www.linkedin.com/in/cjprovenzano 412-***-**** Greater Pittsburgh Area ac49ek@r.postjobfree.com

Engineering management team member, who leads by example, and has an excellent record of delivering concurrent projects; adapting to new and innovative technologies while consistently meeting commitments in team-oriented environments. Hands-on leader who successfully recruits and develops team members who work collaboratively and effectively utilizes multiple resources to deliver projects that exceed expectations/requirements.

Project Engineering Department and Project Management

Real-time System Design & Configuration Recruitment, Mentoring & Coaching of Employees

DCS/PLC/SCADA/GUI System Design & Programming Development of Product Strategies & Roadmaps

AC and DC Drive Configuration & Programming Drove Six Sigma & Lean Process Improvements

Automation/Process System Commissioning Built & Managed Customer Relationships

Equipment/Software Specification Development Manpower & Product/Project Task Scheduling

Instrumentation Specification Development & Selection Budget Development, Tracking & Reporting

EMPLOYMENT HISTORY

WESTINGHOUSE ELECTRIC COMPANY, Cranberry Twp., PA

AP1000 China Distributed Control & Information Systems (DCIS) Product Manager 2013 - 2018

Led the development of the AP1000 product growth strategy and managed the daily activities of the development/execution team (17 direct reports) for Westinghouse’s AP1000 New Plant market in China:

Developed and was responsible for maintaining the AP1000 DCIS product strategies for the China market

Established the process for the successful knowledge transfer of DCIS methodologies and software from the U.S. designers to WEC China staff to allow for localization of the product in the target market

Resolved product schedule delays and corresponding $5M overspend in first fourteen months on the job by using CI tools, such as process mapping, to eliminate said delays and improve the delivery schedule by two months, eliminate the overspend and generate a positive cost variance of $1.3M

Led the development of AP1000 DCIS project bids and project plans for both the U.S. and China offices’ work scope

Mentored and coached the work force who was responsible for the development and delivery of the DCIS product

Created, managed and reported on product/project development schedules as well as department/product/project budgets

Assisted in the resolution of design and implementation issues with peer organizations and customers

Mentored Green Belts and Process Owner of corrective action initiatives in my product area

Turbine & Balance of Plant (BOP) Control Systems Product Manager 2009 - 2013

Led the development and implementation of the AP1000 PWR Turbine Control Systems for the U.S. and China projects, as well as the staff (25 direct reports) who implemented the control system software for various New Plant and Upgrade nuclear plant projects:

Led the implementation of the First of a Kind (FOAK) AP1000 PWR Turbine Control System product for Toshiba-provided BWR turbines for the Vogtle and VC Summer projects

Managed the implementation of the AP1000 Turbine Control System for the Mitsubishi-provided turbines for the China AP1000 projects

Recruited, mentored and coached a diverse work force from various process industries into high performance teams to deliver control systems for the Westinghouse New Plant and Upgrade projects

Developed and maintained the vision and product roadmaps for a core set of Turbine products

Identified and Process Owner of Green Belt Projects/Kaizens in product area as part of ongoing corrective action initiatives

Mentored Green Belts who lead initiatives in my product area

Created, managed and reported on product/project development schedules as well as department/product/project budgets

Assisted in the resolution of design and implementation issues with peer organizations and customers

Customer First Leader (CFL) 2007 - 2009

Trained and became certified as a Lean Enterprise/Six Sigma Black Belt and led continuous improvement projects and Kaizens across the various Westinghouse product lines:

Assisted with Green Belt candidate training as well as mentoring of said Green Belt candidates as they did their first projects and Kaizens

Sampling of my CFL Black Belt Projects and Kaizens completed:

Reduced the retention of redundant files and their storage – Capital savings of $3M with a cost avoidance of another $1M. Additional benefit of the project was the reclamation of space meant for storage for productive use

Reduced the Handling, Inventory and Waiting wastes at a fuel facility, which resulted in a $10K/month savings in labor costs

Increased the productivity of cross functional engineering teams by removing unnecessary steps in existing processes, while increasing the rigor and synergy at hold/transfer points in said processes for field operations

AP1000 Safety System Functional Engineer 2005 - 2006

Developed initial AP1000 safety system functional logic diagrams and functional specifications for critical safety actuations. Trained and mentored new hire college graduates on automation system principals, methodologies and other industry standards.

VEC TECHNOLOGY, LLC, Greenville, PA 2004 - 2005

Automation Systems Manager

Provided technical direction and led the daily activities of the Controls Team (three members) for an OEM of Closed Molding Composites Equipment (VEC Cell) at its Regional Manufacturing/Research Center:

Led technical development and implementation of a configurable automation package for the VEC Cell, which resulted in a 55% reduction ($200K vs. $450K) in capital equipment and implementation costs, while increasing machine availability and part changeover flexibility

Developed modular control code and graphics which reduced the design, configuration and commissioning time for a VEC Cell by roughly 50%, which allowed my staff to bring more equipment to market sooner at a reduced cost

Led completion of Failure Mode & Effects Analysis (FMEA) and remediation of any failures found for final customer configurations of a VEC Cell

Developed or assisted in the development of technical specifications to better explain the operational capabilities and maintenance of the configurable assemblies of a VEC Cell

PARTNER’S ALLIANCE, Cranberry, PA 2003 - 2004

Project Management Consultant

Responsible for the business development, conceptual design and management of capital equipment projects for AK Steel’s Butler PA Hot Mill:

Assisted Hot Mill Operations by identifying key equipment/process deficiencies, then developed both the best technical solutions to rectify these deficiencies and the necessary business justifications to secure the capital to resolve them

Responsible for all facets of projects with fiscal and progress reporting to rank and file up to plant management

Assembled and directed multi-discipline teams ranging from Installation to R&D personnel

Project budgets ranged from $25K (Slab Underside Temperature Monitoring) to $535K (Crop Shear Optimization) with lifecycles from two to eight months

All projects were completed under budget, within the allotted time and exceeded the initial business justifications. The Crop Shear Optimization project met its targeted ROI in just over four months instead of the projected eleven and was completed for $100K under budget while adding system functionality that was not envisioned when the project was proposed

ALSTOM POWER CONVERSION, Pittsburgh, PA 2000 - 2002

Senior Project Engineer

Managed the technical and commercial content of Drives/Automation projects, ($6 to $30 Million), in the Steel and Fossil Power Generation Industries:

Increased Gross Margin on a Cold Mill automation project from 18% to 35% by implementing a flexible

engineering model and improving the technical information transfer between the office and site engineers

Increased gross margin by 3% on a Force Draft Fan Project by implementing a real time manpower-tracking tool, to effectively manage engineering resources and other project tasks

Interfaced extensively with clients and technical partners to ensure critical issues and concerns were quickly resolved. This enabled Alstom to consistently exceed the client’s expectations and thereby provided opportunities for repeat business as well as additional work within the existing contracts

Principal liaison between Sales and Engineering Departments during a project’s proposal stage, which led to the setting of attainable project deliverables and manpower budgets

AMERICAN VIDEO GLASS COMPANY (AVG), Mt. Pleasant, PA 1997 - 2000

Controls Resource Leader

Recruited, mentored and led the activities of the Controls Team (six members) at a television glass manufacturing facility. This team was responsible for maintaining the facility’s DCS/PLCs and SCADAs machines as well as leading new capital equipment and process improvement projects.

ECLECTIC SYSTEM ARCHITECTURES, Cranberry, PA 1989 - 1997

Engineering & Project Management Consultant

Provided engineering and project management services for all phases of automation projects. These projects were in the Metals, Food Preparation/Processing and Flexible Manufacturing Industries.

ITALIMPIANTI OF AMERICA, INC., Coraopolis, PA 1988 - 1989

Project Engineer

Responsible for the integration of PLC based DC Drive Control Systems for Copper Tubing Reduction Machines, known as Draw Blocks, at various domestic sites.

MILL EQUIPMENT AND ENGINEERING CORPORATION, Pittsburgh, PA 1987 - 1988

Field Engineer

Worked as part of a large multi-disciplined team to commission a Single Stand Temper Mill for Dietrich Industries in Hicksville, Ohio.

EDUCATION

Duquesne University, Pittsburgh, PA Master of Business Administration (MBA) 1991 - 1993

Dean’s List; Beta Gamma Sigma National Honor Business Society 3.88/4.00

University of Dayton, Dayton, OH Bachelors of Science 1983 - 1987

Major: Electronic Engineering Technology Minor: Industrial Engineering Technology

Dean’s List 3.00/4.00

Attended more than 800 hours of Leadership, Project and Technical related training courses.



Contact this candidate