Kumar Shashank
(BMS Project Engineer)
Equipment Installation & Commissioning
Building Management System/IBMS HVAC Specialist
Contact Details: 108 B, Barganda Chowk, Cyclone Enterprises Giridih – 815301, Jharkhand.
Email Id:***********@*****.***
Contact: +917*********
Professional Profile:
A result oriented and competent Electrical and Electronics Engineering professional with 2 years of experience and knowledge in project life-cycle that includes project design, planning, equipment installation & commissioning, testing and software integration with proven track record of meeting project commissioning deadlines. Current Employment:
Company - Triton Process Automation Pvt Ltd.
Role - Project Engineer-BMS
Responsibilities:
Preparing I/O point’s summary, Bill of quantity (BOQ), Controller selection, Material ordering according to the requirement of project specification.
Carry out the planning, technical reviews, approvals and process of all technical submittals such as drawings, materials, method statement, work procedure, project schedule etc. for constructability and code compliance.
Carrying out the inspection of works executing by contractor in respect of works relative to BMS field devices installations as per the approved drawings and proper quality is maintained as per the International Standards.
Obtaining approval of drawing to ensure effective management, including site progress, installed material measurement, resolutions of site problems etc.
Ensuring proper maintenance of site records and site progress report.
Participating in technical coordination and progress meeting with client & site coordination discussions with consultants & sub-contractors.
Lead the project throughout execution, testing and commissioning and final handover of Project with complete project management accountability.
Project accomplished:
Project name : AIIMS(All India Institute of Medical Science), Raipur
Software used : WEBs Honeywell (Niagara Platform)
Protocols used : Modbus, BACnet
Client : Voltas LTD.
Role : Project Engineer – BMS
Other projects:
Birlasoft, Noida (UP)
Infinity Tower, Cyber city Gurgaon (Haryana)
Honeywell one, Gurgaon (Haryana)
APPLE, Gurgaon (Haryana)
DRDO, New Delhi
WEwork, Bangalore
Previous work experience:
Honeywell Automation India Ltd. (Outsourced) at DIAL (Delhi International Airport Limited) - IGIA- T3 site Responsibilities:
Operation, maintenance and troubleshooting of H.V.A.C, Chiller plant, Cooling tower and Substations.
Temperature controlling and monitoring the health of AHU’S, FCU’S, Motors and other HVAC devices for energy management purpose.
Operating BMS (Building management system) SCADA named Honeywell EBI (R400.2).
Generating reports, trends analysis, alarm logging, fault detection and scheduling on SCADA.
Edit and design EBI graphics for comfortable operation.
Server installation and configuration.
Programming and configuration of DDC controllers.
Plan PM (preventive maintenance) of all HVAC Field Devices.
Responsible for closure of service calls received during shift operation.
Manual Testing and maintenance of Points (sensors) and DDC panels (includes SPC, IPC and Expio controllers).
Responsible making MIS report, Kaizen.
Project Summary:
Project : Indira Gandhi International Airport, New Delhi Software used : Honeywell EBI (R400.2), Comfort-point studio, HMI Quick Builder Protocols used : Modbus, BACnet
Client : DIAL-GMR.
Role : HVAC Control Engineer
Educational Qualifications:
Degree Discipline Board/University Name of the
School/College
Year of
Passing
Percentage
BE EEE VTU SJBIT, Bangalore 2016 62
12th PCM CBSE Subhash Public School,
Jharkhand
2011 65
10th - CBSE SSV Mandir, Jharkahnd 2009 84
Technical skills/Technical proficiency:
Hands-on experience on engineering Design (Hardware, software, Graphics) installation and configuration of DDC controllers for BMS project.
Experienced in Honeywell WEBs, EBI and Control Trends.
Experience in Operation & Maintenance of BMS System (Honeywell).
Knowledge of commissioning and installation of BMS/IBMS systems for Honeywell building control product.
Hands on experience on Auto CAD.
Knowledge in programming and setup of PLC, SCADA and monitoring system.
PLC (Schneider Electric, OMRON, DELTA, Siemens, ABB, GE, Allen Bradley)
SCADA/HMI (IFIX, Citect, WINCC, INTOUCH, Rockwell Automation)
PAC (Schneider Electric),VFD(Schneider Electric, ABB, Danfoss), ISPW, MCC Panel
Pneumatics & Field Instruments
Knowledge about Networking, Server, Network Switch, Router, Protocols, LAN, WAN installation and configuration.
Basic knowledge of C
Practical experience with MS office including outlook,Word, PowerPoint, MS-Excel
Certifications
Post Graduate Diploma in Industrial Automation (Trained by SMECLABS).
Sensorics and Servo Drives & Control training at Center of Excellence for training and Research in Automation technologies (CETRET) by REXROTH BOSCH GROUP.
Successfully completed Advance level training on EBI(R500) Honeywell by HONEYWELL AUTOMATION.
Personal details
Date of Birth : 2nd March 1994
Gender : Male
Nationality : Indian
Marital status : Unmarried
Passport number : P9351095
Father’s name : Ramesh Kumar Singh
Languages Known : Hindi, English
Declaration
I hereby declare that all the above information given by me is true to my knowledge and I hold the responsibility of the above mentioned information.
Date:
(Signature)
Place: Kumar Shashank