r.jayaganesh
**+ years of work experience as a Mechanical Engineer in-depth understanding of Enterprise resources planning aspects, quality and customer orientation existing in an Organization.
Progressive advancement as Project Control with a broad knowledge on project engineering, cost control.
Preparation of documents and execution for rotating and static Equipment’s documents
Responsible for the maintenance related project schedule, costs and quality utilization
Preparation and follow up for sub-contractor material for piping, steel structure and equipment work.
Estimation of Manpower Requirement for the Project based on standard productivity norms.
Review and forecast Contractor Work front availability and conduct continuity of work analysis.
Preparation Executive Progress Summary Report / Presentations to the Top Management on Project Status for periodical review
Implementation of the Cost Control System, elaborate the consolidated Cost Breakdown Structure, tables, curves, resources logs (Manpower, Materials, Equipment) as reference of base line Schedule.
Strong conceptual depth knowledge in SAP MM
Understand all projects in-depth to order materials/equipment, issue subcontracts, and develop billings.
Safety, Health & Environment Training – Singapore
Live Fire Extinguisher Training – Tabuk, Saudi Arabia
North West Armed Forces Hospital, Tabuk, Saudi Arabia
Project 1#: Multi story Hospital building construction project, design plumbing swage water, hot water, HVAC Ducting, AHU, Chiller, Boiler.
Project 2#: Existing boiler, chiller, medical-non medical compressor Steam generator, AHU, FCU, and Ducting. Renovation Project
Designation: Mechanical Engineer / Project Engineer
Highlights:
Collect existing model Specification & Functional details.
Preparing bill of quantity and get approve form management authority
Evaluate builders, contractor. Analyze Tender Document.
Call for the Tender and Analyze vender price comparison.
Arrange management meeting discus with price Negotiation.
Execute project. Make report, weekly, monthly basis. Preparation of permit to work based on all erection, Hot and Cold works
Lockheed Engineering limited
Project 1: Structural fabrication projects
Client: BGR energy systems ltd
Designation: Project Engineer
Documentation Responsibilities:
Support to costing department to rise our quotation & Invoicing
Preparation of documents and execution for rotating and static Equipment’s documents
Run and analyzed Plan Compliance KPI reports.
Responsible for the maintenance related project schedule, costs and quality utilization
Preparation of vendor documents for equipment’s
Preparation of work permit and get approval from the Clint
Preparation of Bill of material
Execution Responsibilities
Activities report, Claims register, Payment status register,
Everyday manpower allocation on site activities
Attend Daily Meeting Hard week schedule meeting with client
Participating in inspections and testing of equipment as required
Monitoring and controlling of as per schedule and progress on site
Every day equipment plan & allocation (Crane, lorry crane, etc
Attend customer kick of meeting for technical evaluation
Daily, Weekly and Monthly Efficiency reports on the basis of Actual Man Hours and Earned Man Hours.
Project 2: Metro rail passenger shelter
Client: L & T Construction
Designation: Project Engineer
Highlights:
Receiving of Requisition Order (RO) from Engineers & Floating of Enquiries to Suppliers
Project Management Systems such as Scheduling, Monitoring and MIS including Preparation & Monitoring of level 4. resource loading / resource leveling,
Collecting of Quotations from suppliers, negotiation, preparation of Comparative statement, choosing of Supplier and issuing of Purchase Order (PO) to the supplier
Preparing of manpower and resources
Daily coordination with testing and pre commissioning teams
preparation of material requisitions,
Procurement of all the materials
Coordinate with sub contract for mobilization and demobilization of equipment’s
Preparation and follow up for sub-contractor material for piping, steel structure and equipment work.
Project 3: Injection Water Filter
Client: Kupps & Sachs Pvt. ltd
Highlights:
Review of Plan Drawing, ISO metric & steel structure drawing to ensure availability of material &consumable equipment & machinery and manpower
Lifting plan for erection of heavy equipment, all types pipe spools & steel structural
Maintain sub-contractor register
Consolidate the construction activities report and submit for final clearance
Monitor & preservation of incoming mechanical equipment
Check and ensure the level and elevation of the foundation and pad plates for erection of equipment
Check and ensure the alignment of static and rotating equipment’s
Preparation of monthly weekly schedule
Preparation of work completion and acceptance report based on job packs and test packs.
Ensure the pre-fabricated pipe spools in the shop floor
Lifting plan for erection of steel structure and all types’ pipe spools.
Bala Engineering Pte. Ltd. Singapore
Designation: Mechanical Engineer
Highlights:
Preparation and follow up for sub-contractor material for piping, steel structure and equipment work.
Preparation & ensure the safety measures in all project and maintenance activities
Daily progress monitoring, Project Progress Monitoring
Maintain sub-contractor register
Consolidate the construction activities report and submit for final clearance
Monitor & preservation of incoming mechanical equipment
Check and ensure the alignment of static and rotating equipment’s
BGS Steel Industries Pvt. Ltd
Project: Runway track line guide way
Client: Airport authority of India
Designation: Planning Engineer
Highlights:
Collecting of Quotations from suppliers, negotiation, preparation of Comparative statement, choosing of Supplier and issuing of Purchase Order (PO) to the supplier
Attending daily and weekly meeting construction coordination meeting
Tracking and maintain scope changes of Mechanical items for Piping; Structural Steel; Piping & Mechanical Equipment’s and its effect on the overall project schedule.
Estimation of Manpower Requirement for the Project based on standard productivity norms.
Review and forecast Contractor Work front availability and conduct continuity of work analysis.
Preparation Executive Progress Summary Report / Presentations to the Top Management on Project Status for periodical review
Implementation of the Cost Control System, elaborate the consolidated Cost Breakdown Structure, tables, curves, resources logs (Manpower, Materials, Equipment) as reference of base line Schedule.
Preparation of Progress Measurement system & procedure, planning system & procedure.
M/s PIPE LINE ENGINEERS, Engineers & Contractors
Client: BHEL (BHARTH HEAVY ELECTRICALS LIMITED)
Designation: Site Engineer
Highlights:
Review of pilot Plan, Isometric drawing to ensure availability of material &consumable equipment & machinery and manpower.
Preparation & ensure the safety measures in all shop floor activities
Customer co-ordination to obtain work permit
Manpower allocation for day-to-day activities
Guide the shop floor Technicians/labors to complete their production as per plan
Preparation and Co-ordination for final assembly.
Execution to ensure the production schedule & Indent quality to satisfy customer requirement
Preparation of indent of material and consumables
Co-ordination to obtain stage clearance from QA/QC and customer
Consolidate the shop floor activities report and submit for final clearance
Bachelor of Engineering in Mechanical Engineering from University of Madras
Date of Birth: 3rd July 1977
Known Languages: English and Tamil.