Post Job Free
Sign in

Power Plant Project

Location:
Philippines
Salary:
7,000.00sr
Posted:
January 10, 2018

Contact this candidate

Resume:

FERDINAND V. POTENCIANO

Mobile nos. +639**-***-****; +639**-***-****

Email: *******************@*****.***

JOB OBJECTIVE:

I AIM TO OBTAIN THE POSITION IN A RESPECTABLE FIRM WHERE I CAN FULLY UTILIZE MY SKILLS IN TESTING/COMMISSIONING AND INSTALLATION OF GSM, 3G, 4G AND 4GE1 TRANSMISSION EQUIPMENT OR ANY SIMILAR TELECOMMUNICATION EQUIPMENT FOR THE BENEFIT OF THE FIRM.

TRAINING:

POWER PLANT OPERATOR (GENERATOR) TRAINING

Conducted by Builders Technical Services

Trade Test and Training Center

Quezon City, Philippines

February 13, 1995

WORK EXPERIENCES:

KAUST NETWORK INFRASTRUCTURE (Jeddah K.S.A.)

Inspector, for the Structured Cabling and Outside Plant.

January 18, 2009 to June 26, 2010

(Under the Saudi Inteltec project)

Job Description:

To check for the proper layout base on the

Standard .

To check for the position/layout of the Data

Cable.

To check for the proper way of testing and

Commissioning of the Data cable .

To check the equipment (Fluke) to use for

Testing if upgraded.

Inspection/ Check if the the communication

Room is base on the standard and supply by

Air-conditioned and fully equipped.

WORK EXPERIENCES:

SAUDI INTELTEC COMPANY (K. S.A.)

Telecom Technician

NOKIA Project

May 08, 2003 to January 22, 2017

Job Description:

Testing and commissioning of Nokia Flexi hopper Microwave Radio.

Installation of Nokia Microwave Radio Indoor and Outdoor Unit.

Perform (CWO) circuit work order of E1 Link from BSC to far end site.

Perform troubleshooting if there’s a trouble in the site if necessary.

Perform site survey for the new site and new link of Microwave and BTS.

Cabinet installation Nokia BSC3i and Cabinet Nokia Transcoder.

Perform BTS site installation and cable termination according to site standard.

Company Representative of Ericsson Mini Link Training for Testing and commissioning last October 02-07, 2004.

Assigned in site survey and installation of Ericsson 3G equipment in Bahrain Batelco last November 2006 to November 2007.

ADEED TRADING COMPANY (RIYADH, K.S.A.)

Telecom Technician/ Installer

November 01, 2001 to February 02, 2003

Subcontractor of EXI Telecom

* Nokia Project Western Region and Cisco Data Network Project

Job Description:

Installation of Nokia ultra site GSM Base Station including E1 physical connection between RBS Cabinet and cabling configuration.

Installation of Andrew antennas, feeder cables, jumpers (indoor/outdoor)

Fixing of Andrew connectors using F4PNM for jumpers and L5PNM for feeder cables.

Install grounding system and surge arrestor or lightning arrestor.

Involved in swapping/cut over requesting down time from existing BTS to Nokia ultra site BTS.

Involved in CISCO Data Network Installation System such as network processing engine 7200 series VXR.

Installation of power wiring from CISCO power router to ODF (Optical Digital Frame) to CBX 500 Lucent to ODF going to NORTEL system and connectivity to dixi panel going to other exchange.

* EXI Telecom Saudi Arabia Ltd. – Ericsson Project (GSME5)

Job Description:

INDOOR INSTALLATION:

Transmission Cabinet

Rectifier Cabinet

RBS 900 and 1800

Battery Rack

Laying and termination of power cable from RBS to rectifier assigned magazine.

Termination of power cable from transmission to rectifier

Termination of AC cable to rectifier

Termination of DC cable

Laying of E1 cable from RBS to transmission

Termination of alarm cable from DF to RBS

Termination of alarm cable from building alarm terminal box (BATB) to rectifier

Laying of grounding cable

OUTDOOR INSTALLATION:

Battery and cable installation

Feeder cable and connectors and GSM antenna installation with azimuth orientation

Grounding system

Mini-link Unit, microwave antenna and switch multiplexer unit (SMU) installation

Testing of frequency and distance to fault using the Anritsu site master

Installation of coaxial cable connectors

Alignment (Panning) and testing of mini-link microwave antenna using software configuration and getting the desired automatic gain control (AGC)

AL WASAT TRADING & CONTRACTING EST.

Electrical and Telecommunication Network

(Subcontractor of Lucent Technologies Int’l Saudi Arabia)

LUCENT TECHNOLOGIES INTERNATIONAL (RIYADH, K.S.A.)

GSM/Transmission Technician

DMW-ISP Department

August 07, 1997 – February 29, 2000

Job Description:

Supervised the work operation of cable assembly and termination which fit in the lay frame of ISM DIXI DACS VSDH Batteries and Station alarms.

Assists engineers in the installation/repair, cabling and wiring of radios, multiplexers, and other telecommunication equipment.

Installation of NERA radio and testing.

Accountable for grounding system, antenna system, and power equipment in accordance with applicable engineering standards and practices.

Ensure that the installation of equipments was based on standards and specifications.

Lacing of grounding and power supply cables.

Test locally all wirings and equipment installed prior to cut-over.

Installation of transmission lines, rack and cable runaway, Main Distribution Frame (MDF), Digital Distribution Frame (DDF) and other equipment shelf and accessories.

Coordinates with other technicians and engineers for technical support.

HARRIS Microwave, ODU/IDU installation, RG8 cabling, termination connector and panning.

I-MAN CO COMPANY (RIYADH, K.S.A.)

SAUDI TELEPHONE COMPANY (STC)

Power Plant Operator

Maintenance Department

March 13, 1995 – March 12, 1997

Job Description:

Perform routine inspection of AC window type and chiller

Conduct periodic preventive, corrective maintenance and adjustments of all types of generator.

Provides assistance in major troubleshooting and analysis of alarms.

Perform wiring and/or reconfiguration of circuitry in the event activation or deactivation/rerouting.

Checking of all room if the temperature is going down/higher level, especially the room that there is equipment.

PERSONAL DETAILS:

Date of Birth : February 25, 1970

Present Address : #043 Purok 1, Del Pilar, Castillejos, Zambales

Sex : Male

Civil Status : Annulled

Citizenship : Filipino

Height : 5’ 2”

Weight : 160 lbs

Religion : Christian

Languages Spoken : English, Tagalog and Arabic

EDUCATIONAL BACKGROUND:

High School : St. Nicholas Academy

Castillejos, Zambales

March 27, 1987

Elementary : Villaflor Elementary School

Castillejos, Zambales

April 04, 1983



Contact this candidate