Resume

Sign in

Electrical Engineer Project

Location:
Lagos, LA, Nigeria
Posted:
April 06, 2018

Contact this candidate

Resume:

OLEABHIELE JOSEPH

ADDRESS: **, ****** ******, *****-******, Ikorodu, Lagos, Nigeria

PHONE NO: 080********, 081********

EMAIL: ac41xg@r.postjobfree.com

PERSONAL DATA:

DATE OF BIRTH: 20th October, 1963

GENDER: Male

MARITAL STATUS: Married

L.G.A: Esan Central

STATE OF ORIGIN: Edo State

NATIONALITY: Nigerian

Summary

I am trained as an electrical, instrumentation and communication engineer. I have worked in many sectors, Including oil and gas, government and private sector. Competent in design, installations, repairs, maintenance and commissioning of electrical, instrumentation and communications equipment / networks, including managing of the above personnel. I have participated actively in these positions in various projects from start to finish including lead electrical engineer. I can work in a challenging environment both in private and public sectors.

Educational Qualification with Date

SCHOOL ATTENDED QUALIFICATIONS OBTAINED DATE

Ambrose Ali University, B. Eng. Elect/Electronics 1994

Ekpoma, Edo State (2rd Class Lower)

Opoji Secondary Commercial West African Examination Council 1985

School, Opoji (WAEC)

Ujoelen Grammar School, West African Examination Council 1984

Ekpoma, Edo State (WAEC)

Membership of Professional Associations:

Member Nigeria Society of Engineers (MNSE) 2006

Member Council for the Regulation of Engineering of Nigeria (COREN) 2017

Member National Electric Power Authority Registered Contractors 2011

Other Training

I.Installation and repair of electrical and communication equipment by national 2011

Electric power authority (NEPA)

II.Installation and repair of PABX/ telephone intercoms network by MEDCON 1996

III.Installation and repair of close circuit television (CCTV)

IV.HSE Awareness/safe practice training

Languages: speaking reading writing

English: Good Good Good

Ishan: Good Good Good

Employment Record

Lagos State University, and Silver Union Ltd,

Contractor Blessed Enos Nig. Ltd

Position Held Lead Electrical Engineer

Date 2017 – Till Date

ExxonMobil Production Nigeria MPN

Contractor: Four-link Nigeria limited

Position Held: Lead Electrical Commissioning Engineer

Date: 2015 – 2016

Silver Union Ltd, Estate Developers

Contractor: Blessed Enos Nig. Ltd

Position Held: Project Manager

Date: 2010 – 2015

Shell Petroleum Development Company (SPDC)

Contractor: Provas Nig. Ltd

Position Held: Lead Communication/Installation Engineer

Date: 2008-2010

Chevron Production Lekki Lagos

Contractor: Rock System Nig. Ltd

Position Held: Lead Electrical Engineer

Date: 2005-2008

Gaslink Nig. Ltd

Contractor: Ose Engineering and Technical Company

Position Held: Installation Engineer

Date: 2000-2005

Nigeria Army and Lagos University teaching Hospital (LUTH)

Contractor: S. I. Okojie and Company

Position Held: Electrical/ instrumentation Engineer

Date: 1999-2000

Petroleum Trust Fund (PTF)

Contractor: African Telecommunication Network

Position Held: Telecom Engineer

Date: 1997-1999

Texaco Nig. Ltd

Contractor: Medcom Nig. Ltd

Position Held: Installation Engineer

Date: 1995-1997

Work Undertaken That Best Illustrate Capability To Handle Task When Assign.

A A

Name of project: QIT Master Plan Project (Dormitories and Utilities Project) Eket Nigeria

Year: 2015 - 2016

Client; ExxonMobil production Nigeria (MPN) Position held:

Position held: Lead Electrical Commissioning Engineer

Main project features: Constructions of ExxonMobil QIT Master Plan Project (Dormitories and Utilities Project) Eket Nigeria

Activities performed: Making improvement to. And offering advice about operational procedures

Scheduling and Coordinating works to tight dead lines

Ensuring that Equipment works to its specification

Creating and carrying out text procedure

Investigating problem, diagnosing and repairing faults

Troubleshooting

Supervising electrical/communication technical staffs

Liaising with installation/project manager

Providing technical support

Writing report and documentation

Ensuring safe working condition

Training maintenance and operative staff where appropriate

B

Name of project : Construction and maintenance of Olabisi Court (Housing Estate)

Year: 2010-2015.

Location: V/Island, Lagos.

Clint: Silver Union Limited (Estate developer)

Main project features: Installation and maintenance of Electrical and communication equipment

Position held: Electrical/communications Engineer

Activities performed: Ensuring that equipment works to its specification

Creating and carrying out test procedure

Supervising Electrical/Communication Engineering Staff

Liaising with installation/project Engineering

Providing technical support

Ensuring Safe working condition

Scheduling and coordinating work to meet dead line

C.

Name of project : Construction of Port Harcourt high Court Complex

Year: 2008.

Location: Port Harcourt.

Client: Rivers State high court

Main project features: Installation of 12 nos, 30 tons of central air Conditional

System

Position held: Lead Electrical Engineer

Activities performed: Ensuring that equipment works to its specification

Creating and carrying out test procedure

Supervising Electrical/Communication Engineering Staff

Liaising with installation/project Engineering

Providing technical support

Ensuring Safe working condition

Scheduling and coordinating work to meet dead line

D.

Name of project : Installation and maintenance of CCTV, PABX and door

Phone

Year: 2008-2010.

Location: Ikoyi/V/Island, Lagos.

Client: Shell Pet. Dev. Company (SPDC) housing Estate

Main project features: Installation and maintenance of CCTV, PABX and door

Phone

Position held: Project Engineer.

Activities performed: Develop project objectives by reviewing project proposals conforming

with the management.

Determine projects responsibilities by identifying project phases and elements.

Assign personal to phases and elements, reviewing bids from contractors.

Determine project specification by studying product design, customer requirements, and performance standards; completing technical studies.

Confirming products performances by designing and conducting test.

Determine project schedule by studying project plan and specifications, calculating time requirement, check inactive project elements.

Maintain project schedule by monitoring project progress, coordinating activities and resolving problems.

Control projects plan by reviewing design specifications and plan and schedule changes: recommending actions.

Control project cost by approving expeditions: administrating contractor contract.

Prepare project status reports. Collecting, analyzing and summarizing information and trends; recommending action.

Maintain safe and clean working environment by enforcing procedures and regulations.

E.

Name of project : Installation of UPS system

Year : 2005,

Location: Lekki Lagos

Client: Chevron Texaco

Main project features: Installation of UPS system

Position held: Electrical Engineer

Activities performed: Installation of Equipment

Ensuring that equipment works to its specification

Creating and carrying out test procedure

Supervising Electrical Engineering Staff

Liaising with installation/project Engineering

Providing technical support

Ensuring Safe working condition

F.

Name of Project: Installation and Maintenance of Electrical and Telecommunication Network in Gaslink Nig. Ltd. Head office and above the ground Installations.

Year: 2000 – 2005

Location: Ikeja-Lagos.

Client: Gaslink Nig. Ltd.

Main Project: Installation and Maintenance of Electrical and Telecommunication Network in Gaslink Nig. Ltd. Head office and above the ground Installations.

Position Held: Electrical / Telecom Engineer.

Activities Performed: Installation of electrical and telecommunication equipment

Maintain and repair of electrical and telecommunication equipment.

Ensuring that equipment works to its specification

Creating and carrying out test procedure

Supervising Electrical/Communication Engineering Staff

Liaising with installation/project Engineering

Providing technical support

Ensuring Safe working

G.

Name of project: Installation of PABX in Texaco Nig. Apapa

Year : 1996-1997

Location: Apapa- Lagos

Client: Texaco Nig. Apapa

Main project features: Installation of PABX in Texaco Nig. Apapa

Position held: Installation Engineer

Activities performed: Installation of Equipment

Ensuring that equipment works to its specification

REFEREES

1.Jude Wilson Okoebor

Four-link Nig. ltd. Port-Harcourt,

Rivers State

080********

2.Gregory Aifobhor

Ambrose Alli University, Ekpoma

Edo State

080********

3.Mrs. J. I. Akioya

Hotel De Equity Benin City,

Edo State

080********



Contact this candidate