of rich and valuable experience in the field of Plant Operations, Installation & Commissioning, Safety in Oil & Gas and Chemical Industries.

Deft in checking LEL, O2 and H2S like Multiwarm, Cosmos, etc.

Expertise in safety systems like Deluge Valves, Fire Monitor, Hydrants, Fire Extinguishers like DCP Co2 & Chemicals Foam.

Well Versed with Work Permit System; underwent training in Fire & Safety Drills.

Possess strong interpersonal and analytical skills with an ability to motivate people.

Good Supervisory potentials and Understanding of specific engineering discipline, technical knowledge and skill.

CURRENT ASSIGNMENTS: - Spie Oil & Gas at Abudhabi (GASCO PROJECT TGCS AL TAWEELAH) 6th Nov 2017 AS PROCESS TECHENICIEN

PREVIOUS ASSIGNMENTS: - GS ENGINEERING AT SAUDI (PETRORABIGH) 11th March-16 to 12th March-17 (AS A PRE-COMMISSIONING SUPERVISOR)

Pre-commissioning for the TPO and PMMA PLANT AT PETRORABIGH PROJECT.

Receives Project documentation and understands Scope of Work related to Process discipline.

Lead a team of technicians to undertake commissioning activities in projects.

Interfaces with other disciplines to ensure integration of activities.

Undertake functional and Operational tests for various Process Systems.

Preparation of method statements, procedures and routines where required.

Reports on work progress, bringing to notice potential problems or delays and recommends solutions.

Assist during the database preparation for precommissioning status index and commissioning technical database for Mechanical Systems.

Plan, Monitor and assist in Vendor activities as required.

Ensure temporary supplies and commissioning spares are adequate for the subsystem testing.

Perform inter-discipline checks, Compliance in accordance with HSE Standard.

TAKREER REFINERY RRE#3 PROJECT 9TH MAY 2013 to 30 May-2015

(SAMSUNG ENGINEERING CO) @ RUWAIS AS COMMISSIONING SUPERVISOR JOINING CONTINEUCE OFFSITES AND UTILITES PROJECT

Responsible & following up process loop/ piping flushing by applying different methods (water/air/chemical cleaning/pig cleaning ect.)& final reinstatement.

Supervising Performance of of pre-commissioning test:- Air leak test, Rupture test Nitrogen inerting ect.

P&ID check for system readiness for mechanical completion, punch list, co-ordination of mechanical completion in accordance with procedures.

Responsible for utilities pre-commissioning & commissioning Activities of dray out of steam generation system (High pressure Boilers) with steam super heater, steam blowing ect.

Execution of pre-commissioning & commissioning activities during dynamic test.

Responsible for start-up and commissioning of rotating equipment like pumps & compressor, steam and steam turbines.

Individual systems walk through for mechanical completions, documentation for request for inspection (RFI) & punch list activities.

Enforce the safety awareness in the workspace & permit to work system, toolbox meeting and LOTO procedures.

Refinery Flare commissioning and operation trouble shooting conduct during normal operation with Vander.

Refinery fire water system and cooling water system Commissioning and Normal operation trouble shooting Logics problem rectify as per designs

TAKREER REFINERY MUSSAFAH TARMINAL@ABUDHABI 01 MAR 2012 TO 12 MAR 2013

Planning and monitoring for pre-commissioning and commissioning activity, P&ID review, as per schedule and plant, overseas site construction and completion job handled by EPC contractor, safety review and Execution. Air blowing, Flashing, Nitrogen purging and commissioning all terminal system. Punch list clearing, walkthrough, transmittal clearing.

Fire water system, foam system, pump operating, pipeline commissioning, tank commissioning (ULG, JETA1, GAS OIL). Co-coordinating for maintenance and inspection related activity for tanks & pumps.

CAIRN ENERGY INDIA PVT LTD @ BARMER

01-October-2011 to 29- Feb-2012

AS POST OF PRODUCTION SUPERVISOR

Planning and monitoring Pipeline & Tank farm operation of crude oil, pipe line Pumps as a Booster pumps & Export pumps of made by Nova pig-none pumps Discharge pressure is 100 bars from Mangla terminal to shalaya pipeline Also Performing Activity like a pumps state-up and shutdown and CTM proving activity then operating of online Auto grab sampler handling and monitoring the water daring of crude oil tanks, Housekeeping activity.

BHARAT OMAN REFINARY LTD. (SRU BLOCK) 4 March 2011 to 15 September 2011

Planning, monitoring & controlling different projects. Supervising project activities and drawing specifications with the contractors to ensure drawings are as per the specifications.

Installing and inspecting internals for Reactor (SRU,ARU,SWS & TGTU), Columns and vessels.

Supervising loading of catalyst to reactor’s in co-ordination with licensor (EIL).

Performing all cleaning activities which include Water flushing, UG flushing, Air-blowing, steam blowing and Chemical cleaning of BLOWER suction line and cleaning of SS lines, degreasing of amine circuit

Checking the plant with P&ID and Isometric drawings, detail study of PFD and P&ID for the plants.

Maintaining system preparation and system flushing, box-up and charging and monitoring loading of Catalyst and carbon to convertors in co-ordination with licensor (EIL).

Marking P&ID for making pressure test packages and Flushing Schemes.

Checking the format based on the plant according to isometric drawings

Performing hydro test and pneumatic test of different system, understanding the process description of the project and handling process data sheets for various equipments such as vessels, pumps, air fan coolers, etc.

Verifying documents such as equipment List, datasheets (equipment & instruments).

Handling all types of rotating equipments wiz, Centrifugal pump, reciprocating pumps, MUG compressors etc.

Knowledge of DCS and process optimizing through it.

DM water circulation through DCS, working as a panel operator (ARU,SWS,TGTU)

Co-ordinating with the other units regarding different utilities and charging HP steam and monitoring the activity through DCS.

Stabilizing FLARE, fire water network and Steam -condensate systems.

Costal Gujarat Power Ltd (TATA Power Mundra) Since Jan 2011 toFeb-2011

AS A COMMISSIONING SPECIALIST

LP Pipe Line Commissioning activity

DM Water Plant Commissioning activity

Service Water Line Commissioning activity

RAW Water Line Commissioning activity

Al-Khafji joint Operations, Saudi Arabia. (ARMCO GULF OPERATIONS & KUWAIT GULF OIL COMPANY) Since Feb 2010 to15 December-2010

AS A COMMISSIONING OPERATOR

PLANT OVER VIEW

Oil & Gas Separation

Undertaking direct supervision of erection and commissioning.

Provide Oil and Gas Separation facility designed to produce 600.000BPD. of Crude Oil

50 MMSCFD of Gas to be delivered to off shore with dew point specification lower than -5oc

Condensate with an RVP Specification lover than 11psig A production of 834 BPD of condensate can be achieved,

Medium pressure gas production 32 MMSCFD

Low Pressure Gas Production 25.7 MMSCFD

Finalizing requirements/ specifications in consultation with project owner/ end users, engineering departments/ collaborators, external suppliers.

Overseeing and implementing effective techniques to bring efficiency in operations, improve quality standards & achieve maximum cost savings.

Managing overall operations with a view to ensure timely accomplishment of targets within the time and cost parameters.

Co-ordinating activities with accountability for strategic utilization & deployment of available resources to achieve organizational objectives.

Low pressure, medium pressure, Lift Gas Compression

Gas processing facilities including NGL Extraction using propane refrigeration & NGL Fractionation (deethanizer and condensate stabilizer)

Associated utility system (Flare, Hot Oil, Refrigeration, LP/MP Fuel Gas, Chemical, Closed and open drain System, Air Compressor, Nitrogen unit, Fire Water System.

Key Deliverables

Handling of commissioning crude oil and Gas Separation plant

Maintaining various types of gas compressors (LP,MP, Lift Gas) Plant and Propane Refrigeration and Gas turbine Pre-commissioning and commissioning work

Supervising High Gas pressure line lift gas 1400 PSI pre-commissioning and commissioning work

Maintaining gas turbine lubricating system commissioning

Propane bullet, hot oil,nitrogen, air compressor commissioning

EQUIPMENT PURVIEW

Hands-on experience of working with:

oPumps - Reciprocating & Centrifugal

oHeat Exchanger-Shell & Tube

oDistillation Coolum - Plate and Packed

oCooling Tower - Natural and Induced Draft

oTanks

oReactors

Reliance Industries Ltd., Jamnagar (Under Caliber Personnel Service Pvt. Ltd.)

(May 2008 to Jan 2010)

FIELD EXECUTIVE

Understanding overall operations for improvement of existing products with thrust on reducing product cost

Based on market trends / requirements.

Organizing and analyzing various data before formulating loading plans for final storage of vessels

Key Deliverables

Working in Refinery Tank Farm and handling import of crude oil and various types of finished products such as HSD, SKO, ATF, NAPTHA, PX, OX and storage of LPG.

Maintaining various types of Tanks such as Floating Roof Tanks, Internal Floating Roof Tanks, Con Roof Tanks, Dome Roof Tanks, Sphere, etc.

Handling storage of raw materials & finished goods and ensuring proper storage of LPG/ Propylene.

Managing pre commissioning of Pipelines Pigging (6” to 24” line), Card Board Blasting, Air and Water Flushing, Pipelines Nitrogen Purging, etc.

Handling closed loop sampling system for benzene, LPG, propane, and propylene sampling from Horton sphere water draining activity of the tanks.

Tank Gauging with oil company person and Gov officers.

As an activity participant of the team responsible for the smooth and safe operation of total 126 tank &23 spheres at the world largest grass root refinery.

Supervising Hydro testing, Hold Testing & Leak Testing of pipelines.

Ensuring proper commissioning of Tanks, Centrifugal Pumps, Pipelines, etc.

Maintaining tank accessories like Pontoon, Roof Legs, Roof Drain, Emergency Drain, Hyphen Drain, Breather Vent, Rim Vent Weathering Seal, Roof Ladder, Dip Hatch Catholic Protection, Rim Seal System, Foam system, Sprinkler and Deluge System and instrumentation like Foam Pourer, ATG, DHE, LSHH, etc.

Attainments

Successfully took part in Line commissioning & Pre-commissioning, Hydro Test, Cardboard Blasting, Pigging, Nitrogen Flashing, etc.

KHT pumps house commissioning & pre-commissioning work in DTA plant

Perfect Mineral, Kosamba May ’98 to Apr ‘08

Production In-charge

Attainments

Instrumental in handling operations at Plaster of Paris Plant.

Pivotal in commissioning new plant in a rotary clines, crusher, pulverizer, etc.

Kanoria Chemicals Industries Ltd., Ankleshwer. May ’96 to Apr’98

Plant Chemist

Attainments

Pivotal in handling operations at Penta-Errihrotal Plant.

Played a major role in managing Formaldehyde Plant working on DCS System.

Spearheaded commissioning of Formaldehyde Plant.

Pivotal in handling new expansion penta - Errithrotal plant commissioning & pre-commissioning.

Played a major role in striping column installation and commissioning.

Commenced Career at Acme Petrochemical, Ankleshwer. Jun ’95 to Feb ‘96

As Shift Supervisor

SCHOLASTICS

B.Sc. (Chemistry) from Sauvrastra University in 1995.

PERSONAL DOSSIER

Address : 402-Aum residency Appt sheedhi park Khambhaliya road, Near Atul pump Jamnagar-361006, Gujarat.

Date of Birth : 6th May 1972

Present salary : 2500$ USD

Expected salary : As per company rules

Passport No : H2132099

Nationality : Indian



Contact this candidate