Ronnie C. Romero
Province: # *** Barangay Mona, Alaminos City, Pangasinan, Philippines, 2404
City Address: Block 6, Lot 3, Yuen St. Phase 7 Bankers Village V, Guitnang Bayan,
San Mateo, Rizal, Philippines, 1850
Mobile Nos.: +63-928-*******
E-mail Add: **************@*****.***
Skype ID: ronnie_romero6
PROFESSIONAL SUMMARY:
Extremely knowledgeable quantity survey works such as Pre-contract (Tendering) & Post contract evaluation of subcontractor claims, variation orders, payment certificates, and cost comparison of quotation, cost analysis of materials, monitoring construction updates on site, procurement package schedules and others.
PROFESSIONAL EXPERIENCE:
Shapoorji Pallonji Middle East LLC.
P.O. Box 118219, Office 101-102 City Bay Business Center
Abu Hail Road, Hor-Al-Anz East, Dubai, United Arab Emirates
Senior Quantity Surveyor – September 05, 2014 – September 06, 2016 (2 years contract)
Rove Hotel Bldg. 15+B+Roof Top – Dubai Inn – Zabeel Site, Dubai, UAE
Rove Hotel Bldg. 15+B+Roof Top - Port Saeed Site, Dubai, UAE
JBR Enhancement Walk & Podium, Dubai, UAE
Landmark HQ Project (30th Storey Bldg.), Dubai Marina, UAE
Amesco Tower Project (48th Storey Bldg.), JLT, Dubai, Marina, UAE
1.Carry out take off for material procurement.
2.Maintain contract documentation and advise on pretender and post contract matters
3.Manage and value variations, maintain documents, drawing, for claim.
4.Preparing the finalization of packages for major materials, comparative statement, of different sub-contractor, complies in the line of BOQ, Drawings, and Specification.
5.Preparation and issue of contractual letters to clients nominated subcontractor and or supplier.
6.Involve in preparation of monthly budget and sub-contractors evaluation & payment certificates.
Contracting and Construction Enterprises LTD. (CCE)
P.O. Box 250991, Riyadh, 11391, K.S.A.
Senior Quantity Surveyor – December 11, 2012 – December 12, 2013
(CITC) - Communicatio Information, Riyadh
(ITCC) Rayadah Investment Company, Riyadh
Running Repair Shed Complex & Heavy Repair Workshop, Al-Khobar
Aramco - Khursaniyah -Tsf Ext.
Satorp - Technip – Civil Works, Jubail
SHeikh Khaled Al-Nabet Villa
Satorp – Operation & Maintenance, Jubail
(DC) Radayah Data Center, Riyadh
Aramco – Satorp - Trainning Center, Jubail
Jerp - Leasing of Portable Office (LPO) SATORP, Jubail
Samsung C & T Corporation, Riyadh
Sadara - LPO/Leasing of Portable Office, Jubail
KAPSARC - RCC Project, Riyadh
Sadara – Staff, Jubail
Flour Arabia – Temporary Facilities Project, Juabail
Sadara - Stream Generation Control Bldg. (SGB)
Sadara - Polyethrene Central Operation Bldg. (COB)
Saudi Railways Organization, Dammam
Tadawul Tower Project, Riyadh
Al Rajhi Tower Project (48th Storey Bldg.), Riyadh
1.Review all contract of the project mentioned above and prepare all payments certificate status report for each project, summarize, analyse and make conclusion, report to executive project director (CCE).
2.Coordinate to all project site QS and gather information regarding cost status report payment certificates, budget cost, procurement cost in preparation for monthly report.
3.Involved in preparing in labour cost loading of Tadawul and Al Rajhi Tower project to be included in the monthly progress reports to be submits consultant and client.
4.Assist in the analysis and negotiation of contractor change orders and claim.
5.Update contract BOQ based on contractors approved shop drawings to submit updated BOQ and expected cost of completion.
6.Review and verify quantities and amounts claimed by sub-contractor in monthly payment request, in accordance with applicable provisions of contract.
7.Collect information required and assist in producing cost report, cash flow reports and other budgeted reports of a certain projects.
Saudi Oger Ltd. GPCD, Estimating, (Architectural Section)
P.O.Box 1449, Riyadh 11431, K.S.A.
Senior Quantity Surveyor – Mar 3, 2008 – October 4, 2011
Project: King Abdullah Road with Tunnel and Underpass, Riyadh
Extension of Old Airport Road, Riyadh
King Saud University with Tunnel and Connecting Bridge, Riyadh
Riyadh University for Women with Tunnel and Link Bridge, Riyadh
King Abdullah Financial District with Connecting Bridge & Tunnels, Riyadh
King Abdul Aziz Medical City, Riyadh
Riyadh Proposed Railways, Riyadh
North Office Park, Riyadh
King Abdullah University for Science and Technology, Jeddah
King Abdullah Golf Course, Riyadh
NAJD School for Boys and Girls, Riyadh
Private Villas, Riyadh
Nasharriyah Palace, Riyadh
King Abdullah Economic City, Riyadh
Burj Al-Oual Development Project, Al-Khobar
Ministry of Interior & Finance, Riyadh
Saraya Aqaba Project - Jordan
Al Khozama Centre, Riyadh
King Abdul Aziz Center of Knowledge and Culture (KACKC) – Dharran
King Faisal Specialist Hospital and Research Center (Riyadh)
King Abdullah International Airport (KAIA) – Jeddah
Raz Az Zawr Residential Village Phase 2 – Raz Az Zawr
Harramain High Speed Railway (HHSR) – Jeddah, Makkah, Medinna & Kaig
King Abdullah International Gardens (KAIG)
King Abdullah Petroleum Studies & Research Center (KAPSARC no.300*******) Saudi Aramco
MOH – Ministry of Health (8 hospital in KSA)
SANG – (Saudi National Guards) Aviation in Khashm Alaan Project
KASC – King Abdullah Sports City, Jeddah KSA
MOI- Ministry of Interior: Emirates Province Center Bldg.
KFSHRC – King Faisal Specialist Hospital Research Center (Extension, Jeddah)
1.Review and check tender drawings, specifications & bill of quantities in preparation for tendering this project.
2.Prepare package comprising drawings, specifications and bill of quantities in soft copy or hard copy for subcontractor
3.Prepare and send request for quotation with package to sub-contractor & suppliers
4.Evaluate and analyze sub-contractors & supplier quotations and billings.
5.Prepare sub-contractors & Suppliers price quotation comparison
6.Prepare queries to client regarding missing item, additional drawings and some clarification for tendering
7.Involves in preparation of comparison analysis of supplier tender and assist manager for selection of subcontractor
8.Monitoring the subcontractor & supplier logbook and make analysis for their quotation and daily report to Saudi Oger International based in France.
Overseas Engineering & Construction Co. Ltd., SA
#5 Ruelle Jeudy, Rohte D’el Aeroport, Port Au Prince, Haiti
Quantity Surveyor – Feb 1, 2006 – May 27, 2006
Project: P17 A Construction of Antoine Simon Airport Access Road
P17 B Construction of Bridge over L Acul River
1.Preparation of daily report for P17A & P17 B regarding their daily site activities, manpower, equipment’s and materials used.
2.Preparation of weekly report with photographs taken on the site as accomplishment and monthly report for submission to Haiti Head Office..
3.Materials quantity take off, ask quotation to suppliers for materials needed based on specifications.
4.Document fillings, prepares client billings, sub-contractors accomplishments and billing reports, and security billings. Other vouchers needed for the 2 projects were also prepared for submission to Haiti Head Office for final approval.
5.Involve on unit cost derivation from bill of quantity such as labour, equipment’s and materials.
6.Monitoring the major supplies on stock and materials for the 2 projects such as diesel, kerosene, cements, re-bar, spare parts for heavy equipment and maintenance of asphalt plants, crusher plant and generator.
7.Determine all additional works and change of orders for the P17 A and prepare necessary documents, plans and pictures for inclusion on claims
Build Masterly System Inc.
Rm. 644 Padilla Delos Reyes, 232 Juan Luna Street, Binondo, Manila
Site Engineer – June 1999 to October 2001
Project: Commercial Building/ Office Renovation
1.Involve in the preparation and estimates of materials of masonry, carpentry, painting and other finishing materials needed.
2.Responsible in the preparation of project work schedules.
3.Supervision of workers and trained them for a better flow of works.
4.Prepare daily activities and progress report.
5.Assist the Project Engineer in the preparation of progress billing regarding additional and variation orders.
6.Perform quantity surveying.
Hanjin Engineering and Construction Co. Ltd.
Site Office: Sitio Bolante, Bgy. San Isidro, Cainta, Rizal
Office Engineer - March, 1998 to March, 1999
Project: MRT Line 2, Package 2&3
1.Prepares and take-off the draft and final estimate of materials (concrete, rebar’s, and form work) and other interface materials that will be use for different types of girder.
2.Summarize and checks the total quantities for materials, which have shown in the bill of quantities.
3.Prepare the necessary files and drawings needed for quotation and example of testing interfacing materials base on the specification.
4.Submit daily accomplishment report and weekly progress schedule.
5.Source out and seek approval of materials submitted in coordination with QA/QC and Cost Engineer.
6.Prepare actual material usage analysis and compare it with budget.
7.Evaluate subcontractor to undertake works considered for being competitive/advantageous to undertake by administration.
8.Ensures that timely progress billing have accurately prepared, evaluated and approved by the consultant and client.
9.Gather and monitor daily accomplishment on operation.
10.Perform quantity surveying.
Asian Construction and Development Corporation
2nd Floor Ajinomoto Bldg., Sen. Gil Puyat Avenue, Makati City
Control Engineer - June, 1997 to March, 1998
Project: Cold Rolling and Coating Plant
Place of Assignment: Steel Corporation of the Philippines, Balayan, Batangas
1Act a member of Project Management Team.
2Assists project manager in preparing project budget and materials.
3Submit copy project and manual to head of Control Department.
4Inform project manager regarding project status, progress and cost performance.
5Prepare of weekly estimation report and monthly report to control department.
6Verify/validate project cost, analyse variance and recommend to Project Manager necessary action to be done.
7Report to Project Manager some potential problems encountered in the site.
8Monitor overall project cost, analyse variance and recommend action to be taken with respect to material cost, labor/rentals, sub-contractors, relevant cost factors and productivity invoices
9Preparations of all necessary documents for project close out.
Muhibbah (M) Engineering Bhd
QS Department, Lot 586, 2nd Mile, Batu Tiga Lama, 41300 Klang, Selangor D.E. Malaysia
Quantity Surveyor/ Civil Engineer - June, 1995 to June, 1997
(Knowledge in different types of tender costing)
1.Quantity take-off the major materials to be used in concreting foundation, drainage, pavement, basin sedimentation tank and other structure in the heavy industrial plant or oil ad gas plant (such as concrete re-bar form work and installation of embed pipe, anchor bolts, sliding plates, vapor barrier control joint, construction joint, expansion joint, isolation joint and non-shrinking joint.
2Prepare of bill of quantities of all materials with specification plans and detail drawing for quotation subject for approval of the Consultant.
3Program and scheduling of the project (Bar chart) weekly in certain area and monitor the progress status of the said project in order to meet certain target date.
4Checks and summarize the quantity on BOQ and compare it to the actual quantity based on the approved drawings.
5Determine and identify all the variation order and additional works that are not included in the contract and prepare all necessary documents, pictures to be included in the claims.
6Determine the type of equipments and quantities including number of manpower needed.
7Determine and calculate the materials of cost production of concrete and operation cost, placing plant.
8Act as safety committee by monitoring and conduct site inspection that all workers are aware and knowledgeable on the safety measures to prevent accident.
Dynamic Planners and Construction Corporation
10th Floor Telecom Plaza Bldg., Sen. Gil Puyat Ave., Makati City
CE Supervisor/Estimator - April 1988 to December 1994
Project: 8 Storey Building Tower Antennas, Shop House, 4 Storey
Commercial Building
1.Prepares, maintain file, copies of as-built plans, shop drawings, specifications, and estimates.
2.Work on estimate of materials needed based on the plans and specifications. Involve in the cost estimates of materials in civil works.
3.Control all requested materials on Civil Works and compare the consumed materials against the total volume of materials is estimate files.
4.Always make an estimate of five (5%) allowable on the total computation of estimate on materials needed as wastage.
5.Preparation of weekly progress accomplishment of sub-contractor’s work by giving percentage amount subtracted from the total amount stated in the contract.
6.Supervise and train workers for a better flow of works.
7.Preparation of weekly progress report, which includes percentage of accomplishment, labor, equipment used and other problems, encountered in the project are needs to be resolved.
8.Check and inspect the levelling of stairs, door jambs, window casement, before concreting as well as spacing of re-bar on columns, beams and slab. Used to give warnings and suspend workers who are absents and not doing their assigned job.
9.Involve on estimate, supervision of workers on plumbing and painting works. Identify some fittings and their sizes for plumbing and painting materials. Exposures on the supervision of waterproofing work and identify wood preservatives (e.g. asphalt w/ 3-ply hot process flinkote, sahara, solignum and other chemical adhesives).
10.Involve on the preparation of planning and scheduling (bar chart) of the project.
Union Glass Industries - Tanza, Cavite
Quality control/line Inspector -April 1987 to September 1987
1Determine broken and defective bottles, which are manufactured. Segregation process of these bottles for recycles from the good unit.
Seminars/Training Attended:
1Seminar Workshop on Concrete Design and Hydraulics for Civil Engineering Students held at the Social hall of national university, Jhocson St. Sampaloc, manila conducted by Philippine Institute of Civil Engineers (PICE) on February 15, 1985.
2Seminar workshop on Structural Design, PERT/CPM, Planning and Scheduling at the Engineering Review Center at the Republic Supermarket Bldg., Sta. Cruz, Manila conducted by Pangkat Inhinyero Sibil (PSI) - March 28 to 30, 1985.
3.Seminar Workshop in Module 1, 40 hours Value Engineering Seminar approved by the Society of American Value Engineers International (Save International) from 17 th - 24 th July 2009 at Riyadh Palace Hotel. Kingdom of Saudi Arabia.
4.Saudi Oger sponsored 18 Hours completed training course for Concrete Technology from July 17 to July 19, 2010 at Saudi Oger Innara Building, Conference Hall, conducted by Knowledge City Management in collaboration with Hariri Canadian University.
5.Saudi Oger sponsored 18 Hours completed training course for Supply Chain from August 10 to August 12, 2010 at Saudi Oger Innara Building, Conference Hall, conducted by Knowledge City Management in collaboration with Hariri Canadian University.
6.Saudi Oger sponsored 24 Hours completed training course for Planning Control using Primavera P6 ver. 7.0 from October 18 to October 25, 2010 at Saudi Oger training course block F.
7.Seminar Workshop in Sage Timberline Estimating & Take Off Project Estimation. Held at White Palace Hotel, Riyadh, and Kingdom of Saudi Arabia, sponsored by SOFIQS (Society of Filipino Surveyors) on September 24, 2010.
Organization Memberships:
1. Philippine Association of Value Engineers (PAVE), KSA chapter, 2009 - Present
2. Society of American Value Engineers International (SAVE International 2009-2010)
3. Society of Filipino Quantity Surveyors (SOFIQS), KSA chapter, 2009 – Present.
Education:
B.S. Civil Engineering (1981 – 1987) - National University, Sampaloc, Manila
Personal:
Age 54 years old
Birthday April 05, 1964
Birthplace Quezon City
Nationality Filipino
Sex Male
Civil Status Married
Health Excellent
Height 167 cm
Weight 88 kg
Other Skills Computer Literate (Windows: Excel, Word, Auto Cad, ERP, SAP)
References:
1Mr. Eun Chong Kim; Construction Manager
MMLRT Line 2 Project; Hanjin Engineering & Construction Co. Ltd.
2 Gan Eng Toh; QS Manager
Muhibbah Engineering; Lot 586, 2nd Mile, Batu Tiga Lama, 41300 Klang, Selangor D.E. Malaysia
3Leo B. Putong; V.P. - Logistic/operation
Asiakonstrukt; Km. 11, Brgy. Mayamot, Antipolo, Rizal
4 Mazzen Najjar; Estimating Department Manager - GPCD
Saudi Oger Ltd.; P.O.Box 1449, Riyadh 11431, K.S.A.
5. Hee Seok, Kim; Commercial Manager (SAMSUNG C & T), Al Rajhi Tower HQ, Project
at 4B + G + 36 - Building - Riyadh, K.S.A., along King Fahad Road, before Azizia Mall, Hyper Panda.
6. Said Karam; Project Manager (CCE – Contracting & Construction Enterprises Ltd.), Al Rajhi Tower HQ, Project at 4B + G + 36 - Building - Riyadh, K.S.A., along King Fahad Road, before Azizia Mall, Hyper Panda.