Resume

Sign in

Electrical Engineer Power Plant

Location:
Lagos, LA, Nigeria
Salary:
100,000 to 150000
Posted:
April 03, 2018

Contact this candidate

Resume:

OBOAGWINA, JOSHUA OMOZOJIE

Residential Address: */3, Assembly close, Fola-agoro, Shomolu, Lagos state. Phone: +234**********, +234**********

E-mail: ac40pe@r.postjobfree.com

Gender: Male Date of Birth: 28th May, 1989 State of Origin: Edo CAREER OBJECTIVE

Exceptionally creative and resourceful Electrical Engineer with good work ethics and technical skills necessary for engineering innovative designs seeking an opportunity to learn more and contribute to the most core area of Electrical Industry

CORE COMPETENCES

Solid understanding of electrical engineering theory, industry-standard circuit design and its applications

Versatile in the use of MS word, excel, AUTOCAD and Microsoft packages

Good communication skills

Superior proficiency in controller design and repair EDUCATION

2007 – 2012 Electrical and Electronic Engineering (Second Class Lower Division) Olabisi Onabanjo University, Ago Iwoye, Ogun State. 1999 - 2006 Senior Secondary School (WASSCE)

Evangel College and Leeland College, Lagos state.

1993 -1999 Primary School leaving Certificate

Harrobs Private School, Ketu, Lagos State.

OTHER CERTIFICATES

2014 National Youth Service Corps (NYSC).

2014 Certified in Health and Safety competence development training Level 3(Institute of Safety Professionals Nigeria)

WORK EXPERIENCE

MIKANO INTERNATIONAL LTD, ACME ROAD, OGBA, LAGOS. December 2016- Till Date Electrical Store Supervisor

Reception all ABB Oversea and Local Purchase

Rising of Production Advise for ABB Gear Switches and ABB Change Over Panels of different Current rating

Issuing all ABB, Schneider, Philips and Raychem sales

Rising of returns for items/Products from Costumers voucher

Verification of all ABB returned items/products from other Warehouse and from costumers.

Maintaining proper warehouse arrangement

Conducting Inventory and reporting Inventory outcome

Maintaining proper documentation and filing of all transaction

Issuing of ABB products/Items to department and branches

Checking of Minimum Stock level, Maximum stock level and re-order level

Maintaining Safety stock using ERP (Enterprise resource planning software)

Using ERP (Enterprise resource planning software) application to monitor stock level and post stock card.

HFGC ENERGY & POWER SOLUTION LTD, SHOGUNLE, LAGOS. March 2016-November 2016 Electrical Technician

Fabrication of synchronization panel, distribution panel, power factor, correction panel, Star-Delta and DOL panel

Control configuration of Air Circuit Breaker in synchronization and distribution panel.

Provide technical support to operations staff

Visit sites to ensure all safety rules and regulations are strictly adhered to at all times

Preparation of site visit reports

Assist in daily terminal operations

Hazardous area classification – knowledge of the different protection concept for field instrumentation SHORELINE POWER COMPANY LTD, LAGOS Sept 2014 –February 2016 Shift Operations Engineer (Power System Control of Gas Engine Generators & Taurus 60 Dual fuel turbines). Site Operations: LAFARGE CEMENT Sagamu plant

Operations and Maintenance of 6units x 1.364MW (Deutz) MWM Gas Engines, 3units x 5.643MW Gas Turbines, Atlas Copco Air Compressors (2 x 11KW).

SCADA (Supervisory Control and Data Acquisition) and PLC (Siemens Programmable Logic Controller) System of Operation from control room screen monitor start-up of gen sets, Load step/management loading of synchronized gas gensets.

Evaluate/witness engine test runs and provide detailed calculations and reports consistent with Company standards

Computations of the average generated power, consumed power, gas consumption etc. on a daily basis.

Carry out regular inspection, repairs and complete overhauling of the MWM gas powered generators.

Join other Engineers in E10 - E50 scope of maintenance practice inclusive of sparkplug changing, filters changing, separators replacement, insertion of primary gas filters, alternator greasing etc.

Control and maintain auxiliary equipment, such as pumps, fans, compressors, filters, and supply water, fuel, lubricants, air, and auxiliary power.

Take readings from meters and gauges at established intervals, and take corrective steps as necessary.

Alarm acknowledgement and faults rectification on the plant through the Total Electronic Management

(TEM) and the Multi-functional Relay (MFR) systems.

Ensure that Power Plant is operated and maintained as per safe operating standards

Ensure that safety and health rules are strictly adhered to at all times HFGC ENERGY & POWER SOLUTION LTD, SHOGUNLE, LAGOS. 2012 Electrical Engineer (Industrial trainee)

Projects/Work done: Construction of Automatic Mains Failure (AMF), construction and design of Distribution panel, Construction of power factor correction panel with the aid of AutoCAD software. LEADERSHIP ROLE

National Youth Service Corps 2014

Information and Communications Technology (CDS group) Post: Vice president

Responsible for organizational directions and goal attachment as people leader

Demonstrate flexibility to work well with people of different backgrounds, willingness to learn in a competitive time frame and the credibility of a strong relationship skill to deliver is within reach HOBBIES

Reading, Travelling, Chess and Drama

REFEREES

Details of referees will be available upon request



Contact this candidate