DETAILED PORTFOLIO
Senior Architect Engineer
A top-performing Architect Engineer and Professional Construction Manager with over 14 years of experience in constructing hotels, hospitals, administration, educational and retail buildings, Contributed to 17 different and complex architectural designs, many of which have received recognition for their superior features and safety, Proficient in modern international standards, industry regulations, and efficiency benchmarks, with experience in consultancy and contracting with international companies.
Currently seeking for an organization that offers challenge and growing opportunities.
Areas of Expertise
Exterior & Interior Finishing Works
Construction Management
Engineering Supervision
Quantities Surveying
Technical Reporting
Project & Contract Management
Contract Administration
Project Control
Risk Management
Procurement Management
Material Approvals
Coordination Drawings
Drawing Review & Revision
AutoCAD
Primavera P3 & P6
Key Skills Assessment
E XECUTION OF A RCHITECTURAL F INISHING S TAGES – Strong background in the finishing works and architectural finishing materials for external and internal works. Extensive experience in construction management for all finishing stages and managing several projects simultaneously within the given deadlines supported by high personal skills. Proven track record of leading system integrations including software and civil disciplines.
T ECHNICAL O FFICE W ORKS – Professional in drawings review & revision with high ability on developing and preparing architectural technical details and technical reporting. Extensive experience in coordination drawings and works, expertise in reviewing and preparing material approvals according to the specs, modern international standards and industry regulations.
P ROJECTCONTR AND ACTMANAGEMENT – Expertise in maintaining budgets, project control, contract management and claims aspects. Extensive experience in planning and control techniques, resource management, budgeting and financial control, risk management concepts and techniques, and PMBOK international standards. Professional in investigating and analyzing the project performance and performing the preventive and corrective measures for project efficiency. Page 2 of 14
Personal Information :
Name : Mohamed Lamloom Abdelazeem Khalifa
Date of birth : 26/1/1981
Military status : COMPLETED.
Marital status : MARRIED
Nationality : Egyptian
Mobile : +966*********
Home No.(Egypt) : +208********
E-mail : *************@*****.***
Link : https://sa.linkedin.com/in/mohamed - lamloom - 52494941 Education & Certification:
First University Degree : B.Sc. Of Architecture Engineering EL Minia University May, 2003
Graduation project : Very Good
Grade : Good
Second University Degree
Computer Skills
Language:
Arabic : Mother Language
English : Very Good
: Diploma Of Project Management Professional
(PRMG) the American University in Cairo,2015
Project planning and control techniques
Management of project resources
Project management international standards
(PMBOK® Guide ver.5)
Project budgeting and financial control
Project planning and scheduling professional
Project risk management
: AutoCAD 2d - Primavera P3&P6 - Microsoft
Office (Excel – Word-PowerPoint)
Page 3 of 14
Work Experience:
Current Job :
Job Title : Senior Architect Engineer
Employer : AMO & PARTNERS Engineering CO.
Employer Country : Saudi Arabia - Dammam
From : December 2016
Job Description
Duties & Responsibilities :
: Architectural team leader for the detailed design stage of Ajdan water front (F&B) project in Al-Khobar
• Preparing architectural design drawings
• Coordinate with sub-consultant for design stage
• Coordinating between civil, architect, landscape and Electromechanical works during design process
• Develop and prepare architectural technical details
• Prepare and review the contract documents (BOQ, Specs. & Drawings)
• Prepare the technical replies on tendering queries Project Description :
- Ajdan waterfront is a mixed-use master development on the eastern sea coastline of Al Khobar on 39,768 m2 plot to achieve development flexibility in construction, sales and operation stages.
- This development sits well to capitalize on its proposed location to create of an authentic urban district that is envisaged to become a major F&B destination.
- Developer has decided to subdivide the land into two parcels (A & B), Parcel A is designated to Luxury Residential use (Sub-Parcels A1 & A2) and Hospitality use
(Sub-Parcel A3) on 20,000 m2 plot size, Parcel B is positioned for high end F&B and Retail usage on 16,000 m2 plot size and consisting of:
• 7 two-storey retail buildings.
• 3 single-storey F&B buildings.
• Four-storey office building.
• Outdoor public space (Plaza Area).
• Basement car park.
Page 4 of 14
Previous Employment:
Job Title : Senior Architect Engineer
Employer : CRCC (China Railway Construction Corporation) Employer Country : Saudi Arabia - Riyadh
From
To
: January 2016
: December 2016
Job Description : Senior Architectural in the core team of the technical department of the KAP 5 project in Riyadh
Project Cost : $ 2666M (approximately SR 10000M)
Duties & Responsibilities :
• Coordinate with sub-consultant for design stage
• Review and coordinate all related design drawings which prepared from the side of sub-consultants
• Preparing architectural shop drawings
• Coordinating between civil, architect & low current and Electromechanical works
• Coordinate between shop drawings process along with the site construction activities
• Develop and prepare architectural technical details
• Review and coordinate all related shop drawings which prepared from the side of the sub-contractors before the initiation of the manufacturing as the wooden, metal and aluminum doors, aluminum windows, curtain walls, structure glazing, sky light, etc..
• Review and coordinate all related shop drawings for facades cladding works with other architectural and structural works which prepared from the side of the sub-contractors before the initiation of the manufacturing as precast and G.R.C works
• Review and coordinate all related shop drawings for furniture, kitchens, dining halls and laundries facilities which prepared from the side of the suppliers before delivering and confirm the compliance with the project requirements
Project Description :
• - KAP5 - King Abdullah Bin Abdul Aziz Project for the Development of the Security Facilities for MOI Stage 5 which containing 88 prototype with 243 site, every site consists of several buildings with all services and needs which were defined through the end user in Riyadh, Eastern Region, Hail, Qassim, El Medina El Munawarah, Makkah, and Jeddah
Page 5 of 14
Previous Employment:
Job Title : Senior Architect Supervisor
Employer : Saudi Diyar Consultants
Employer Country : Saudi Arabia – Medina
From
To
: July 2013
: December 2015
Job Description : Supervision on constructing Coral El-Medina hotel in central area in El-Medina El- Monawara
region plots no. 404*-****-**** (5 Stars)
Project Cost : $ 59M (approximately SR 222M)
Duties & Responsibilities :
• Supervision on executing the finishing works
• Review and coordinate all related design and shop drawings
• Auditing and adoption the architectural material
• Review, comment and approve the method statement of construction proposed by the contractor
• Ensure that the contractor complies with drawings and design in terms of design, material and workmanship standards
• Coordinate between shop drawings process along with the site construction activities
• Review, comment and approve all related shop drawings which prepared from the side of the sub-contractors before the initiation of the manufacturing as the wooden, metal and aluminum doors, wooden cladding, aluminum windows, curtain walls, structure glazing, sky light, fiber fixed tent, clean device machines, etc.
• Review, comment and approve all related shop drawings for facades cladding works which prepared from the side of the sub-contractors before the initiation of the manufacturing as precast and G.R.C works
• Review, comment and approve all related shop drawings for furniture, kitchens, dining halls and laundries facilities which prepared from the side of the suppliers before delivering and confirm the compliance with the project and operator requirements
• Issue site instructions to the contractor on all corrective action
• Receive and release inspections requests with the related actions
• Review and comment on monthly payments, v.o and claims
• Review the project performance to identify the progress status Building Description :
• The external elevation executed by precast concrete G.R.C & marble, PVC tent, aluminum windows, corbels and curtain walls.
• The building consists of (five basements, ground floors, mezzanine, ten typical floor, lower roof, upper roof and helipad). Page 6 of 14
Previous Employment:
Job Title : Finishing Engineer & Technical Office
Employer : Modern Buildings Contracting Company
Employer Country : Saudi Arabia – Medina
From
To
: January 2012
: June 2013
Job Description : Constructing hotel building in central area in El-Medina El-Monawara region plot no. 5021
(5 Stars)
Project Cost : $ 11M (approximately SR 42M)
Duties & Responsibilities :
• Construction manager for the finishing works
• Preparing shop drawings
• Coordinating between civil, architect & electromechanical works
• Quantities surveying
• Preparing sub-contractors abstracts
Building Description :
• The external elevation executed by G.R.C & granite & Riyadh stone and structure glazing.
• The building consists of (three basements, ground floor, mezzanine, ten typical floors, lower and upper roof)
Page 7 of 14
Previous Employment :
Job Title : Architectural Works Manager
Employer : Atiah M. Al Thobiti & Bros. Company
Employer Country : Saudi Arabia – Medina
From : June 2011
To
Job Description
: January 2012
: Constructing General Classrooms &
Laboratories Male Building No. (B16) -
Phase (c1 & c2) – Taiba University - El-
Medina El-Monawra Region
Project Cost : $ 24M (approximately SR 90M)
Duties & Responsibilities :
• Construction manager for all finishing works
• Coordinating among other works such as electrical, mechanical, low current, medical gases, structure and architecture works
• Technical office manager responsible for the production of architectural shop drawings
• Preparing variation orders and claims
• Preparing material approval & invoices
• Preparing technical and financial comparisons for all vendors and suppliers for architectural materials
• Following up the time schedule
Building Description :
• The external elevation executed by precast & granite and curtain walls.
• The building consists of (lower ground, upper ground, first floor, roof and internal landscape)
• Internal landscape consists of (water fountains, granite & stone paving, wooden bridge, tent, raised planters)
Page 8 of 14
Previous Employment :
Job Title : Finishing Engineer
Employer : Bin Ladin Group –A.B.C.D department
Employer Country : Saudi Arabia – Medina
From
To
: December 2009
: June 2011
Job Description : Constructing the national guard hospital in El-Medina El-Monawra region
Project Cost : $ 174M (approximately SR 653M)
Duties & Responsibilities :
• Following up executing the finishing works
• Coordinating among other works such as electrical, mechanical, low current, medical gases, structure and architecture works
• Preparing daily, weekly and monthly reports of construction activities to assigned building
• Following up the time schedule
Building Description :
• The external elevation executed by precast
• The building consists of (basement, ground floor, first floor and penthouse)
Page 9 of 14
Previous Employment:
Job Title : Finishing Engineer & Technical Office
Employer : Elkhereiji Company for commerce & contracting Employer Country : Saudi Arabia – Medina
From : July 2007
To : November 2009
Job Description : constructing hotels buildings in central area in El-Medina El-Monawara region plot no. 2051 (5 Stars) & plot no. 3020 (4 Stars)
Projects Cost : $ 19M (approximately SR 72M)
Duties & Responsibilities:
• Following up executing the finishing works
• Preparing shop drawings
• Coordinating between civil, architect & electromechanical works
• Quantities surveying
• Preparing invoices & variation orders
• Preparing the monthly & final abstracts
• Preparing sub-contractors abstracts
Building Description For Plot No.2051:
• The external elevation executed by artificial stone, granite, structure glazing and curtain walls
• The building consists of (three basements, ground floor, mezzanine, ten typical floors, lower and upper roof)
Building Description For Plot No.3020:
• The external elevation executed by G.R.C, granite, structure glazing and curtain walls
• The building consists of (two basements, ground floor, mezzanine, ten typical floors, lower and upper roof)
Page 10 of 14
Previous Employment:
Job Title : Finishing Engineer & Technical Office
Employer : Allami Company for trading & contracting Employer Country : Saudi Arabia – Medina
From : December 2005
To : July 2007
Job Description : Constructing hotels buildings in central area in El-Medina El-Monawara region plot no. 103 (3 Stars) & plot no.3006 (4 Stars)
Projects Cost : $ 15M (approximately SR 57M)
Duties & Responsibilities:
• Following up executing the finishing works
• Preparing shop drawings
• Coordinating between civil, architect & electromechanical works
• Quantities surveying
• Preparing the monthly & final abstracts
• Preparing sub-contractors abstracts
Building Description For Plot no.103 :
• The external elevation executed by artificial stone, marble, structure glazing and curtain walls
• The building consists of (three basements, ground floor, mezzanine, fourteen typical floors, lower and upper roof and helipad) Building Description For Plot no.3006 :
• The external elevation executed by marble, granite and curtain walls
• The building consists of (two basements, ground floor, mezzanine, ten typical floors, lower and upper roof)
Page 11 of 14
Job Description : Site engineer for a complete sewage project and compact Station for water treatment
Project Cost : $ 5.2M (approximately LE 28.5M)
Duties & Responsibilities:
• Following up the implementation of works as under pressure lines
& under gravity networks and installation of manholes
• Supervision on civil, architecture and mechanical works of sand & gravel filters, lower water tank, outlet room, sterilization room, administration rooms and under pressure line for the water compact station
• Preparing daily, weekly and monthly reports of construction activities to assigned building
• Quantities surveying
• Preparing the monthly abstracts
• Preparing sub-contractors abstracts
Availability & Job Requested:
Availability : I am able to start work during month from the announcement As : Full Time
Job Field : Architecture, Technical Office, Finishing Works, Construction Management, Engineering Consulting, Project Management, Contract Management, Cost Control, Project Control, Procurement Management, Contract Administration and Claims
Job Location : Egypt - Arab Countries
Thanks for giving me such a precious time of yours Mohamed lamloom
All original documents are available upon request Pr Previous Employment :
Job Title : Site Engineer
Employer : The Public Egyptian for Buildings Company Employer Country : Egypt – Beni Suef
From : January 2005
To : December 2005
Page 12 of 14
Portfolio:
Page 13 of 14
Page 14 of 14