Post Job Free
Sign in

Electrical Engineer

Location:
Wazirabad, Punjab, Pakistan
Salary:
55000
Posted:
April 14, 2018

Contact this candidate

Resume:

SAQIB ALI

Present Address:

Village Nahalo chak post office Aziz chak

Teh. Wazriabad Dist. Gujranwala Punjab Pakistan.

ac44v2@r.postjobfree.com

Mob:-# +92-346-******* - +92-300-*******

OBJECTIVE

To pursue a challenging career, where my experience can be put in the best use, this demands the best of my professional ability in terms of technical skills, serving in growth of organization and in turn getting benefits for successful career.

Career Summary

August 2016 – February 2018

Designation: Engineer (E&I)

Company: Descon Engineering Ltd Pakistan

Key Skills & Major Tasks in Project Execution

Design

Source Approval of Vendors for project execution.

Study and Review of Vendor Documents regarding Electrical and Instrumentation System like Diesel Generators, Transformers, MV, LV Panels, Main Distribution Panels, LTPs, PLC Panels, Local Control Panels, Lighting Poles, Lighting Fixtures Junction Boxes, Distribution Boards, Local Control Station supports arrangements, Cable Tray design and arrangements and Isolator Switches support arrangements.

Approval of Electrical and Instrumentation Shop Drawings and Vendor Documents.

Study and Review of Single Line Diagram (SLD).

Study and Review of Cable routing layout.

Approval of Technical Data Sheets for Power Cables.

Approval of Technical Data Sheets for LED.

Planning

Look Ahead Plan Preparation.

Progress Monitoring

Site Activity Monitoring.

Official Documentation and Record keeping.

MTO Preparation according to Drawings.

Contractual Letter drafting, Consultant/Client Query Solving and Preparation.

Participation in Technical and site Electrical & Instrumentation meetings.

PRs Generation in SAP.

Procurement

Coordination in Procurement of Diesel Generators.

Coordination in Procurement of Transformers.

Coordination in Procurement of MV, LV Panels.

Coordination in Procurement of Cable Trays with all accessories.

Technical Data sheets of Power Cables review and comparison for cables procurement.

Coordination in Procurement of Distribution Boards and junction boxes.

Procurement of cable glands and lugs.

Procurement of lighting fixtures.

Construction

Installation of Electrical and Instrumentation Embedded parts.

Installation of Pvc, GI and flexible conduits.

Installation of cable trays.

Cable laying & cable dressing.

Installation of cable tags and ties.

Cable glanding and termination.

Installation Termination, Testing Commissioning of MV, LV Panels.

Installation testing commissioning of Diesel Generates.

Installation testing commissioning of Transformers.

Installation testing commissioning of Main Distribution panels.

Installation testing commissioning of PLC panels.

Installation testing commissioning Local Control panels.

Installation testing commissioning of Low Tension panels.

Loop testing.

Resistance insulation test of cables (Meggering).

Installation Testing Commissioning of Local Control Stations.

Installation Testing Commissioning of Gate Position Sensors.

Gate Operation through SCADA System.

Water level sensor, Proximity sensors and CCTV Camera Installation and Commissioning.

Electrical Equipment Earthing,

RIT clearance as per QC standards and Technical Requirement.

Installation Testing Commissioning of Electronic Toll Plaza Barriers.

Installation Testing Commissioning of Lighting Poles.

Supply Testing Commissioning of Gantry Cranes.

Installation of Emergency Stop Buttons.

Coordination with Client /Consultant, understanding their requirements and executing the job as per contractual agreements and client suggestions.

Professional Training:

Supervisory Skills

SCADA, Local Control Panel and Piezometer

Internship

Designation: Internee

Internship at Gujranwala Electric Power Company (GEPCO) WAPDA. Duration: One and half month.

Major Tasks in Gepco & Shutdown

Customer services at GEPCO Head Quarter.

Information about Electricity Bills.

Project Management Unit (PMU) at GEPCO Head Quarter. Necessity of New Grid Stations.

Protection & Instruments (P&I) at following places. Having experience of 132 KV Grid Station Wazirabad annual shutdown. Having experience of 132 KV Grid Station Rahwali Cantt DC Colony annual shutdown.

Educational Visit

Heavy Electrical complex Hattar.

Manufacturing of Transformers.

Professional Affiliation

Member of Pakistan Engineering Council (PEC) ELECT/ 55685

Education

UET Taxila (SCET) (2012-2016)

BSc Electrical Engineering (Power)

CGPA: 3.00/4.00.

Final Year Project: “Three Phase Transformer on load automatic tap changer”

HSSC Abdalian School Muzaffar Ghar (2012)

BISE: D.G Khan.

Marks: 62.54%.

SSC Misali School Daska. (2010)

BISE: Gujranwala

Marks: 75.34%

Computer Proficiency

MS Office (Power point, Excel & Word)

Presentation Skills

Good internet Skills

MATLAB

C++ Programming

Hobbies

Playing Cricket

Reading News Paper

Personal Details

Father’s Name: Zaka Ullah

Nationality: Pakistani

Passport No: PS1813931

Religion: Islam

D.O.B: 20 April. 1994

Marital Status: Single



Contact this candidate