EDWARD J CHMELA
*** **. ******** **. *** Plaines, IL 60016
847-***-**** **********@***.***
PROFESSIONAL SUMMARY
Engineering professional with (17) years of manufacturing management and Lean implementation experience. Responsible for creation, implementation and adaptation of continuous improvement programs in multi-plant, multi-state operations. Improves quality, delivery and profitability through waste reduction, efficiency gains and maintaining an upbeat positive attitude with enough of a sense of humor to make the day enjoyable. My goal is to attain a challenging position allowing me to utilize my knowledge and management experience along with my track record of waste removal and cost avoidance to develop beneficial and sustainable operational changes.
PROFESSIONAL EXPERIENCE
December, 2015 – Present – Continuous Improvement
JOHN CRANE, Morton Grove, IL – Manufacturer of seals for the oil & gas industries ($1176MM)
Promoted to Continuous Improvement Manager
Implemented Lean Manufacturing practices including training, 5S and visual management. Held accountable to audits conducted by offsite global Lean reps
Developed process to verify that machining parameters meet tooling parameters and transfer that data to CAM software database
Revised and optimized new plant layout including machinery moves from other buildings
January, 2014 – September 2015 – PLANT MANAGER
PROTECTOSEAL, Bensenville, IL – Manufacturer of vapor and flame control equipment ($30MM)
Direct manage 60 union employees and a staff of 6
Responsible for production, purchasing, manufacturing engineering and facility management
Improved on-time delivery from 63% to 97%
Introduced Lean concepts to improve production
November, 2011 – February 2013 – MANUFACTURING ENGINEER
DEZURIK, Schaumburg, IL - Provider of specialty valves ($25MM/$180MM)
Developed manufacturing processes previously undefined
Developed tooling solutions to improve efficiency
Maintained compliance to EPA operational requirements
Responsible for maintaining functional routings during implementation of a new ERP system
August, 2008 – November, 2011
LEAN CONSULTING, Des Plaines, IL - Various companies in the Chicago area
Analyzed operation flows to develop Lean solution plan
Developed operational specific 6S programs
Developed operational specific Lean programs
Developed changes along with implementation plans
Provided Lean training and implementation presentations
Developed visual recording and displays of related metrics to chart improvements
October, 2005 – August, 2008 – LEAN MANUFACTURING MANAGER
SEIGLES/STOCK BUILDING SUPPLY, Elgin, IL - Provider of professional building materials and services ($400MM/$5.2B)
Created and initiated an event driven Lean Manufacturing program that utilized continuous improvement methods along with available resources to address current needs while creating a culture of change within each environment through leadership and employee empowerment
Responsible for developing an approach for each individual location GM that included Lean education, an implementation plan with milestones and expected improvements to current metrics
Worked with customers to develop the most cost effective solutions while maintaining the highest quality
Planed and facilitated Lean events: develop team objectives, scope, and roster; perform formal team training for particular event type; counsel team throughout event to ensure objectives are reached; drive follow-up process to ensure gain sustainability
Facilitated successful Lean events realizing typical gains of 20-25% and up
Heavy involvement with Safety, Quality, Delivery and Productivity issues
Developed and created time reducing operational devices that allowed for improvement in safety and/or time reduction
Relocated and reduced Millwork facility layout by creating flow product cells, resulting in a 60% reduction of floor space
August, 2002 – October, 2005 - MANUFACTURING MANAGER
MPL/RINN (A DIVISION OF DENTSPLY CORP), Elgin, IL - Provider of products for dental professionals ($47MM/2.2B)
Began as an Industrial Engineer, involved in Kaizen events to form cells and improve workflow. Responsibilities covered 3 companies within division
Cost justification, selection, purchase, validation and implementation of $500k in capital equipment
Promoted to manager of component department due to production bottleneck. Improved production over 60% while improving efficiency from 66% to 99%. Implemented Kanban system along with visual scheduling. 15 direct reports
Promoted to Manufacturing Manager. Responsibilities include Assembly department, component department, Maintenance/tool room and engineering support for remaining component departments. Improved efficiency from 62% to 78% in Assembly department. Involved with the implementation of visual scheduling and coordinated production between scheduling and other departments to better utilize resources. 40 direct reports
Responsible for estimation, creation and adherence to departmental budgets
Worked under FDA and ISO requirements
October, 2000 – December, 2001 - SENIOR MANUFACTURING ENGINEER/AREA MANAGER
TUTHILL CORP., Elk Grove, IL - Provider of machined products for large equipment manufacturers. ($27MM)
Participated in and led multiple Kaizen events pertaining to cellular improvement, cellular implementation, SMED and design improvements
Implemented production and scheduling boards to improve on-time delivery from 65% to 94%, while reducing backlog
Project leader in resolving major manufacturing problems at other companies within our division (New Haven, IN and Mendota Hts, MN)
Made production improvements in machining and assembly areas generating annual savings of over $50,000
Management of the Tool Room, Tool Crib, Tool Grinding and CNC area, consisting of (7) employees, were added to my responsibilities
Maintained ERP through SAP
May, 1998 – October, 2000 - MANUFACTURING ENGINEER/MAINTENANCE MANAGER
BODINE ELECTRIC COMPANY, Chicago, IL - Manufacturer of fractional horsepower electric motors, gearmotors, and system-matched motion controls. ($60MM)
Implemented cellular manufacturing, utilizing one-piece-flow technique, Kanban applications, set-up reduction and Kaizen events
Became lead engineer on capital equipment justifications & purchases in excess of $2,000,000
Responsible for bringing newly developed products into production
Revised processes to reduce manufacturing time thus increasing productivity and reducing cost
Management of the maintenance department, which contained (9) skilled mechanical, electrical and facilities people, was added to my responsibilities
Safety team leader including safety program management
Responsible for development of maintenance budget
December 1996 – May, 1998 - MANUFACTURING ENGINEER
MPC PRODUCTS, Niles, IL - Manufacturer of products for the aerospace industry ($125MM)
Responsible for all manufacturing vendor inquiries
Determined corrective action for discrepant incoming parts utilizing functionality, need and re-workability
Worked with CNC turning, CNC milling and E.D.M. on processing, quality and machining concerns along with fixturing and process changes to enhance production
Revised tool crib operation while working within current computer system
Given the responsibility of bringing a $500,000 Navy project to completion
August 1993 – December 1996 - MANUFACTURING ENGINEER/TOOL CRIB MANAGER
ACME INDUSTRIES, Des Plaines, IL - Manufacturer of medium to large precision products. ($37MM)
Developed routings, tool lists and process drawings in a CNC environment
Streamlined processes through the use of time studies & the implementation of new tooling, producing annual savings of over $100,000
Tool purchasing and organization, were added to my responsibilities which included over $600,000 in tooling purchases annually and supervision of tool crib employees
Developed a computerized bar code system to relate tooling costs to particular jobs
On a daily basis managed new projects and provided shop floor support
Interacted with quality control to develop & maintain manufacturing standards
Continued constant involvement with vendors to produce best value and managed system to keep optimum balance of on hand tooling
August 1992 – August 1993 - QUALITY/PRODUCTION ENGINEER
CAMCRAFT, Franklin Park, IL - Manufacturer of precision machined components ($60MM)
Worked with AutoCAD on revisions
Designed and implemented employee training program
Used SPC to identify and correct quality flaws
Traced and resolved actual production vs. quote discrepancies
EDUCATION
Bachelor of Science, May 1992, Northern Illinois University, Dekalb, IL
Major: Manufacturing Engineering
Heavy math background.
Advanced computer literacy