Post Job Free

Resume

Sign in

Project Manager Construction

Location:
O'Fallon, MO
Posted:
February 06, 2018

Contact this candidate

Resume:

Kris Broadway

*** ******** ***** ******** *’Fallon, MO 63368 636-***-**** ac4dfx@r.postjobfree.com

CAPITAL PROJECT EXECUTIVE

construction project management design

Professional Summary

Accomplished Construction Executive with over 15 years’ experience driving process improvements and implementing lean principles into construction operations for multi-location, multimillion dollar projects. Extensive experience managing project services functions, including planning, scheduling and procurement. Successfully develops budgets and directs all logistic functions for new builds, renovations and relocations. Heavily involved in both customer-facing and back office operations. Effectively leads and coaches cross functional staff, ensuring professional development and advancement opportunities.

Education, Certifications & Training

Bachelor of Science Construction Management Embry-Riddle Aeronautical University

Associate of Applied Science Architectural Technology Lewis and Clark Community College

Master Certificate Lean Six Sigma Villanova University Online

Project Management Professional PMP Enrolled

Lean Six Sigma Black Belt Certified LSSBBC

OSHA 150 & 10 Hour Certified Safety Construction Industry

Leadership Training Dale Carnegie

Skills

Lean Six Sigma

Operations

Document Preparation

Scheduling

Budget Management

Project Design

Property Research

Renovations

Relocations

Procurement

Professional Experience

January 2015 – Present

Midwest Petroleum Company – St. Louis, MO

Director of Construction & Process Improvement

Executed construction operations for multi-location projects, managing budgets of up to $3.5 million.

Effectively implemented six sigma lean process improvements for the Accounts Payable, External Auditing, Marketing and Retail Ordering functions, effecting both corporate and retail operations.

Directed the construction relocation efforts for a new 32,000 sq. ft. corporate office, as well as 15 convenient store renovations.

Utilized AutoCAD 2015 to design over 100 construction documents, which emphasized project scope, schedules and budgeting for all retail convenience stores.

Manages a team warehouse, executive and maintenance staff, as well as all warehouse operations and a fleet of 12 vehicles.

Achievements:

Saved $30,000 in distribution and warehouse stock costs, 2016.

Developed a construction standards handbook to reduce time during the bidding process.

October 2007 – September 2014

Covidien / Triad Isotopes – St. Louis, MO

Nuclear Pharmacy Project Manager

Served as Construction Manager for five new nuclear pharmacy location projects – valued at over $1.3 million – overseeing 24 renovations, and 7 relocations.

Facility project manager for more than 500 capital projects, spanning 62 nuclear pharmacies, valued at up to $75,000.

Designed over 500 floor plans, which included scope, schedules and budgeting, for all pharmacy locations, adhering to USP 797 and ISO 7 Clean Room compliance specifications.

Functioned as Procurement Manager, purchasing over 2000 supplies and equipment items and overseeing all purchasing functions.

Utilized Lean Six Sigma and Lean Manufacturing to implement process improvements for 21 pharmacy locations, and to facilitate construction renovations and equipment relocation.

Achievements:

Saved over $200,000 in procurement costs, 2015.

Realized a cost savings 10% in construction costs for each location.

Improved a 30% efficiency on the production of radiopharmaceuticals.

November 2006 – September 2007

Various Companies

Architectural Engineering Consultant

Clients: Save-A-Lot – Earth City, MO

Epoch Design – St. Louis, MO

GlaxoSmithKline – St. Louis, MO

Revised over 200 existing architectural floor plans for capital construction projects.

Performed field measurements to create as-build drawings after construction.

Designed 30+ CAD construction drawings for Build a Bear Workshop and Things Remembered with the assistance of the architects.

Production of architectural and interior construction documents using AutoCAD 2006.

July 2002 – October 2006

Universe Corporation – Earth City, MO

Architectural Engineer

Designed 200 exterior architectural cladding panels projects for schools, sports arenas, and commercial buildings in the United States and the Bahamas.

Ensured accurate measurements and oversaw shipping logistics for 80 Kalwall translucent building panel projects.

Performed over 40 building field measurements to create manufacturing drawings.

References Available Upon Request



Contact this candidate