Post Job Free

Resume

Sign in

Senior Project Management Office MAnager

Location:
Cairo, Cairo Governorate, Egypt
Salary:
30000
Posted:
April 26, 2018

Contact this candidate

Resume:

Page * of *

Mahmoud Safwat A. El-Rady Taher

Address: ** ****** ******* **. ***

ElGolf, Nasr City – Cairo – EGYPT.

Phone: +202-********

Mobile: +201*********

E-maill: ac485o@r.postjobfree.com

Summary:

I have a local and global experience in a wide range of areas in driving company’s operations and project management, and has been involved in managing of a diversity of prestigious projects in Egypt, Middle East (Based in KSA) and Africa

(Based in Tanzania). I have an experience in leading admin department, ERP system, managing, monitoring, negotiating, risk assessment, financial control, client relations, business development, controlling of projects budget, time, & quality. Also, the experience in preparing manuals, procedure, forms, and KPI’s for controlling the project & organization quality management system.

Objective:

A full-time job in the field of Senior Management, where I can draw upon my experience, skills & academic background.

Education:

6 SIGMA Green Belt preparation course – IASSC.

M.Sc. Master Degree in Civil Department Ain Shams University (January 2013) Master degree title “Using Poly- Aluminium Chloride in Water Treatment”.

PRMG (Project Management Diploma), full credit (6 courses) at AUC (American University of Cairo) 2010.

B.Sc. Civil engineering Public Works Department Ain Shams University (2001-2006) (Very Good accumulative, ranked 9th of 288th) Graduation Project (Sanitary ranked 1st of all). Present occupation:

ENOIA Group – Cairo – EGYPT from June 2017 – Present. Deputy Operations Manager.

• Executing ENOIA new ERP system (Dolphin ERP), monitoring, & implementing in EGYPT unit.

• Introducing new Quality Management System for ENOIA EGYPT unit.

• Preparing issuing Project Management Manual, Project Management Procedure, Project Quality Plan, & Projects Control Procedure.

• Implementing new Employee Performance Evaluator system & introducing new KPI for each department.

• Projects Control Section Head.

• Follow up ENOIA Group initiative plans (IT Project).

• Initiating ENOIA Egypt projects database & projects control methodology. Projects Manager for the following projects:

• Consultancy Services for enhancing Roz Al Yousef District Sewage System – Kafr Tohormos – Giza – EGYPT

– from 10/2017 till now.

• Consultancy Services for Abou Kbeer Sewage Network – ElSharkia – EGYPT – from 10/2017 till now.

• Feasibility studies for Mega Irrigation schemes around Agoro Hills and Design of Nyimur, Purongo and Palyes, irrigation schemes in Lamwo, Amuru and Nwoya Districts (LOT 3) – UGANDA – from 11/2017 till now. Page 2 of 7

• Sewage System for 18 unserved rural areas in north Suez – Suez – EGYPT – from 12/2017 till now.

SABBOUR Consulting Bureau – Cairo – EGYPT from January 2017 – May 2017. Project Manager 01/01/2017 – Present.

• Cinema Land Apartments, Administrative and Commercial building – Maamora District – Alexandria – EGYPT from 08/01/2017 till 18/05/2017.

• Taverna Land Apartment, Administrative and Commercial building – Maamora District – Alexandria – EGYPT from 08/01/2017 till 18/05/2017.

• ElRiyad SECON Compound (Residential, Commercial, Administrative, leisure, & educational uses compound) – Fifth settlement – Cairo – EGYPT from 08/01/2017 till 18/05/2017.

• Siemens Blade Fabrication Factory – Suez Industrial Development Compound - Suez Economic Industrial Zone – Suez – EGYPT from 08/01/2017 till 18/05/2017.

• Egypt Nile Tower – commercial, residential, & Hotel – Cairo – EGYPT from 08/01/2017 till 18/05/2017.

AAW Development – Giza – EGYPT from January 2016 – November 2016 Project Manager & Development 01/01/2016 – 10/11/2016. Managing All New projects in addition for seeking a new opportunity studding & performing a feasibility study, market survey, & market analysis for new projects.

Prepared & Issue Projects Management Procedure & Projects Development Procedure.

• Nahda Building – Class A residential building fully furnished, at Maadi Sarayat, Maadi, Cairo, EGYPT.

• Nasr City Building – Class B residential building semi furnished, at Nasr City, Cairo, EGYPT.

• New opportunities Feasibility study projects (Omar Adel Omar Land, 4000 m2 Land in Zamalek, 25,000 m2 Land in front of ElRehab City, 750 m2 Land in Heliopolis, 5000 m2 ElDaher Army Land, 6th of October various land lots, 12,500 m2 Hassan Allam Land, Cairo – Alex desert road, & Libya Investors New Cairo Land).

AAW (Ahmed Abdel Warith) Consulting Engineers – Giza – EGYPT December 2014 – December 2015 Project Manager – Project Management Office 07/12/2014 – 31/12/2015.

• SAUDI ARABIA NATIONAL GUARDS – RIYADH – KSA the housing project for SANG (Saudi Arabia National Guards), consists of 5 districts and King Khaled Academy cluster, scope includes all external works – from 16/02/2015 till 31/12/2015.

• JALMUDAH & MUTRAFIAH PARKS – JUBAIL – KSA the project is a part of Al Jubail Royal Commission

(RC) strategic plan, it consists of 2 parks (11 hectare), 1 park (22 hectare), Signage & way finding for the parks and shore line, & 2 new restrooms at sea club area – from 07/12/2014 till 31/12/2015.

ECG (ENGINEERING CONSULTANT GROUP) - Cairo - EGYPT July 2006 – December 2014 Infrastructure Division / Projects Management Division 24/7/2006 – 02/12/2014.

• DEPUTY PROJECT MANAGER (DPM).

o BUILDINGS, LANDSCAPE AND MASTERPLANING CONSULTANCY SERVICES FOR SCHEMATIC DESING, DETAILED DESIGN, AND TENDER PACKAGE FOR ALWAHA PART OF KING ABDALLAH ECONOMIC CITY (KAEC) – KSA the project is part of King Abdullah Economic City (KAEC), AlWaha – Village 1 – Phase 2 is approximately 32 Ha comprising 925 units covering both single and multifamily types – from 10/03/2014 till 02/12/2014. o INFRASTRUCTURE CONSULTANCY SERVICES FOR SCHEMATIC DESING, DETAILED DESIGN, AND TENDER PACKAGE FOR ALWAHA PART OF KING ABDALLAH ECONOMIC CITY (KAEC) – KSA the project is part of King Abdullah Economic City (KAEC), AlWaha – Village 1 – Phase 2 is approximately 32 Ha comprising 925 units covering both single and multifamily types – from 10/03/2014 till 02/12/2014.

Page 3 of 7

• PROJECT ENGINEER (PE).

o CONSULTANCY SERVICES FOR PREPARATION OF THE FEASIBILITY STUDY UPDATE OF DETAILED DESIGN FOR UPGRADING OF NYAHUA – CHAYA (85.4 KM) ROAD – TANZANIA

– from 14/09/2014 till 02/12/2014.

o CONSULTANCY SERVICE TO ISSUE FOR CONSTRUCTION PACKAGE FOR INFRASTRUCTURE AND HOTEL MEP FOR PORTO SHARM – SHARM ELSHEIKH – EGYPT – from 12/01/2014 till 02/12/2014.

o CONSULTANCY SERVICE FOR PRIMARY INFRASTRUCTURE WORKS FOR ALMUROOJ – KING ABDALLAH ECONOMIC CITY – EMMAR – KSA – from 12/12/2013 till 10/08/2014. o CONSULTANCY SERVICE FOR INFRASTRUCTURE AND LANDSCAPE WORKS FOR BEACH COMMUNITY 2 – KING ABDALLAH ECONOMIC CITY – EMAAR – KSA – from 05.09.2013 till 10/08/2014.

o CONSULTANCY SERVICE FOR INFRASTRUCTURE WORKS FOR GOLF COMMUNITY 1B – KING ABDALLAH ECONOMIC CITY – EMAAR – KSA – from 05.09.2013 till 10/08/2014. o CONSULTANCY SERVICE FOR SCHEMATIC DESIGN AND BILL OF QUANTITY FOR SOUTH HELWAN STEAM POWER PLANT 3X650 MW (ANCILLARY BUILDINGS) – EGYPT – from 29.08.2013 till 27.10.2013.

o CONSULTANT SERVICES FOR DETAILED DESIGN AND SITE SUPERVISION OF SYRDARIA WATER SUPPLY PROJECT (100 MILLION USD PROJECT BUDGET) – SYRDARIA – UZBEKISTAN – from 26.05.2013 till 02/12/2014.

o INFRASTRUCTURE CONSULTANCY SERVICES FOR SCHEMATIC DESING, DETAILED DESIGN, AND TENDER PACKAGE FOR ALWAHA PART OF KING ABDALLAH ECONOMIC CITY (KAEC) – KSA the project is part of King Abdullah Economic City (KAEC), AlWaha – Village 1 – Phase 1 is approximately 18 Ha comprising 775 units covering both single and multifamily types – from 17/03/2013 till 31.10.2013.

o DESIGN REVIEW OF INFRASTRUCTURE AND HOTEL MEP FOR PORTO SHARM – SHARM ELSHEIKH – EGYPT – from 19/02/2013 till 06.01.2014. o CONSULTANCY SERVICES OF DETAILED DESIGN FOR SIWA 4 MW ELECTRICAL POWER PLANT – SIWA – EGYPT –from 14/02/2013 till 24/07/2013. o CONSULTANCY SERVICES FOR REVIEW OF DETAILED DESIGN AND TENDER DOCUMENTS AND CONSTRUCTION SUPERVISION OF SAME-MWANGA-KOROGWE WATER SUPPLY PROJECT – TANZANIA – from 19/09/2012 till 02/12/2014. o HACIENDA WHITE INFRASTRUCTURE WORKS – ALEXANDRIA MATROUH ROAD – EGYPT infrastructure works such as the access road, HV power station, transmission or lines, water supply facilities, sewerage works, storm water drainage facilities and other utilities that may serve the infrastructure requirements of the Project from 14/08/2012 till 15/02/2014. o CLEAN FUELS PROJECT AT MAA AND MAB REFINERIES – KUWAIT The Clean Fuels Project is a major upgrade / expansion of the Mina Al-Ahmadi (MAA) and Mina Abdullah (MAB) refineries to increase capacities from 22/07/2012 till 04/10/2012. o FAWAZ ELHOKAIR LAND IN SALBOUKH – KSA infrastructure for a land area of 3,000,000 m2

(8,000 feddan) from 01/01/2012 till 02/12/2014.

o ROYAL CITY COMPOUND – 6TH OF OCTOBER – EGYPT from 01/01/2012 till 29.03.2012. o EPIC OF PRE-CAST CONCRETE WALL, SHELTERS & OTHER FACILITIES AT VARIOUS STATIONS IN DUKHAN FIELDS QP (Qatar Petroleum) – QATAR from 13/11/2011 till 15/03/2013. o PALM HILLS GOLF CLUB & RESORT 6th OCTOBER CITY – EGYPT from 18/09/2011 till 07.05.2014.

Page 4 of 7

o KING ABDULAZIZ INTERNATIONAL AIRPORT – Geddah - KSA from 18/09/2011 till 22/11/2011. o REFURBISHING AND UPGRADING WORKS FOR VARIOUS PUMPING STATIONS (PHASE – 8) – Doha - QATAR from 24/08/2011 till 05/08/2012. o ISSIP 2 (SECOND INTERGRATED SANITATION & SEWERAGE INFRASTRUCTURE PROJECT) - STUDIES AND DETAILED DESIGNS FOR SHARQYA GOVERNORATE from 30/10/2010 till 23/06/2011.

- Provide much needed infrastructure sanitation improvement, improve water quality, raise awareness, and strengthen capacity to design, implementation & operation.

- Construction cost for Phase I 60 million USD Phase II 240 million USD. o STUDIES FOR TREATED WASTEWATER DRAINAGE IN ALEXANDRIA from 05/10/2010 till 02/12/2014.

- Perform a study for all drainages in Alexandria to level up & future capacity.

- Design development for architectural, structural, mechanical and electrical detailed design, specifications and tender documents.

o ONSHORE FACILITIES FOR RAS Al HILAL FISHING PORT PROJECT - LIBYA from 1/05/2009 till 06/2010.

- Construction of Ras Hilal Fishing Port in Libya. The project comprises a building complex, landscaping

(approx area 36,500 m2), infrastructure for the building complex (approx area 36,500 m2), and infrastructure for the port area (up to quays, jetties, piers).

- Design development for architectural, structural, mechanical and electrical detailed design, specifications and tender documents, and Bases of Design Report (BODR). o DESIGN REVIEW for SHOBRA ELKHEIMA RAW WATER PUMP STATION – Cairo - EGYPT from 20/05/2009 till 14/07/2012.

- The design & execution of extending domestic water station in Shubra ElKheima with a production rate of 200,000 m3/day, moreover the construction of a new intake with a production rate of 660,000 m3/day.

- Design review of civil and architectural drawings.

- Construction cost 500,000,000 L.E.

o HYDRAULIC ANALYSIS STUDY OF WATER SUPPLY NETWORKS FOR NEW BANI SUEF - EGYPT from 16/04/2009 till 23/08/2009.

- Hydraulic analysis for existing water networks in New Bani Suef City. Studying the networks in current situation and proposing new projects in the water supply system to satisfy population water demand till year 2050.

- Design cost of about 275,000 L.E.

o MARINE AND INFRASTRUCTURE WORKS FOR ADEBEYA PORT – SUEZ - EGYPT from 24/03/2009 till 02/12/2014.

- Rehabilitation for the existing port & extension new phase, Preparing Detailed drawings, Workshop drawings, & As-built drawings for Harbor engineering & Infrastructure works

- Construction cost about 120,000,000 L.E.

o WASTEWATER DESIGN, DESIGN REVIEW & SUPERVISION FOR SIX CENTERS IN KAFR ELSHEIKH - EGYPT from 01/03/2009 till 15/11/2009.

- Design wastewater networks & Pump stations for six centers in Kafr ElSheikh governorate, & review design for other consultants in project to prepare workshop drawing tell making construction supervision. o REVIEW OF ELECTRICAL DESIGN DRAWING FOR SHOUBRA ELKHEIMA WATER TREATMENT PLANT – Cairo - EGYPT from 26/02/2009 till 24/09/2012.

- The design & execution of extending domestic water station in Shubra ElKheima with a production rate of 200,000 m3/day, moreover the construction of a new intake with a production rate of 660,000 m3/day.

- Design review of electrical drawings.

Page 5 of 7

o ELECTRO-MECHANICAL & HYDRAULIC DESIGN REVIEW for NORTH HELWAN WATER TREATMENT PLANT – Cairo - EGYPT from 02/03/2009 till 25/12/2009.

- Helwan water treatment plant was constructed on 1960 with the capacity of 50,000 m3/d. On 1980 a new extension of 100,000 m3/d had been constructed. Recently an extension of 200,000 m3/d is to be constructed for the increasing demand.

- Design review of electro-mechanical and hydraulic design. o PREPARING WORKSHOP DRAWINGS, B.O.Q.s & AS-BUILT DRAWINGS for REHABILITATION PRIMARY TREATMENT & ADDING SECONDARY TREATMENT for ALEX. EAST WASTEWATER TREATMENT PLANT – Alexandria - EGYPT from 20/08/2008 till 02/12/2014.

- The project consists of two parts, first part of rehabilitation and extension work to provide primary treatment for an additional average raw wastewater inflow of 190,000 cubic meters/day. The second part will improve the treatment process to the secondary level and has been designed to handle an average raw sewage inflow of 800,000 cubic meters/day.

- Construction cost 1,750,000,000 L.E.

o EXPANSION of ESNAAD INDUSTRIAL AREA, and ADNOC HSE CAMP IN MUSSAFAH – ABOU DHABI – U.A.E. from 11/08/2008 till 30/06/2009.

- Design consultancy services for the infrastructure works.

- Design cost about $75,000 US Dollars.

o PREPARING MASTER PLAN for DRIKING WATER of QALUBIA 2037 – Qalubia - EGYPT from 21/07/2008 till 10/05/2009.

- Stage (1): Preparation of the Primary Report for the existing facilities including the following: 57 major surface water treatment plant, 126 water wells, 9 major pump stations, 126 water reservoirs (elevated tanks), 3500 km pipe line networks of pipes of diameter 200 mm to 1000 mm. The average daily production is 530 000 m3/day.

- Stage (2): Preparation of Final Report based on the social, population, development and water demand studies; reviewing and completion of hydraulic studies for water distribution system; prepare the alternative for the proposed project to improve the services every 5 years and identification of the high priority projects which will be implemented in the first 5 years plan.

- Stage (3): High Priority Projects.

- Stage (4): Preparation of Master Plan (2007-2037): recommendation of the best viable alternative and proposing the annual project construction and its cost.

- ECG scope include the following: Primary Report: include management, evaluation and data collection, geographical information system works, water quality analysis, flow measurement, review of data and previous plans, civilization and population studies, exist and future water consumption studies and maximum flow rate specification. Bases of Design Report: include architectural, electrical, mechanical and hydraulic bases of designs. Analysis and studies, issue finance.

- Consultancy & Design cost 2,500,000 L.E.

o PREPARING MASTER PLAN for DRIKING WATER of GREAT CAIRO 2037 – Cairo - EGYPT from 11/12/2006 till 10/05/2009.

- ECG scope comprising 4 stages: Preparation of the primary report; collection of technical data of the water treatment plant, pump stations, reservoirs and networks, study of previous scheme and plans of potable water system and evaluation of the existing situation regarding the production and distribution; preparation of final report; analysis of the technical data; preparation of Basis of Design Report (BODR) based on the social, population, development and water demand studies.

- Consultancy & Design cost 4,800,000 L.E.

• Quality Coordinator (QC) for INFRASTRUCTURE DIVISION assisting in any external Audit, assisting in project’s internal auditing, & applying new job descriptions for Junior Engineer, Senior Engineer & Principle Engineer adding KSA’s (Knowledge, Skills & Ability) for all.

• A member in ECG Operational Health & Safety (H&S) Committee (have a certificate from (O.H. &S.) Institute). Page 6 of 7

• Division coordinator & Division Manager Assistant for INFRASTRUCTURE DIVISION preparing Infrastructure work procedure, Infrastructure Manual, Monthly Division Report & Division Orientation for new members.

• PROPOSAL MANAGER ASSISTANT – assisting proposal manager in issuing (Pre Tender) proposal documents

(Technical envelope & financial envelope) for the following Proposals: o DESIGN, EXECUTION, COMPLETION AND MAINTINANCE OF ELSHADADIA INDUSTRIAL ZONE INFRASTRUCTURE WORKS – KUWAIT 09/2012 o ELGABAL ELASFAR WASTE WATER TREATMENT PLANT – EGYPT 01/2012 o SUEZ ELECTRICAL POWER PLANT 650 MW – EGYPT 08/2011 o UTILITY TANKS (6 TANKS) – Lusail – Doha – QATAR 07/2011 o INFRASTRUCTURE, ROADS, UTILITY TUNNELS – Lusail – Doha – QATAR 06/2011 o 6TH OCTOBER WASTE WATER TREATMENT PLANT – EGYPT 05/2011. o BANHA ELECTRICAL POWER PLANT – EGYPT 01/2011.

o NORTH GIZA ELECTRICAL POWER PLANT – EGYPT 10/2010. o SEWAGE TREATMENT PLANT ElMADINAH ALMUNWARAH – SAUDI ARABIA 06/2010. o SEWAGE TREATMENT PLANT DARSIT - OMAN 12/2009.

o ELKUWAIT INTERNATIONAL AIRPORT PACKAGE 2 07/2009. o NUWEIBA ELECTRICAL POWER PLANT 10/2009.

o ELEIN ELSHOKHNA ELECTRICAL POWER PLANT 09/2009.

o ABOU KEER ELECTRICAL POWER PLANT UNIT 6, 7 (Intake & Discharge) 01/2009. o ABOU KEER ELECTRICAL POWER PLANT UNIT 6, 7 08/2008. o THE WEST WASTE WATER TREATMENT PLANT in ALEXANDRIA 06/2008. o THE EAST WASTE WATER TREATMENT PLANT in ALEXANDRIA 04/2008. ACADEMIC EXPERIENCE:

An Assistant in AUC (American University in Cairo) Fall 2008

• For Dr. Emad Imam Teaching Fundamentals of Hydraulic Engineering (CENG 311).

An Assistant in AUC (American University in Cairo) Spring 2008

• For Dr. Emad Imam (chairman of construction department) teaching Fundamentals of Hydraulic Engineering

(CENG 311).

An Assistant in AUC (American University in Cairo) Fall 2007

• For Dr. Safwan Khedr teaching Highway & Transportation planning (CENG 431).

• For Dr. Emad Imam (chairman of construction department) teaching Engineering Analysis & Computation (ENGR 313-01).

• For Dr. Shereen ElBaradei teaching Engineering Analysis & Computation (ENGR 313-02).

• For Dr. Abdel Moatey assisting in submitting thesis of Highway project (CENG 490-02).

An Assistant in AUC (American University in Cairo) Spring 2007

• For Dr. Safwan Khedr teaching Transportation & Highway (CENG 431). COURSES & CERTIFICATES:

Master of Science (MSc) in Sanitary Engineering – Civil Department – Ain Shams University.

A member in SRA – EGYPT (EGYPT chapter of the Society for Risk Analysis – USA).

Operational Health & Safety Certificate from O.H.S. Institute – Cairo – EGYPT.

Professional Program in Project Management – A.U.C. (American University in Cairo), March 2009- May 2010

• Project Feasibility Study - Projects Bids & Contracts - Project Budgeting & Financial Control - Project Risk Management - Project time schedule - Project Resources & Leveling.

The recognition of a substantial contribution & participation in the Fifth Middle East Symposium on Structural Composited for Infrastructure applications (MESC-5) - Hurghada-EGYPT, May 23-25, 2008.

English Technical Language in Meeting, Negotiation and Decision-making course (INDE-002) in American University in Cairo (Engineering Service), January 13 – 17, 2008.

Cost Control of Engineering Projects course (CONE-001) in American University in Cairo (Engineering Service), February 3 – 7, 2008.

Page 7 of 7

SKILLS:

Language: Arabic (Mother tongue).

English (Excellent spoken and written).

Personal: Leadership, effective communication skills, a good partner in team, adaptive to versatile work environments, motivated, flexible, willing to learn and ability to work under pressure.

Computer skills: Professional in Microsoft Office (Word, Excel, & Power point), Auto CAD.

Internal Audit Management, ERP experience, Operations Management, Progress measurement & Development, Word processing/spread sheets, Resource management (People/Budget), Risk assessment, Numerical/statistical analysis, Teaching, Development, Change management, Coordination, Decision making, General Management, Leadership, Negotiation, People Management, Project Management, Senior Management experience, Team Management, Client Management, Contracts Negotiation, Monitoring & evaluation, Multistage Reporting, Project planning, Quality control, Quality Management, Reporting, and Risk Analysis.

PERSONAL DATA:

Date of birth: March 11th, 1984.

Place of birth: Cairo.

Military Status: Fully exempted.

Marital status: Married.

Number of children: (2)

A member in Egyptian Engineers Syndicate.

Valid driving license.

Member in El-Shams Club & Shooting Club.

REFERENCES AVAILABLE UPON REQUEST



Contact this candidate