Post Job Free

Resume

Sign in

Project manager

Location:
Indore, MP, India
Salary:
1600000
Posted:
February 21, 2018

Contact this candidate

Resume:

Name of Staff : D. Venkateswara Rao

Profession : Civil Engineer

Date of Birth : 7 th November 1969

Years with Firm : New Entrant

Nationality : Indian

Membership with

Professional Societies : Nil

Email : ac4jvt@r.postjobfree.com

Phone : 790-***-****, 903-***-****.

Address : D no- 2-448, kapula street, near High school

Ubalanka, Ravulapalem, East godavari,

Andhra Pradesh - 533237.

Detailed Tasks Assigned:

• To Check setting out of the project as per the norms and as per the MORT&H Specifications

• Inspect the Work and check compliance with the specifications

• Carry out Quality Assurance of Pavement and Bridge works

• To order, supervise or perform tests on materials and/or work

• To order the uncovering of completed work and/or the removal & Substitution of proper materials

and/or works

• To check/monitor the progress of the work and suggest corrective Measures

• To examine any work, which is about to be covered

• To examine and attend the measurement of the completed works

• To check the sub contractor's accounts, invoices and other statements

• To supervise the Sub contractor's work in all safety measures

• To maintain day-to-day project dairy this shall record all events. Pertaining to the administration of the

contract

Sr. No

Name of Employer

Post Held

Project Name

Period

Assignment in Project

Client of the Project

Remarks

From

To

SRRC Ind pvt Ltd

Project manager

Nov 2017 to till Date

CDM smith

Bridge engineer

August 2015 to Oct 2017

GCKC PROJECTS PVT LTD

Project Manager

Nov 2013 to July 2015

A

Road and drain improvement works in CMC Karwar, CMC Dandeli, TMC Bhatkal,TMC Kenya, TP Ankola, TP Honnavar, TP Siddapura,TP Yellapur, TP Mungod and TP Haliyal Limits UTTAR KANNA DA DISTRICT.

GMR Infra structure LTD

ASSOCIATE MANAGER (Structures)

Aug 2011 To Sept 2013

A

Development of outer ring road (ORR) on Design, Build, Finance, Operate and transfer( DBFOT) Annuity basis at Chennai from km0+000 (NH205) TO km 29+650(NH 205) in state of Tamil Nadu

Geosol Associates

Project Manager

Aug 2009 To July 2011

A

Six Laning of NH-8 from surat to Dahisar section of NH-8from km. 263.000 To km 502.000(lenth Km.239.000) in the state of Gujarat &Maharashtra to be Executed as Bot (TOLL)on DBFOpattern under NHDP (phase-v)

PRASAD & COMPANY LIMITED

Senior Engineer

Feb 2007 To July 2009

A

Construction and Supervision of NH-7, TN-5 Dindigul-Samayanallore (373.725-426.600) in the state of Tamil Nadu

IJM (INDIA)

Site Engineer structures

Jan 2006 To Jan 2007

A

Construction and Supervision of Jhansi Lakhnadoni NH-26

Lakshmi Sai Construction Company

SITE ENGINNERING

Sep 1995 To Dec 2005

A

Construction and supervision of Jaipur to Daosa NH-29

Koneru Constructions

Junior Engineer

Nov 1993 To July 1995

A

Irrigation Department KanalEarth Dams at Vijayawadaa and Chalapalli

Education:

B.E( CIVIL)

DIPLOMA(CIVIL)

Key Qualification:

Mr. Damodhara venkateswararao a graduate in Civil Engineering I having more than 24 years of professional experience in the field of Project Execution management, Construction Supervision structures and rewalls, Rate analysis, Quality Assurance/ Quality Control Management, Quantity checking, Project site management in construction of National highway projects and Bridges. Worked for construction. Further, having experiences in the construction of Retaining Wall, Stone pitching, Chute drain, Culverts, Reinforced Earth Wall, I am having experience with reinforced soil wall structures with Block and panel facia geogrid as soil reinforcement specialization in rewal mechanically stabilized earth wall using with geo grid totalblocks withgeo grid 120000m2 panels withgeo grid panels with paraweb60000m2 total 180000m2. My experience also includes structures such as, concrete box culverts, bridges I have good knowledge of relevant IS, IRC, BS and MORTH specifications. I have managed number of projects with FIDIC contracts norms. I have in-depth Knowledge of asphalt mix designs, material-testing methods for soil, Concrete, asphalt and familiar with modern construction technique

Nov 2107 to Till Date Project Manager

SRRC IND PVT LTD

Project name : Execution of Earthwork in formation, Construction of Minor Bridges, Blanketing, P. Way linking works including supply of P-way fittings, Track ballast, PSC Sleeper and Points & Crossings in connection with construction of Railway Infrastructure from 12/000 KM LP to 18/610 KM LP, KRL- Lara Section of NTPC Railway Siding, in Raigarh District, Chhattisgarh State (Package – II B).

Project Length : 6.1Km

Lane : Single line

Project Cost : 95 INR Crores

Funding : NTPC-LARA

Client : NTPC-LARA

August 2015 to Oct 2017 Bridge engineer

CDM SMITH

Project Name : upgrading arcot to villupuram road(SH-04)from km29+000 to km

110+165 and km 113+325 to km 114+600

Project Length : 83Km

Lane : 2

Project Cost : 320INR Crores

Funding : TNRDC

Client :TNRSP2

Main Project Features: The Project included construction of Major Bridges: 3 No’s, Minor Bridges: 17 No’s, Flyovers: nil, RoBs: nil, Underpasses/Overpasses: Nil, Culverts (Box/Pipe): 61/76 No’s and any other: drain 26km.

Details of Major Bridges/Strucutres are:

Bridge /Structure Name

Length (m)

Span Arrangement

Foundation

Super structure

Construction type

Major bridge

200m

12*15.2

Pile foundation

RCC

Retained

Major bridge

320m

14*21.7

Pile foundation

RCC

Retained

Job scope and Responsibilities:

Overall supervision of the physical progress of work using modern Project Management Techniques to ensure execution of the project within the time schedule avoiding time and cost overruns.

Preparation of method statements for various activities of works such as Earth work, Sub-Base, and other bituminous works etc. Checking the setting out and quality assurance of work, assure the quality of laboratory testing of materials and check the laboratory, plant and machinery required for timely completion of the work. Also monitored the operations and ensured that the mixed material brought to the site met with specifications requirements. Other responsibilities included verification and certification of sub-contractor’s interim payments and documentation of all measurements and testing reports, examine claims of sub-contractor.

Oct 2013 To July 2015.

GCKC PROJECTS PVT LTD

Project Manager

Nagarthon improvement of drain and road in Karwar district.

Project Length : 30Km

Lane : 2

Project Cost : 110INR Crores

Funding : GOVT

Client : DUDC Karwar.

Main Project Features: The Project included construction of Major Bridges: Nil, Minor Bridges: Nil, Flyovers: nil, RoBs: nil, Underpasses/Overpasses: 2 No’s, Culverts (Box/Pipe): 4 No’s and any other: nil.

Details of Major Bridges/Strucutres are:

Bridge /Structure Name

Length (m)

Span Arrangement

Foundation

Super structure

Construction type

NIL

NIL

NIL

NIL

NIL

NIL

Job scope and Responsibilities:

Overall supervision of the physical progress of work using modern Project Management Techniques to ensure execution of the project within the time schedule avoiding time and cost overruns.

Preparation of method statements for various activities of works such as Earth work, Sub-Base, and other bituminous works etc. Checking the setting out and quality assurance of work, assure the quality of laboratory testing of materials and check the laboratory, plant and machinery required for timely completion of the work. Also monitored the operations and ensured that the mixed material brought to the site met with specifications requirements. Other responsibilities included verification and certification of sub-contractor’s interim payments and documentation of all measurements and testing reports, examine claims of sub-contractor.

Aug 2011 To Sept 2012 GMR Infra structure LTD

ASSOCIATE MANAGER (Structures)

1.Development of outer ring road (ORR) on Design, Build, Finance, Operate and transfer( DBFOT) Annuity basis at Chennai from km0+000 (NH205) TO km 29+650(NH 205) in state of Tamil Nadu

Project Length : 29.650 km

Lane : 4

Project Cost : INR 1500 Crores

Funding : DBFOT

Client : TNRDC

Main Project Features: The Project included construction of Major Bridges: 2No’s, Minor Bridges: 6 No’s, Flyovers: NIL No’s, RoBs: 1 No’s, Underpasses/Overpasses: 22No’s, Culverts (Box/Pipe): 120 No’s and any other:NIL

Details of Major Bridges/Strucutres are:

Bridge /Structure Name

Length (m)

Span Arrangement

Foundation

Super structure

Construction type

Major bridge

260m

21.7*12

Pile foundation

Rcc gadder

New

Major bridge

176.4m

14.7*12

Pile foundation

Rcc gadder

New

Job scope and Responsibilities:

Monitoring day to day site activities with all quality testing and re-inspecting the Non-conforming product to close the NCR’s issued by the independent Engineer.

Recommend Corrective action in case of recurring non-conformance at site.

Responsible for preparing Monthly Quality Management Report & assist the CPM / on quality issues.

Interact with EPC and IE’s representative to ensure the approval of all materials.

Monitoring/Reviewing and ensuring the soil investigation details and recommendation as per technical Specifications.

Updating /attending seminars on latest techniques in High Embankment slope protection & RE Wall design with non cohesive soils and management trainings.

Aug 2009 To July 2011 Geosol Associates

Project Manager

2.Six Laning of NH-8 from surat to Dahisar section of NH-8from km. 263.000 To km 502.000(lenth Km.239.000) in the state of Gujarat &Maharashtra to be Executed as Bot (TOLL)on DBFOT pattern under NHDP (phase-v)

Project Length : 239 km

Lane : 4

Project Cost : INR 330 Crores

Funding : DBFOT

Client : NHAI

Main Project Features: The Project included construction of Major Bridges: 1 No’s, Minor Bridges: 6 No’s, Flyovers: 6 No’s, RoBs: nil Underpasses/Overpasses: 14No’s, Culverts (Box/Pipe): 30No’s and any other: nil

Details of Major Bridges/Strucutres are:

Bridge /Structure Name

Length (m)

Span Arrangement

Foundation

Super structure

Construction type

Major bridge

248m

20.7*12

Open foundation

Rcc gadder

New

Major bridge

197.6m

15.2*13

Open foundation

Rcc gadder

New

Job scope and Responsibilities:

Guide and instruct my staff in the essential aspects of Quality management.

Ensure material testing equipment at site laboratory and monitoring it’s calibrations as and when required.

Monitoring day to day site activities with all quality testing and re-inspecting the Non-conforming product to close the NCR’s issued by the independent Engineer.

Recommend Corrective action in case of recurring non-conformance at site.

Interact with EPC and IE’s representative to ensure the approval of all materials.

Monitoring/Reviewing and ensuring the soil investigation details and recommendation as per technical Specifications.

Reviewing / Preparing the Project Quality Plan, Quality control plan and Methodologies for all the scope of works (SOP) and recommendation for approval.

Feb 2007 To July 2009 PRASAD & COMPANY LIMITED

Senior Engineer

3.Construction and Supervision of NH-7, TN-5 Dindigul-Samayanallore (373.725-426.600) in the state of Tamil Nadu

Project Length : 52.875 Km

Lane : 4

Project Cost : INR 283 Crores

Funding : BOT

Client : NHAI

Main Project Features: The Project included construction of Major Bridges: NIL, Minor Bridges: 25No’s, Flyovers: 3 No’s, RoBs: 2 No’s, Underpasses/Overpasses: 8 No’s, Culverts (Box/Pipe): 50/73No’s and any other: nil

Details of Major Bridges/Strucutres are:

Bridge /Structure Name

Length (m)

Span Arrangement

Foundation

Super structure

Construction type

NIL

NIL

NIL

NIL

NIL

NIL

Job scope and Responsibilities:

RE walls errection reinforced soil wall structures with Block and panel facia geogrid as soil reinforcement specialization in rewalls msew mechanically stabilized earth wall using jkarfacia modular with geo grid total blocks withgeo grid 120000m2 pa

Testing of all materials like soil, aggregate, bitumen etc as per frequency.

Ensuring quality control at site and advising site engineers in technical problems

Witnessing third party testing for certain materials.

Source approvals for various materials that is been used in the project site from the client

Jan 2006 To Jan 2007 IJM (INDIA)

Site Engineer structures

4.Construction and Supervision of Jhansi Lakhnadoni NH-26

Project Length : 52km

Lane : 4

Project Cost : 230Crores

Funding : BOT.

Client : NHAI

Main Project Features: The Project included construction of Major Bridges: 1 No’s, Minor Bridges: 4No’s, Flyovers: 5 No’s, RoBs: nil, Underpasses/Overpasses: 8 No’s, Culverts (Box/Pipe): 24 No’s and any other: nil

Details of Major Bridges/Strucutres are:

Bridge /Structure Name

Length (m)

Span Arrangement

Foundation

Super structure

Construction type

Major Bridge

197.6m

13*15.2

Open foundation

RCC slab

New

Job scope and Responsibilities:

Responsible for planning and execution of Bridges, Underpass and cross drainage works.

Fixing of POT Bearings

Diaphragm, Deck Slab and Crash barriers

Strip seal Expansion joint

Preparation of Shop drawings and bar bending schedules.

Preparation of method statement and documents

Sep 1995 To Dec 2005 Lakshmi Sai Construction Company

SITE ENGINNERING

5.Construction and supervision of Jaipur to Daosa NH-29

Project Length : 30 km

Lane : 4

Project Cost : INR 170 Crores

Funding : BOT.

Client : NHAI

Main Project Features: The Project included construction of Major Bridges: 2No’s, Minor Bridges: 20 No’s, Flyovers: nil, RoBs: nil, Underpasses/Overpasses: 12 No’s, Culverts (Box/Pipe): 25/45No’s and any other: nil

Details of Major Bridges/Strucutres are:

Bridge /Structure Name

Length (m)

Span Arrangement

Foundation

Super structure

Construction type

Major bridge

236.4m

12*19.7

Rr foundation

Rcc slab

Retained

Major bridge

207m

10*20.7

Rr foundation

Rcc slab

Retained

Job scope and Responsibilities:

Responsibilities the constructional activities including Lay out, excavation, Placement of Reinforcement of R.C.C. Shuttering concreting Responsible for planning and execution of Bridges, Underpass and cross drainage works.

Fixing of POT Bearings

Diaphragm, Deck Slab and Crash barriers

Strip seal Expansion joint

Preparation of Shop drawings and bar bending schedules.

Preparation of method statement and documents

Nov 1993 To July 1995 Koneru Constructions

Junior Engineer

6.Irrigation Department Kanal Earth Dams at Vijayawadaa and Chalapalli

Project Cost : 10Crores

Funding : STATE GOVT.

Client : PWD

Job scope and Responsibilities:

Responsibilities the constructional activities including Lay out, excavation, Placement of Reinforcement of R.C.C. Shuttering concreting Supervision of the works involving earthwork, Layout marking, preparing Centerline marking.

Supervision of construction of internal roads, side drains and CDs

Preparing plans, bar bending schedules and materials requirement.

Preparing bill for labour payments and quantities for work progress.

Languages:

Language

Read

Write

Speak

English

Excellent

Excellent

Excellent

Hindi

Excellent

Excellent

Excellent

Signature: Place:

Name: D. Venkateswara Rao Date:

Mobile No:



Contact this candidate