FERDINAND V. POTENCIANO
Mobile nos. +639**-***-****; +639**-***-****
Email: *******************@*****.***
JOB OBJECTIVE:
I AIM TO OBTAIN THE POSITION IN A RESPECTABLE FIRM WHERE I CAN FULLY UTILIZE MY SKILLS IN TESTING/COMMISSIONING AND INSTALLATION OF GSM, 3G, 4G AND 4GE1 TRANSMISSION EQUIPMENT OR ANY SIMILAR TELECOMMUNICATION EQUIPMENT FOR THE BENEFIT OF THE FIRM.
TRAINING:
POWER PLANT OPERATOR (GENERATOR) TRAINING
Conducted by Builders Technical Services
Trade Test and Training Center
Quezon City, Philippines
February 13, 1995
WORK EXPERIENCES:
KAUST NETWORK INFRASTRUCTURE (Jeddah K.S.A.)
Inspector, for the Structured Cabling and Outside Plant.
January 18, 2009 to June 26, 2010
(Under the Saudi Inteltec project)
Job Description:
To check for the proper layout base on the
Standard .
To check for the position/layout of the Data
Cable.
To check for the proper way of testing and
Commissioning of the Data cable .
To check the equipment (Fluke) to use for
Testing if upgraded.
Inspection/ Check if the the communication
Room is base on the standard and supply by
Air-conditioned and fully equipped.
WORK EXPERIENCES:
SAUDI INTELTEC COMPANY (K. S.A.)
Telecom Technician
NOKIA Project
May 08, 2003 to January 22, 2017
Job Description:
Testing and commissioning of Nokia Flexi hopper Microwave Radio.
Installation of Nokia Microwave Radio Indoor and Outdoor Unit.
Perform (CWO) circuit work order of E1 Link from BSC to far end site.
Perform troubleshooting if there’s a trouble in the site if necessary.
Perform site survey for the new site and new link of Microwave and BTS.
Cabinet installation Nokia BSC3i and Cabinet Nokia Transcoder.
Perform BTS site installation and cable termination according to site standard.
Company Representative of Ericsson Mini Link Training for Testing and commissioning last October 02-07, 2004.
Assigned in site survey and installation of Ericsson 3G equipment in Bahrain Batelco last November 2006 to November 2007.
ADEED TRADING COMPANY (RIYADH, K.S.A.)
Telecom Technician/ Installer
November 01, 2001 to February 02, 2003
Subcontractor of EXI Telecom
* Nokia Project Western Region and Cisco Data Network Project
Job Description:
Installation of Nokia ultra site GSM Base Station including E1 physical connection between RBS Cabinet and cabling configuration.
Installation of Andrew antennas, feeder cables, jumpers (indoor/outdoor)
Fixing of Andrew connectors using F4PNM for jumpers and L5PNM for feeder cables.
Install grounding system and surge arrestor or lightning arrestor.
Involved in swapping/cut over requesting down time from existing BTS to Nokia ultra site BTS.
Involved in CISCO Data Network Installation System such as network processing engine 7200 series VXR.
Installation of power wiring from CISCO power router to ODF (Optical Digital Frame) to CBX 500 Lucent to ODF going to NORTEL system and connectivity to dixi panel going to other exchange.
* EXI Telecom Saudi Arabia Ltd. – Ericsson Project (GSME5)
Job Description:
INDOOR INSTALLATION:
Transmission Cabinet
Rectifier Cabinet
RBS 900 and 1800
Battery Rack
Laying and termination of power cable from RBS to rectifier assigned magazine.
Termination of power cable from transmission to rectifier
Termination of AC cable to rectifier
Termination of DC cable
Laying of E1 cable from RBS to transmission
Termination of alarm cable from DF to RBS
Termination of alarm cable from building alarm terminal box (BATB) to rectifier
Laying of grounding cable
OUTDOOR INSTALLATION:
Battery and cable installation
Feeder cable and connectors and GSM antenna installation with azimuth orientation
Grounding system
Mini-link Unit, microwave antenna and switch multiplexer unit (SMU) installation
Testing of frequency and distance to fault using the Anritsu site master
Installation of coaxial cable connectors
Alignment (Panning) and testing of mini-link microwave antenna using software configuration and getting the desired automatic gain control (AGC)
AL WASAT TRADING & CONTRACTING EST.
Electrical and Telecommunication Network
(Subcontractor of Lucent Technologies Int’l Saudi Arabia)
LUCENT TECHNOLOGIES INTERNATIONAL (RIYADH, K.S.A.)
GSM/Transmission Technician
DMW-ISP Department
August 07, 1997 – February 29, 2000
Job Description:
Supervised the work operation of cable assembly and termination which fit in the lay frame of ISM DIXI DACS VSDH Batteries and Station alarms.
Assists engineers in the installation/repair, cabling and wiring of radios, multiplexers, and other telecommunication equipment.
Installation of NERA radio and testing.
Accountable for grounding system, antenna system, and power equipment in accordance with applicable engineering standards and practices.
Ensure that the installation of equipments was based on standards and specifications.
Lacing of grounding and power supply cables.
Test locally all wirings and equipment installed prior to cut-over.
Installation of transmission lines, rack and cable runaway, Main Distribution Frame (MDF), Digital Distribution Frame (DDF) and other equipment shelf and accessories.
Coordinates with other technicians and engineers for technical support.
HARRIS Microwave, ODU/IDU installation, RG8 cabling, termination connector and panning.
I-MAN CO COMPANY (RIYADH, K.S.A.)
SAUDI TELEPHONE COMPANY (STC)
Power Plant Operator
Maintenance Department
March 13, 1995 – March 12, 1997
Job Description:
Perform routine inspection of AC window type and chiller
Conduct periodic preventive, corrective maintenance and adjustments of all types of generator.
Provides assistance in major troubleshooting and analysis of alarms.
Perform wiring and/or reconfiguration of circuitry in the event activation or deactivation/rerouting.
Checking of all room if the temperature is going down/higher level, especially the room that there is equipment.
PERSONAL DETAILS:
Date of Birth : February 25, 1970
Present Address : #043 Purok 1, Del Pilar, Castillejos, Zambales
Sex : Male
Civil Status : Annulled
Citizenship : Filipino
Height : 5’ 2”
Weight : 160 lbs
Religion : Christian
Languages Spoken : English, Tagalog and Arabic
EDUCATIONAL BACKGROUND:
High School : St. Nicholas Academy
Castillejos, Zambales
March 27, 1987
Elementary : Villaflor Elementary School
Castillejos, Zambales
April 04, 1983