Availability: Immediately (Project Completed, Currently on Notice Period) Objective

13 years’ experience. I need to get attached to an organization, which guarantees me the potential for significant professional, career growth and ensures commercial success. Apart from that a friendly & conducive workplace environment would be appreciable. Academic Qualification

2005 Done Bachelors in Electronics Engineering (04 Years) from Mehran University of Engineering & Technology Jamshoro Pakistan. Work Experience

Lead E&I Engineer Projects June 2016 –To Present

Descon Engineering LLC- Abu Dhabi, U.A.E (Multinational EPC Company)

(Client: ADNOC Onshore Operation, Formerly Known As -Abu Dhabi Company for Onshore Petroleum Operations Ltd- ADCO)

Lead E&I Engineer Projects, EPC-Tie-In at South East (Package B) Project, Abu Dhabi, UAE under ADCO. ADCO, part of the Abu Dhabi National Oil Company ADNOC, group of companies, is one of the top ten oil producing companies in the world. Descon Engineering has been charged with the EPC works ($170 million USD) on 169 KM of Flow Lines at ASAB, SHAH, & QUSAHWIRA and 76 Well Heads at three onshore oil fields (Shah, Asab, Qusahwira).

Job Responsibilities:

Preparation of Loop check & Functional test folders.

Supervision of construction activities.

Supervision of Calibration, Loop check & Functional test of Well Head Control Panel (Petronash), Electromagnetic Flow Transmitter (Emerson),Pressure Transmitter, Temperature Transmitter, Emergency Shutdown Systems (ESD), Surface Safety Valves (SSV) and Limit Switches, Shunt Down Valves (SDV) and Limit Switches, Pressure Gauges, Temperature Gauges, Flammable Gas Detectors

(XGD),Toxic Gas Detectors (XTGD), Level Transmitters, Fire, Gas Beacons and Sounders, Flame Detectors.

Field calibration of instruments utilizing proper test equipment.

Field Fault Analysis – determines if instrument has failed or if it is a process problem.

Installation, Testing and commissioning of Well Head Control Panel. (PETRONASH).

Ping Test to be carried out between RDS-control room to well side in presence of ADCO representative.

Patch cords, pig tails laying from FOPP (Fiber Optic Patch Panel To Moxa/ OT Converters.

CAT-6 cable laying from Telecom panel to Integration Integrated Control and Safety (ICSS), Ping test/IP net configuration to be carried out from ICSS cabinet to field RTU panel in presence of Yokogawa vendor.

Well graphic generation at RDS (Remote Degassing Station) and CDS (Central Degassing station) to be carried out in presence of Yokogawa Vendor.

ii

Fault analysis of PLC (Programmable Logic Controller, Siemens S7-300, and Yokogawa) & DCS

(Distributed Control System) based systems with control logic modification if required.

Installation. Testing and commissioning of Solar Panels (TSS4U).

Coordination and handling interface with vendors and Client personnel for successful interface and integration of the system.

Thorough knowledge of project engineering and detail design practices.

Installation, Testing and commissioning of chemical injection skid pump motors for ESP well and ESP Wells.

Fault analysis of hard wire relay logic, Motor control circuits, Motor power circuits and common utility / lighting circuits.

Fiber Optic cable laying from control room to well side, including OTDR testing in presence of ADCO representation.

Installation. Testing and commissioning of Electrical Submersible pump (ESP Wells) in presence of ADCO and vendor.

To Plan / schedule and Execute the job of Trench Excavation,Cable Lying, cable testing (3.3KV) XLPE Power Cable including execution, Inspection & Supervision of high voltage underground cable as per drawings & ADCO Standards.

Instrument Cable Schedule, Hydraulic Hook-up Drawings, Process Hook-up Drawings, Instrument Index, Control Junction Box Drawings, Instrument Installation Drawings, Cause & Effect Diagram.

Installation, Precommissioning and commissioning of RTU Panel (YokoGawa) for Gas Lift well and ESP Wells (Siemens PLC and V-monitor PLC), worked with Yokogawa/Siemens/V-monitors Engineers to configure all field signals.

Installation. Testing and Pre-commissioning/Commissioning of Pre-Packed Sacrificial Magnesium Anodes for Buried underground crossings (Oil Wells) and ICCP (Impressed Current Cathodic Protection) for Gas Lift Wells.

Responsible for material take off for the discipline and identify all long dead items.

To discuss / attend meetings with ADCO PMC team to clear ambiguities & project progress Reports.

Controls all non-conformances reports (NCR) and ensure corrective actions are taken, root causes are analyzed, and preventive actions are well placed and communicated.

Studies contract documents and project specifications related to E&I and coordinates with QA Eng/ Officer in preparing project quality plan and follows- up with the Engineering team/client to obtain their approvals.

Responsible for material take off for the discipline and identify all long dead items.

To discuss / attend meetings with ADCO PMC team to clear ambiguities & project progress Reports.

Respects the Company’s health, safety and environment policies and procedures, regulations and objectives as they relate to area of responsibility and ensures that they are effectively implemented.

To supervise site engineers and foreman’s and reporting to Project manager.

Controls all non-conformances reports (NCR) and ensure corrective actions are taken, root causes are analyzed, and preventive actions are well placed and communicated.

Prepares method statements, ITP's (inspection and testing plans) etc., and reviews the material and technical submittals to ensure their compliance with the contract's requirements and best practices, and follow up with the consultant/client to obtain their approvals.

Prepares weekly I monthly reports.

Monitor and Control of Engineering Man hours.

Prepares project handover documentation/deliverables.

Carry out other similar or related duties as and when required.

Making Schedule based on actual site condition and mobilizing Vendors accordingly. iii

Lead Electrical & Instrumentation Engineer (ADCO Approved) May 2014 –To- March 2016 McConnell Dowell (ME) LLC. - Abu Dhabi, U.A.E (Multinational EPC Company)

(Client-Abu Dhabi Company for Onshore Petroleum Operations Ltd-ADCO) Lead Electrical & Instrumentation Engineer (ADCO Approved), Installation of Flow Lines and Well Heads, Habshan Site, Abu Dhabi, UAE under ADCO. ADCO, part of the Abu Dhabi National Oil Company ADNOC, group of companies, is one of the top ten oil producing companies in the world. McConnell Dowell has been charged with the Installation of Flow lines and Well Head works ($150 Million USD). Job Responsibilities:

Engineering drawings & document preparation review & asbuilting.

Supervision of construction activities.

Preparation of Loop check & Functional test folders.

Supervision of Calibration, Loop check & Functional test of Turbine Flow Analyzer(Cameron),Electromagnetic Flow Transmitter (Emerson), Limit Switches for Safety surface valves and Shunt down valves, Level Transmitters for Chemical injection skid, Well Head Control Panel(Sulaiman Petrotech/Proserv/Petronash) & Solar Panels (Sola Pak).

Field calibration of instruments utilizing proper test equipment.

Field Fault Analysis – determines if instrument has failed or if it is a process problem.

Coordination of commissioning activities & line up of instruments.

Maintenance of all instruments after hand over to client if required.

Coordinating vendor activities of product vendors RTU Panels (V-monitors),Solar Panel, Transmitters etc.

Mounting, Calibration & final commissioning of Pressure Transmitters, Temperature Transmitters, Flame Detectors, Toxics Gas Detectors, Gas Alarm Beacons, Gas Alarm Sounders, Fire Alarm Beacons, Fire Alarm Sounders, Emergency Shutdown Systems (ESD), Well Head Control Panel

(Halliburton, Sulaiman Petrotech/Proserv/Petronash),Limit switches For SSV, Pressure Gauges, Temperature Gauges.

Instrument Cable Schedule, Hydraulic Hook-up Drawings, Process Hook-up Drawings, Instrument Index, Control Junction Box Drawings, Instrument Installation Drawings.

Installation and commissioning of Distributed Temperature Sensing (DTS), Downhole monitoring system for monitoring of water Injection wells.

Coordination and handling interface with vendors and Client personnel for successful interface and integration of the system.

Thorough knowledge of project engineering and detail design practices.

Installation. Testing and commissioning of WHCP (Petronash, Proserv and Sulaiman Petrotech).

Installation. Testing and commissioning of chemical injection skid pump motors for ESP oil Well.

Fault analysis of hard wire relay logic, Motor control circuits, Motor power circuits and common utility / lighting circuits.

Installation. Testing and commissioning of Electrical Submersible pump in presence of vendor.

Installation. Testing and Pre-commissioning/Commissioning of Pre-Packed Sacrificial Magnesium Anodes for Buried underground crossings.

Installation and commissioning of V-monitor RTU Panel for ESP oil well, worked with V-monitor Engineers to configure all field signals.

Fault analysis of PLC (Programmable Logic Controller, Siemens S7-300) & DCS (Distributed Control System) based systems with control logic modification if required.

To discuss / attend meetings with ADCO PMC team to clear ambiguities & project progress Reports.

iv

Expediting of all actions relevant to material delivery (comment vendor schedules, close Progress follow-up

Monitor and Control of Engineering Man hours.

Electrical & Instrumentation Engineer (ADCO Approved) Dec 2011 – To-March 2014 PUNJ LLOYD LTD. – Abu Dhabi, U.A.E (Multinational EPC Contractor)

(Client-Abu Dhabi Company for Onshore Petroleum Operations Ltd-ADCO) Electrical & Instrumentation Engineer (ADCO Approved), Construction of Flow Lines & Well Heads, EPC- TIE-In project, Abu Dhabi, UAE under ADCO. ADCO, part of the Abu Dhabi National Oil Company ADNOC, group of companies, is one of the top ten oil producing companies in the world.Punjlloyd has been charged with the EPC works ($360 million USD) on 750 KM of flow lines at SAS and 160 Well Heads at three onshore oil fields(Shah,Asab,Sahil).

Job Responsibilities:

To Plan / schedule and Execute the job of Trench Excavation,Cable Lying, cable testing (3.3KV) XLPE Power Cable including execution, Inspection & Supervision of high voltage underground cable as per drawings & ADCO Standards.

Installation. Testing and commissioning of chemical injection skid pump motors.

Install earthing network near power skid and ESP wellhead area.

Mounting & Testing Local Control Panel, Instrument, Electrical & Fire & Gas Junction boxes as per ADCO Standards.

Field calibration of instrumentation utilizing proper test equipment.

Field Fault Analysis – determines if instrument has failed or if it is a process problem.

Installation, Termination & testing the Control / Instrument & Fire & Gas Cables loops.

Instrument Cable Schedule, Hydraulic Hook-up Drawings, Process Hook-up Drawings, Instrument Index, Control Junction Box Drawings, Instrument Installation Drawings and Cause & Effect Diagram.

Mounting, Calibration & final commissioning of Pressure Transmitters, Temperature Transmitters, Flame Detectors, Toxics Gas Detectors, Gas Alarm Beacons, Gas Alarm Sounders, Fire Alarm Beacons, Fire Alarm Sounders, Emergency Shutdown Systems (ESD), Well Head Control Panels(Halliburton),Limit switches For SSV, Pressure Gauges, Temperature Gauges.

Installation. Testing and commissioning of Well Head Control Panel (Halliburton).

Tubing connection from chemical Injection skid to ESP Well downstream flow line.

Installation and commissioning of Siemens (S7-300) RTU Panel, worked with Siemens Engineers to configure all field signals.

Fault analysis of PLC (Programmable Logic Controller, Siemens S7-300) & DCS (Distributed Control System) based systems with control logic modification if required.

Fault analysis of hard wire relay logic, Motor control circuits, Motor power circuits and common utility / lighting circuits.

Attend weekly meetings with ADCO shah (I/C & Electrical) maintenance engineer to clear ambiguities & site progress reports.

Thorough knowledge of project engineering and detail design practices.

To discuss / attend meetings with ADCO PMC team to clear ambiguities & project progress reports.

Perform close monitoring and review of all the drawings and instruct the design team to make proper changes in the drawings which are not complying with the ADCO standards.

Review drawings and documents and assure that all documents and drawings comply with ADCO standards and specifications.

To follow and review “Quotations" packages with procurement department. v

Be fully aware of the contract, scope of work, budget and schedule for the assigned project.

Choose the vendors in accordance with procurement manager, engineering manager and project manager.

Study of the offers received and clarification with vendors.

Expediting of all actions relevant to documentation (Engineering deliverable, vendors’’ manual

Expediting of all actions relevant to material delivery (comment vendor schedules, close progress follow-up

Performs all relevant loop checks and Updates as built drawings.

To ensure Review/Validate redlines, as-built, Electrical, Instrumentation & F&G documentation is completed and submitted.

Tray work, instrument installation, glanding & termination, RTU panel glanding, JB glanding, Field Instrument Glanding, conduit work, cable lying, branch cable & main cable control to field JB to instrument.

To mobilize/guide/train Engineers, Instrument & Electrical foreman, technicians & Electricians to their respective jobs.

To supervise site engineers and reporting to Project manager.

Implementation of Project Quality Plan and Procedure for the inspection of the installation and testing of instrument.

Issues the relevant Quality Records and when necessary, writes and sends to QC supervisor Non- conformances reports (NCR’s).

Instrument & Control Engineer Jan 2010-To-Oct 2011 M.R Al-Khathlan Co. K.S.A (Leading EPC Contractor) Client: Project for SATORP (Saudi Aramco Total Refining and Petrochemical Company) Jubail Export Refinery Package 5C

EPC (Engineering, Procurement & Construction) project for the auxiliary utilities package of the new grass root Jubail Export Refinery (JER) being built by Saudi Aramco and Total (France) at the Jubail Industrial City 2.

Job Responsibilities:

Installation & commissioning of Switch Racks and pump motors.

To Plan / schedule and Execute the job of Trench Excavation, Cable Lying, cable testing & termination as per drawings & Satorp Standards.

Mounting & Testing Local Control Panels, Instrument Junction boxes as per Satorp Standards.

Installation, Termination & testing the Control / Instrument cables loop.

Mounting, Calibration & final commissioning of Level Transmitters, GWR Transmitters, Level Indicators, Flow switches, Pressure Transmitters, Temperature Transmitters, Pressure Gauges, Control Valve, on-off valve, Safety Valve and analyzers.

Field calibration of instrumentation utilizing proper test equipment.

Field Fault Analysis – determines if instrument has failed or if it is a process problem.

Installation and commissioning of Fire Alarm Control Panel (FACP-Siemens).

Fault analysis of PLC (Programmable Logic Controller, Siemens S7-300) & DCS (Distributed Control System) based systems with control logic modification if required.

Fault analysis of hard wire relay logic, Motor control circuits, Motor power circuits and common Utility / lighting circuits.

To discuss / attend meetings with Satorp PMT team, vendors, design consultant (CZFP) to clear ambiguities & project progress reports.

Thorough knowledge of project engineering and detail design practices. vi

To mobilize/guide/train Instrument foreman, technicians to their respective jobs.

Review drawings and documents and assure that all documents and drawings comply with JER Engineering standards and specifications.

Instrument Cable Schedule, Hydraulic Hook-up Drawings, Process Hook-up Drawings, Instrument Index, Control Junction Box Drawings, Instrument Installation Drawings and Cause & Effect Diagram.

Review MR packages to assure the implementation of JER Engineering Standards and specifications.

To follow and review “Quotations" packages with procurement department.

To supervise site engineers and reporting to construction manager.

Be fully aware of the contract, scope of work, budget and schedule for the assigned project.

To oversee critical equipment installation and to coordinate and arrange appropriate documentation / specialist vendor assistance as required.

To ensure redlines, as-built, Operation and maintenance documentation and to the project completion documentation is completed and submitted.

Actual this project build by Saudi Aramco, so I am Fully Familiar with Saudi Aramco Engineering Standard (SAES), Saudi Aramco material System Specification (SAMSS), and Saudi Aramco Engineering Procedures (SAEPs).

Perform close monitoring and review of all the drawings and instruct the design team to make proper changes in the drawings which are not complying with the SATORP standards.

Shall have to review all submittal packages related to design in order to ensure that all the requirements of SATORP are incorporated in the packages. Assistant Manager E & I Oct 2006-To-Jan 2010

Dewan Cement Ltd-Pakistan (Dewan Mushtaq Group Pakistan) Job Responsibilities:

Re-Vamping of Cement Mill Line-1 from Relay Control Logic to PLC (Siemens PCS7) From IO Listing to Signal Testing and now plant running successfully, worked with Siemens Engineers as a Project Engineer.

Field calibration of instruments utilizing proper test equipment.

Field Fault Analysis – determines if instrument has failed or if it is a process problem

Carry out safe and smooth Plant Operations.

Coordinate between process and maintenance (Electrical, Instrumentation & Mechanical) for rectifying day to day plant problems.

Instrument Cable Schedule, Process Hook-up Drawings, Instrument Index, Control Junction Box Drawings, Instrument Installation Drawings and Cause & Effect Diagrams.

Ensuring timely completion of jobs to minimize production losses.

Responsible for PLC system for Operational Plant (Siemens PCS7).

Fault analysis of PLC (Programmable Logic Controller, Siemens S7-300) & DCS (Distributed Control System) based systems with control logic modification if required.

Fault analysis of hard wire relay logic, Motor control circuits, Motor power circuits and common utility / lighting circuits.

Calibration of Fan Dampers

Shut Down Maintenance Jobs

Daily Instrument & Electrical Inspection.

Worked on Thermocouple, RTDs,Temperature Controller and indicator, Temperature Guages, Electrovalve, Level Sensor and Controller, Flow Switch, Speed Control Sensor, Proximity Sensor, Limit Switches, Belt Scale (Hasler) and Gas Analyzer (Siemens,ABB).

Responsible to Weekly Preventive & Corrective maintenance of Instruments. vii

Trainee Engineer Instrument July 2005-To-Aug 2006

S.G.Fiber Ltd- Pakistan

Job Responsibilities:

Responsible Pre-Commissioning phase of the project covering installation, termination, Meggering, continuity and calibration of pressure transmitter, pressure switch, temperature switch, level indicator, I/P, RTD, TE, monitoring the preparation of instrument calibration.

Inspection of field instrument installation, cable meggering & continuity check, instrument component installation inspection and final commissioning of inst. DCS system. Loop from filed instruments to main console monitoring system, functional testing of all loop, including fire & Gas. Others

Internship in Paknet Limited (A Subsidiary Of Pakistan Telecommunication Company Limited).

Training Of Health and Safety Environment at Work Place from National Institute of Labour Administration Training Pakistan.

Training of H2S and Basic First Aid from Emirates Technical & Safety Development Centre (ETSDC) UAE.

ADCO Confined Space Entry Training from Numero Uno Training & Consulting, Abu Dhabi-UAE Validity: 26-11-2020.

H2S Awareness & Escape (Level 2) From Safety Zone & S Consultancy, Abu Dhabi-UAE, Validity: 14-06-2018.

Successfully Completed ADCO Permit to Work (PTW) Training from GASOS Musaffah, Abu Dhabi- UAE, Validity: 06-12-2020.

Tools of Trade

Simatic Manager, Siemens PCS 7

Summary

Date of Birth: Mar 31, 1981; Marital Status: Married Languages

English (Fluent), Urdu (Fluent), Sindhi (Fluent), Punjabi (native) References

References may be furnished upon request.



Contact this candidate