CURRICULUM VITAE
OF
NTONNGWE LUCAS PHIRI
NTONNGWE LUCAS PHIRI
*** **** ********** ******, ********* Extension 2-073-***-**** / 072-***-****
Randburg, 2001 ac4hup@r.postjobfree.com
Personal Information
Identity number 731***-****-***
Nationality South African
Pass port Yes
Criminal offence No
Personal Summary
Hard working qualified electrician with extensive knowledge of electrical sans standards codes of practice.
Possessing an in depth knowledge of safety procedures for both construction and maintenance projects.
Experienced in installing, maintaining, testing and commissioning electrical systems and equipment’s in domestic, commercial and industrial environments.
Able to use electrical test equipment’s, hand tools to diagnose, locate and fix electrical problems.
Able to interpret personal instructions, read schematic drawings, line drawings, wiring drawings and floor plans.
Now looking for further a successful career by working for an ambitious and expanding company.
Qualification
2018: Presently Studying towards Electrical Wire man’s license - Capricon FET College - Polokwane.
2017: Operating Regulations for High Voltage System Certificate - HV Test (pty) ltd - Johannesburg.
2017: 6,6kv / 33kv Cable Joint and Termination Certificate - HV Test (pty) ltd - Johannesburg.
2014: Section 26D electrical Trade Test Certificate – Indlela Skill Institute Assessments - Olifantsfontein.
2013: Plc Introduction Course - AGE Technologies - Johannesburg.
2013 : Siemens Maintenance Course – AGE Technologies - Johannesburg
1996 – 1997: Electronic Mechanician Certificate - Pelindaba Skill Institute - Pretoria.
1993- 1995: N5 Electrical Engineering Certificate - Alexandra Technical College - Johannesburg.
1992: National Senior Certificate - Alfred Bennet Makapan Secondary School - Mokopane.
Work experience
Previous employer EnI Electrical and Instrumentation Engineering contractor (pty) ltd
Site of work Petra diamond mine mill project - Pretoria
Period 07 November 2016 until 04 July 2017
Position Electrician
Carried out electrical installation and maintenance work.
Jointed, terminated, tested and commissioned 11kv medium voltage cables.
Assembled, installed, terminated, tested and commissioned variable speed drive panels, motor control center panels, lights panels, socket panels, motors, battery and uninterrupted power supply panels, pull switches.
Tested and replaced any faulty electrical components such as contactors, circuit breakers, relays when required.
Reason of leaving End of contract
References
Mr Roux Brunx 082-***-**** / Mr Vincent Chauke 072-***-**** / Mr Dumisani Mabaso 078-***-****
Previous employer Msomi solution equipment (pty) ltd
Site of work Avon peaking power station - Durban
Period 14 December 2015 until 18 July 2016
Position Electrician
Assembled, installed, terminated, tested and commissioned motor control center panels, variable speed drives panels, lights panels, instrument panels, control valves, distribution board panels, switch gear panels, plugs.
Tested and replaced any faulty electrical components such as contactors, ammeters, voltmeters, circuit breakers.
Reason of leaving End of contract
References
Mr Thulani Nkosi 071-***-**** / Mr Rigo Ntsagu 072-***-**** /Mr Terrence Nethsianda 082-***-****
Previous employer Group five projects
Site of work Dedisa peaking power station - Port Elizabeth
Period 02 November 2014 until 30 September 2015
Position Electrician
Carried out electrical installation and maintenance work on the project.
Assembled, installed, terminated, tested and commissioned motor control center panels, variable speed drives panels, lights panels, motors, distribution board’s panels, switch gear panels, isolator panels and plugs.
Tested and replaced any faulty electrical components such as contactors, circuit breakers, relays when required.
Reason of leaving End of project
References
Mr Thulani Nkosi 071-***-**** / Mr Rigo Ntsagu 072-***-**** / Mr Terrence Nethsianda 082-***-****
Previous employer Wade Walker electrical and Instruments contractor (pty) ltd
Site of work Exxaro grootgeluk coal mine medupi expansion project - Lephalale
Period 10 October 2011 until 31 October 2014
Position Electrician
Authorized person for electrical lockout, switching and isolation on site.
Carried out electrical installation and maintenance work on the project.
Assembled, installed, terminated, tested, commissioned motor control center panels, variable speed drives panels, motors, lights panels, control valves, distribution board’s panels, isolator panels, plugs.
Tested and replaced faulty electrical components such as cables, relays, contactors, circuit breakers.
Reason of leaving End of contract
References
Mr Bryon Mackie 082-***-**** / Mr Ernest Kapp 081-***-**** / Mr Luvuyo Sixinti 073-***-****
Previous employer Edison power gauteng (pty) ltd
Site of work Maponya mall - Monte casino - Orlando and Fnb stadium - Freedom square hotel
Period 19 July 2006 until 10 January 2010
Position Elconop3 electrician
Grinded and chased walls to install conduit pipes, trunkings, cable racks, mesh wires and pulled cables,
Installed lights, installed plugs, installed distribution board panels and replaced faulty electrical components.
Terminated and tested distribution board’s panels, lights, plugs, power cables and other electrical components.
Reason of leaving Resign
References
Mr Raven Nair 082-***-**** /011-***-**** / Mr Japhta Malepe 072-***-**** / Mr Kavillan Moodly 011-***-****
Previous employer Atomic Energy Cooperation of South Africa - Pretoria
Department Nuclear and Electronics Products
Period 08 October 1997 until 25 November 1999
Position Nuclear Electronic Mechanician
Soldered and populated printed electronics circuit boards.
Tested electronics circuit’s boards and other electronics components.
Installed, terminated, tested and commissioned coal ash analyzers panels at various coal mines.
Reason of leaving Lay off
References
Mr Johannes Phiri 083-***-****