Post Job Free

Resume

Sign in

Coal/ material handling system installation,commissioning, O&M

Location:
Waidhan, MP, 486886, India
Salary:
Negotiable
Posted:
February 21, 2018

Contact this candidate

Resume:

NIRMALKUMARGHOSH

Tel.:(Mobile)+919*********;

Email:ac4j3a@r.postjobfree.com;

SeekingAssignmentsinProjectManagement/Operations&Maintenance/Erection/testing&Commissioning/Process Enhancement/Qualitywithanreputedorganization.

Anastuteprofessionalwith39yearsofexperienceinProjectManagement,Operation,Maintenance,Erection,Testing& Commissioning,ProcessImprovementandQualityAssurance.

WorkedwithRelianceattheirRosapowerplant(UP)300x4MW,VIPL,Butibori,Nagpur,300x2MW asaGM(O&)&since 01/10/2013workingwithSasanpowerLtd6x660MwatMpasaAssistantVicePresidentC.H.P(O&M)coalconveying capacity4500MT/Hours.

Gainedexperiencein14.2KM overlandconveyorconveyingcapacity4500mt/hour&managingOperationand Maintenancetoaccomplishthesettargetsandintroducenewsystemsforenhancingefficiencyandrevenues.

AtReliance:ApartfromthatnotablecontributionatSasanpowerplantO&mactivitiesdonei.e2250tohsizer,1800tph RG,1800tphVGFrunlessdowntimeandmeetdaily50,000to60,000mtconsumptionofpowerplantandoneday significantcoaldispatchfromminetoplantthroughChp95,892MT.

Managingallactivitiespertainingtoprojectdevelopment&execution.

Deftinswiftlyrampingupprojectswithcompetentcross-functionalskillsandensuringon-timedeliverables.

Expertiseinimplementingpowerplantefficiencyimprovementmeasuresforachievingcostreductionsandprocess improvementsforaugmentingrevenuesandenhancingoperationalefficiency

WellversedwithqualitytoolssuchasSixSigmaetc&activecoordinatorofOHSAS–18001.

Provenexpertiseinconductingmaintenanceactivitiesfor6000MT/hrconveyingsystem with6000MT/hrsStacker Reclaimer,1600TPHconveyors,1.5milliontons/annumsinterplant,Blastfurnace,Coalwasheryetc.

Strongskillsinhandlingmaintenance&operationsensuringmaximum machineuptime.Stronganalytical,problem solving&organizationalabilities.Possessaflexible&detailorientedattitude. EmploymentScan

Sept`11–Continuing ReliancePowerLtd Asst.VP(O&M)

(SasanPowerLtd,Sasan,Singrauli,MP CoalHandlingPlant RosaPowerPlant,VidarbhaIndustriesPowerLtd)

Dec`97-Sept`11 McNallyBharatEngineeringCo.Ltd AssistGeneralManager

(Project:WBPDCLBkTPP,NTPC,RDM,ICML,VSPMundraPort)

June`91–Dec`97 ELECONENGINEERINGCO.Ltd Sr.TechnicalExecutive

(Project: GGSTP, Ropar, BCW, NTPC, Dadri )

Oct`84–June`91 TATAConstruction&ProjectServicesLtd AssistEngineer

(Project:GGSTP,Ropar,GHCL,Sutrapada,VSP,NTPC,Kahalgaon) Oct`Dec`82–Oct`84 M/sB.B.Enterprises SiteEngineer

(Project:NTPC,Ramagundam&GGSTP,Ropar)

April`78–Dec`82 M/sSamirDawn SiteEngineer

(Project:CESC,NewCossiporegen.Stn&Titagarh)

ProjectManagement

ManagingoveralloperationsforvariousProjectswithincost&timeparameters.

MonitoringprojectswithrespecttoBudgetedCost,demandforecasts,Timeover-runstoensuretimelyexecutionof projects.

Directingthedevelopmentandimplementationofkeyprocurementstrategies/contingencyplansandensuringthat strategies&plansarealignedwithprojectrequirements.

Ensuringsuitabledeploymentofmanpower&timelyavailabilityofmanpowerandequipments/materialstoensure timelyexecutionoftheprojects.

Maintenance

Finalizingpreventiveandpredictivemaintenanceschedulestoensureoptimumperformance.

Forecastingthespareconsumptionandarrangethespareontime,toreducethebreakdowntime.

Reducingthemaintenancecostbyselectingthecorrectvendorforsparearrangement. Quality

ImplementingqualitystandardssuchasOHSAS–18001,SixSigmaandmaintainingtherelevantdocuments.

Ensuringcomplianceofvariousqualitymeasures.

Erection,Testing,Commissioning&Maintenance.

Handlingperformancebottlenecksandtakingcorrectivemeasurestoavoidthesame.

Installingandcommissioningofequipments,providingutilityservicestotheequipments.

Ensuringeffectivesitemanagementanddisciplinetoensuresafeexecutionoftheprojects.

Erection,commissioningofequipments,providingutilityservicestotheequipments. ProcessImprovement/CostReductions

Spearheadingcontinuousimprovementinitiativesinprocesses.

Conceptualizing&implementingstrictmeasuresinoperatingprocedurestooptimizeresource/capacityutilization

Conductingauditsinproductlinestoimproveproductivityandaddsafetyfeatures. ManManagement

Leading,mentoring&monitoringtheperformanceoftheteamtoensureefficiencyinprocessoperations&meetingof individual&grouptargets.

Creating&sustainingadynamicenvironmentthatfostersdevelopmentopportunities&motivateshighperformance amongstteammembers.

NotableContributions:

AtBakreshwarThermalPowerPlantemployedbyMcNallyBharatEngineeringCo.Ltd

SuccessfullyfunctionedincapacityofManager–Testing,Commissioning&MaintenanceManagerforcoal handlingplant.

HandledtroubleshootingofvariousmaterialhandlingequipmentssuchasStackerReclaimer,PaddleFeeder, RingGranulator,RollerScreen,Pumps,TravellingTipper,ElectricHoist,BeltConveyors,ILMS,HydraulicPower packs,DustExtraction&DustSeparationSystems.

AtNTPCRamagundamemployedbyMcNallyBharatEngineeringCo.Ltd.

FunctionedasSr.Manager-Testing,Commissioning&MaintenanceManagerforcoalhandlingplant.

Managedallactivitiesrelatedwithplant&processmaintenance

PreventiveMaintenanceofStackerReclaimer,BeltConveyors,ILMS,DE&DSSystem,VentilationsSystemwith Utilities.

AtICML,SarasthaliCoalWasheryemployedbyMcNallyBharatEngineeringCo.Ltd.

SignificantlycontributedinexecutionofCoalCrusher,BatagJig,VibratingGrizzlyFeeder,Drum Filter, Thickenersetc.

AtVizagSteelPlantemployedbyMcNallyBharatEngineeringCo.Ltd.

Noteworthycontributioninexecutionof1.5milliontonsperannum SinterPlant&handledallmaintenance relatedactivitiesfortheplant&utilities.

EquipmentProcurement,Erection&CommissioningwithconditionmonitoringofSinterScreens,SinterCoolers CollaboratedtheprocesswithTPELtd.Russiaand&achieveddesignedtarget.

AtMundraPort&SEZLimitedemployedbyMcNallyBharatEngineeringCo.Ltd.

FunctionedasProjectInCharge–Erection,Testing,Commissioning,Operation&Maintenanceof6000TPH StackerReclaimerforHandlingCoal.

Maintenance&troubleshootingforhydraulicsystemsofStackerReclaimer(320bar)suppliedbyRexroth& Hagglunds.

CoreSAPuser,handlingallPM,MM modulesofSAP&HandonExperienceofInventory,Procurement,Billing, differentReportUploadingandotherUsageofR3Version.

AtP.S.E.B,GGSTP,RoparemployedbyM/SELECONENGINEERINGCO.LTD.

FunctionedasProjectInCharge–1200TPHCoalHandlingPlant.

AtNTPCDADRIemployedbyM/SELECONENGINEERINGCO.LTD.

FunctionedasProjectInCharge–1400TPHCoalHandlingPlant. MaintenancePurview

HandlingsuccessfullytheCoalhandlingsystem upto6000TPHinallrespect,MaintainingSparesandconsumables, BeltConveyorsincludingSteelCordBeltsetc.Ihavealsomanagedvendorresourcingandachieve99%system availabilitybymanagingsparesandconsumables.

Scholastics

1977 LicentiateinMechanicalEngineeringfromGovernmentPolytechnicSuri

(AffiliatedbyTechnicalEducationBoard,WestBengal)

2010 MBASpecializationwithProjectManagementfromKSBM,Pune,Maharashtra

(AffiliatedbyEducationBoard,Maharashtra)

PersonalVitae

DateofBirth: 1sthFebruary1957

PresentAddress: N.K.Ghosh,TiwariNiwas,3rdFloor,OppKundanAgency(HeroHondaShow Room),VindnagarRoad,Waidhan,Singrauli,MP-486886

PermanantAddress.:N.K.Ghosh,AdityaRoyale,5thfloor,Roadno-3,Vinayaknagar,VUDAcolony, Gajuwaka,Visakhapatnam,AP-530044

PresentCTC: Rs.36.58lacks-PERANUM.

SalaryExpected: Negotiable

Place :SUMPP,SASAN,MP YoursSincerely

Date : 05.02.2018 NirmalKumarGhosh



Contact this candidate