Post Job Free
Sign in

Engineer Project

Location:
Patna, BR, India
Posted:
April 13, 2018

Contact this candidate

Resume:

Kumar Shashank

(BMS Project Engineer)

Equipment Installation & Commissioning

Building Management System/IBMS HVAC Specialist

Contact Details: 108 B, Barganda Chowk, Cyclone Enterprises Giridih – 815301, Jharkhand.

Email Id:***********@*****.***

Contact: +917*********

Professional Profile:

A result oriented and competent Electrical and Electronics Engineering professional with 2 years of experience and knowledge in project life-cycle that includes project design, planning, equipment installation & commissioning, testing and software integration with proven track record of meeting project commissioning deadlines. Current Employment:

Company - Triton Process Automation Pvt Ltd.

Role - Project Engineer-BMS

Responsibilities:

Preparing I/O point’s summary, Bill of quantity (BOQ), Controller selection, Material ordering according to the requirement of project specification.

Carry out the planning, technical reviews, approvals and process of all technical submittals such as drawings, materials, method statement, work procedure, project schedule etc. for constructability and code compliance.

Carrying out the inspection of works executing by contractor in respect of works relative to BMS field devices installations as per the approved drawings and proper quality is maintained as per the International Standards.

Obtaining approval of drawing to ensure effective management, including site progress, installed material measurement, resolutions of site problems etc.

Ensuring proper maintenance of site records and site progress report.

Participating in technical coordination and progress meeting with client & site coordination discussions with consultants & sub-contractors.

Lead the project throughout execution, testing and commissioning and final handover of Project with complete project management accountability.

Project accomplished:

Project name : AIIMS(All India Institute of Medical Science), Raipur

Software used : WEBs Honeywell (Niagara Platform)

Protocols used : Modbus, BACnet

Client : Voltas LTD.

Role : Project Engineer – BMS

Other projects:

Birlasoft, Noida (UP)

Infinity Tower, Cyber city Gurgaon (Haryana)

Honeywell one, Gurgaon (Haryana)

APPLE, Gurgaon (Haryana)

DRDO, New Delhi

WEwork, Bangalore

Previous work experience:

Honeywell Automation India Ltd. (Outsourced) at DIAL (Delhi International Airport Limited) - IGIA- T3 site Responsibilities:

Operation, maintenance and troubleshooting of H.V.A.C, Chiller plant, Cooling tower and Substations.

Temperature controlling and monitoring the health of AHU’S, FCU’S, Motors and other HVAC devices for energy management purpose.

Operating BMS (Building management system) SCADA named Honeywell EBI (R400.2).

Generating reports, trends analysis, alarm logging, fault detection and scheduling on SCADA.

Edit and design EBI graphics for comfortable operation.

Server installation and configuration.

Programming and configuration of DDC controllers.

Plan PM (preventive maintenance) of all HVAC Field Devices.

Responsible for closure of service calls received during shift operation.

Manual Testing and maintenance of Points (sensors) and DDC panels (includes SPC, IPC and Expio controllers).

Responsible making MIS report, Kaizen.

Project Summary:

Project : Indira Gandhi International Airport, New Delhi Software used : Honeywell EBI (R400.2), Comfort-point studio, HMI Quick Builder Protocols used : Modbus, BACnet

Client : DIAL-GMR.

Role : HVAC Control Engineer

Educational Qualifications:

Degree Discipline Board/University Name of the

School/College

Year of

Passing

Percentage

BE EEE VTU SJBIT, Bangalore 2016 62

12th PCM CBSE Subhash Public School,

Jharkhand

2011 65

10th - CBSE SSV Mandir, Jharkahnd 2009 84

Technical skills/Technical proficiency:

Hands-on experience on engineering Design (Hardware, software, Graphics) installation and configuration of DDC controllers for BMS project.

Experienced in Honeywell WEBs, EBI and Control Trends.

Experience in Operation & Maintenance of BMS System (Honeywell).

Knowledge of commissioning and installation of BMS/IBMS systems for Honeywell building control product.

Hands on experience on Auto CAD.

Knowledge in programming and setup of PLC, SCADA and monitoring system.

PLC (Schneider Electric, OMRON, DELTA, Siemens, ABB, GE, Allen Bradley)

SCADA/HMI (IFIX, Citect, WINCC, INTOUCH, Rockwell Automation)

PAC (Schneider Electric),VFD(Schneider Electric, ABB, Danfoss), ISPW, MCC Panel

Pneumatics & Field Instruments

Knowledge about Networking, Server, Network Switch, Router, Protocols, LAN, WAN installation and configuration.

Basic knowledge of C

Practical experience with MS office including outlook,Word, PowerPoint, MS-Excel

Certifications

Post Graduate Diploma in Industrial Automation (Trained by SMECLABS).

Sensorics and Servo Drives & Control training at Center of Excellence for training and Research in Automation technologies (CETRET) by REXROTH BOSCH GROUP.

Successfully completed Advance level training on EBI(R500) Honeywell by HONEYWELL AUTOMATION.

Personal details

Date of Birth : 2nd March 1994

Gender : Male

Nationality : Indian

Marital status : Unmarried

Passport number : P9351095

Father’s name : Ramesh Kumar Singh

Languages Known : Hindi, English

Declaration

I hereby declare that all the above information given by me is true to my knowledge and I hold the responsibility of the above mentioned information.

Date:

(Signature)

Place: Kumar Shashank



Contact this candidate