Name of Staff : D. Venkateswara Rao
Profession : Civil Engineer
Date of Birth : 7 th November 1969
Years with Firm : New Entrant
Nationality : Indian
Membership with
Professional Societies : Nil
Email : ac4jvt@r.postjobfree.com
Phone : 790-***-****, 903-***-****.
Address : D no- 2-448, kapula street, near High school
Ubalanka, Ravulapalem, East godavari,
Andhra Pradesh - 533237.
Detailed Tasks Assigned:
• To Check setting out of the project as per the norms and as per the MORT&H Specifications
• Inspect the Work and check compliance with the specifications
• Carry out Quality Assurance of Pavement and Bridge works
• To order, supervise or perform tests on materials and/or work
• To order the uncovering of completed work and/or the removal & Substitution of proper materials
and/or works
• To check/monitor the progress of the work and suggest corrective Measures
• To examine any work, which is about to be covered
• To examine and attend the measurement of the completed works
• To check the sub contractor's accounts, invoices and other statements
• To supervise the Sub contractor's work in all safety measures
• To maintain day-to-day project dairy this shall record all events. Pertaining to the administration of the
contract
Sr. No
Name of Employer
Post Held
Project Name
Period
Assignment in Project
Client of the Project
Remarks
From
To
SRRC Ind pvt Ltd
Project manager
Nov 2017 to till Date
CDM smith
Bridge engineer
August 2015 to Oct 2017
GCKC PROJECTS PVT LTD
Project Manager
Nov 2013 to July 2015
A
Road and drain improvement works in CMC Karwar, CMC Dandeli, TMC Bhatkal,TMC Kenya, TP Ankola, TP Honnavar, TP Siddapura,TP Yellapur, TP Mungod and TP Haliyal Limits UTTAR KANNA DA DISTRICT.
GMR Infra structure LTD
ASSOCIATE MANAGER (Structures)
Aug 2011 To Sept 2013
A
Development of outer ring road (ORR) on Design, Build, Finance, Operate and transfer( DBFOT) Annuity basis at Chennai from km0+000 (NH205) TO km 29+650(NH 205) in state of Tamil Nadu
Geosol Associates
Project Manager
Aug 2009 To July 2011
A
Six Laning of NH-8 from surat to Dahisar section of NH-8from km. 263.000 To km 502.000(lenth Km.239.000) in the state of Gujarat &Maharashtra to be Executed as Bot (TOLL)on DBFOpattern under NHDP (phase-v)
PRASAD & COMPANY LIMITED
Senior Engineer
Feb 2007 To July 2009
A
Construction and Supervision of NH-7, TN-5 Dindigul-Samayanallore (373.725-426.600) in the state of Tamil Nadu
IJM (INDIA)
Site Engineer structures
Jan 2006 To Jan 2007
A
Construction and Supervision of Jhansi Lakhnadoni NH-26
Lakshmi Sai Construction Company
SITE ENGINNERING
Sep 1995 To Dec 2005
A
Construction and supervision of Jaipur to Daosa NH-29
Koneru Constructions
Junior Engineer
Nov 1993 To July 1995
A
Irrigation Department KanalEarth Dams at Vijayawadaa and Chalapalli
Education:
B.E( CIVIL)
DIPLOMA(CIVIL)
Key Qualification:
Mr. Damodhara venkateswararao a graduate in Civil Engineering I having more than 24 years of professional experience in the field of Project Execution management, Construction Supervision structures and rewalls, Rate analysis, Quality Assurance/ Quality Control Management, Quantity checking, Project site management in construction of National highway projects and Bridges. Worked for construction. Further, having experiences in the construction of Retaining Wall, Stone pitching, Chute drain, Culverts, Reinforced Earth Wall, I am having experience with reinforced soil wall structures with Block and panel facia geogrid as soil reinforcement specialization in rewal mechanically stabilized earth wall using with geo grid totalblocks withgeo grid 120000m2 panels withgeo grid panels with paraweb60000m2 total 180000m2. My experience also includes structures such as, concrete box culverts, bridges I have good knowledge of relevant IS, IRC, BS and MORTH specifications. I have managed number of projects with FIDIC contracts norms. I have in-depth Knowledge of asphalt mix designs, material-testing methods for soil, Concrete, asphalt and familiar with modern construction technique
Nov 2107 to Till Date Project Manager
SRRC IND PVT LTD
Project name : Execution of Earthwork in formation, Construction of Minor Bridges, Blanketing, P. Way linking works including supply of P-way fittings, Track ballast, PSC Sleeper and Points & Crossings in connection with construction of Railway Infrastructure from 12/000 KM LP to 18/610 KM LP, KRL- Lara Section of NTPC Railway Siding, in Raigarh District, Chhattisgarh State (Package – II B).
Project Length : 6.1Km
Lane : Single line
Project Cost : 95 INR Crores
Funding : NTPC-LARA
Client : NTPC-LARA
August 2015 to Oct 2017 Bridge engineer
CDM SMITH
Project Name : upgrading arcot to villupuram road(SH-04)from km29+000 to km
110+165 and km 113+325 to km 114+600
Project Length : 83Km
Lane : 2
Project Cost : 320INR Crores
Funding : TNRDC
Client :TNRSP2
Main Project Features: The Project included construction of Major Bridges: 3 No’s, Minor Bridges: 17 No’s, Flyovers: nil, RoBs: nil, Underpasses/Overpasses: Nil, Culverts (Box/Pipe): 61/76 No’s and any other: drain 26km.
Details of Major Bridges/Strucutres are:
Bridge /Structure Name
Length (m)
Span Arrangement
Foundation
Super structure
Construction type
Major bridge
200m
12*15.2
Pile foundation
RCC
Retained
Major bridge
320m
14*21.7
Pile foundation
RCC
Retained
Job scope and Responsibilities:
Overall supervision of the physical progress of work using modern Project Management Techniques to ensure execution of the project within the time schedule avoiding time and cost overruns.
Preparation of method statements for various activities of works such as Earth work, Sub-Base, and other bituminous works etc. Checking the setting out and quality assurance of work, assure the quality of laboratory testing of materials and check the laboratory, plant and machinery required for timely completion of the work. Also monitored the operations and ensured that the mixed material brought to the site met with specifications requirements. Other responsibilities included verification and certification of sub-contractor’s interim payments and documentation of all measurements and testing reports, examine claims of sub-contractor.
Oct 2013 To July 2015.
GCKC PROJECTS PVT LTD
Project Manager
Nagarthon improvement of drain and road in Karwar district.
Project Length : 30Km
Lane : 2
Project Cost : 110INR Crores
Funding : GOVT
Client : DUDC Karwar.
Main Project Features: The Project included construction of Major Bridges: Nil, Minor Bridges: Nil, Flyovers: nil, RoBs: nil, Underpasses/Overpasses: 2 No’s, Culverts (Box/Pipe): 4 No’s and any other: nil.
Details of Major Bridges/Strucutres are:
Bridge /Structure Name
Length (m)
Span Arrangement
Foundation
Super structure
Construction type
NIL
NIL
NIL
NIL
NIL
NIL
Job scope and Responsibilities:
Overall supervision of the physical progress of work using modern Project Management Techniques to ensure execution of the project within the time schedule avoiding time and cost overruns.
Preparation of method statements for various activities of works such as Earth work, Sub-Base, and other bituminous works etc. Checking the setting out and quality assurance of work, assure the quality of laboratory testing of materials and check the laboratory, plant and machinery required for timely completion of the work. Also monitored the operations and ensured that the mixed material brought to the site met with specifications requirements. Other responsibilities included verification and certification of sub-contractor’s interim payments and documentation of all measurements and testing reports, examine claims of sub-contractor.
Aug 2011 To Sept 2012 GMR Infra structure LTD
ASSOCIATE MANAGER (Structures)
1.Development of outer ring road (ORR) on Design, Build, Finance, Operate and transfer( DBFOT) Annuity basis at Chennai from km0+000 (NH205) TO km 29+650(NH 205) in state of Tamil Nadu
Project Length : 29.650 km
Lane : 4
Project Cost : INR 1500 Crores
Funding : DBFOT
Client : TNRDC
Main Project Features: The Project included construction of Major Bridges: 2No’s, Minor Bridges: 6 No’s, Flyovers: NIL No’s, RoBs: 1 No’s, Underpasses/Overpasses: 22No’s, Culverts (Box/Pipe): 120 No’s and any other:NIL
Details of Major Bridges/Strucutres are:
Bridge /Structure Name
Length (m)
Span Arrangement
Foundation
Super structure
Construction type
Major bridge
260m
21.7*12
Pile foundation
Rcc gadder
New
Major bridge
176.4m
14.7*12
Pile foundation
Rcc gadder
New
Job scope and Responsibilities:
Monitoring day to day site activities with all quality testing and re-inspecting the Non-conforming product to close the NCR’s issued by the independent Engineer.
Recommend Corrective action in case of recurring non-conformance at site.
Responsible for preparing Monthly Quality Management Report & assist the CPM / on quality issues.
Interact with EPC and IE’s representative to ensure the approval of all materials.
Monitoring/Reviewing and ensuring the soil investigation details and recommendation as per technical Specifications.
Updating /attending seminars on latest techniques in High Embankment slope protection & RE Wall design with non cohesive soils and management trainings.
Aug 2009 To July 2011 Geosol Associates
Project Manager
2.Six Laning of NH-8 from surat to Dahisar section of NH-8from km. 263.000 To km 502.000(lenth Km.239.000) in the state of Gujarat &Maharashtra to be Executed as Bot (TOLL)on DBFOT pattern under NHDP (phase-v)
Project Length : 239 km
Lane : 4
Project Cost : INR 330 Crores
Funding : DBFOT
Client : NHAI
Main Project Features: The Project included construction of Major Bridges: 1 No’s, Minor Bridges: 6 No’s, Flyovers: 6 No’s, RoBs: nil Underpasses/Overpasses: 14No’s, Culverts (Box/Pipe): 30No’s and any other: nil
Details of Major Bridges/Strucutres are:
Bridge /Structure Name
Length (m)
Span Arrangement
Foundation
Super structure
Construction type
Major bridge
248m
20.7*12
Open foundation
Rcc gadder
New
Major bridge
197.6m
15.2*13
Open foundation
Rcc gadder
New
Job scope and Responsibilities:
Guide and instruct my staff in the essential aspects of Quality management.
Ensure material testing equipment at site laboratory and monitoring it’s calibrations as and when required.
Monitoring day to day site activities with all quality testing and re-inspecting the Non-conforming product to close the NCR’s issued by the independent Engineer.
Recommend Corrective action in case of recurring non-conformance at site.
Interact with EPC and IE’s representative to ensure the approval of all materials.
Monitoring/Reviewing and ensuring the soil investigation details and recommendation as per technical Specifications.
Reviewing / Preparing the Project Quality Plan, Quality control plan and Methodologies for all the scope of works (SOP) and recommendation for approval.
Feb 2007 To July 2009 PRASAD & COMPANY LIMITED
Senior Engineer
3.Construction and Supervision of NH-7, TN-5 Dindigul-Samayanallore (373.725-426.600) in the state of Tamil Nadu
Project Length : 52.875 Km
Lane : 4
Project Cost : INR 283 Crores
Funding : BOT
Client : NHAI
Main Project Features: The Project included construction of Major Bridges: NIL, Minor Bridges: 25No’s, Flyovers: 3 No’s, RoBs: 2 No’s, Underpasses/Overpasses: 8 No’s, Culverts (Box/Pipe): 50/73No’s and any other: nil
Details of Major Bridges/Strucutres are:
Bridge /Structure Name
Length (m)
Span Arrangement
Foundation
Super structure
Construction type
NIL
NIL
NIL
NIL
NIL
NIL
Job scope and Responsibilities:
RE walls errection reinforced soil wall structures with Block and panel facia geogrid as soil reinforcement specialization in rewalls msew mechanically stabilized earth wall using jkarfacia modular with geo grid total blocks withgeo grid 120000m2 pa
Testing of all materials like soil, aggregate, bitumen etc as per frequency.
Ensuring quality control at site and advising site engineers in technical problems
Witnessing third party testing for certain materials.
Source approvals for various materials that is been used in the project site from the client
Jan 2006 To Jan 2007 IJM (INDIA)
Site Engineer structures
4.Construction and Supervision of Jhansi Lakhnadoni NH-26
Project Length : 52km
Lane : 4
Project Cost : 230Crores
Funding : BOT.
Client : NHAI
Main Project Features: The Project included construction of Major Bridges: 1 No’s, Minor Bridges: 4No’s, Flyovers: 5 No’s, RoBs: nil, Underpasses/Overpasses: 8 No’s, Culverts (Box/Pipe): 24 No’s and any other: nil
Details of Major Bridges/Strucutres are:
Bridge /Structure Name
Length (m)
Span Arrangement
Foundation
Super structure
Construction type
Major Bridge
197.6m
13*15.2
Open foundation
RCC slab
New
Job scope and Responsibilities:
Responsible for planning and execution of Bridges, Underpass and cross drainage works.
Fixing of POT Bearings
Diaphragm, Deck Slab and Crash barriers
Strip seal Expansion joint
Preparation of Shop drawings and bar bending schedules.
Preparation of method statement and documents
Sep 1995 To Dec 2005 Lakshmi Sai Construction Company
SITE ENGINNERING
5.Construction and supervision of Jaipur to Daosa NH-29
Project Length : 30 km
Lane : 4
Project Cost : INR 170 Crores
Funding : BOT.
Client : NHAI
Main Project Features: The Project included construction of Major Bridges: 2No’s, Minor Bridges: 20 No’s, Flyovers: nil, RoBs: nil, Underpasses/Overpasses: 12 No’s, Culverts (Box/Pipe): 25/45No’s and any other: nil
Details of Major Bridges/Strucutres are:
Bridge /Structure Name
Length (m)
Span Arrangement
Foundation
Super structure
Construction type
Major bridge
236.4m
12*19.7
Rr foundation
Rcc slab
Retained
Major bridge
207m
10*20.7
Rr foundation
Rcc slab
Retained
Job scope and Responsibilities:
Responsibilities the constructional activities including Lay out, excavation, Placement of Reinforcement of R.C.C. Shuttering concreting Responsible for planning and execution of Bridges, Underpass and cross drainage works.
Fixing of POT Bearings
Diaphragm, Deck Slab and Crash barriers
Strip seal Expansion joint
Preparation of Shop drawings and bar bending schedules.
Preparation of method statement and documents
Nov 1993 To July 1995 Koneru Constructions
Junior Engineer
6.Irrigation Department Kanal Earth Dams at Vijayawadaa and Chalapalli
Project Cost : 10Crores
Funding : STATE GOVT.
Client : PWD
Job scope and Responsibilities:
Responsibilities the constructional activities including Lay out, excavation, Placement of Reinforcement of R.C.C. Shuttering concreting Supervision of the works involving earthwork, Layout marking, preparing Centerline marking.
Supervision of construction of internal roads, side drains and CDs
Preparing plans, bar bending schedules and materials requirement.
Preparing bill for labour payments and quantities for work progress.
Languages:
Language
Read
Write
Speak
English
Excellent
Excellent
Excellent
Hindi
Excellent
Excellent
Excellent
Signature: Place:
Name: D. Venkateswara Rao Date:
Mobile No: