Curriculum vitae (CV)
Designation Electrical & Control Technician
Name Elsayed Mohamed Abdel Aal Elghandor
Marital Status Married
Nationality Egyptian
Age 32 Years
Date of Birth 01-02-1986
Place of Birth El-Shaqyah
Military Service Finished
Address Al-Khadda Camp, Building no.186, Road no.105, Block -1 (Mahboola)
Email address ac3z9y@r.postjobfree.com
Contact Number 965-********
Education:
Institute : Technical Industrial Institute
Degree Intermediate Diploma
Section Electrical Equipment Maintenance
Graduation Year : 2003-2004
Entire Grade : good
Languages:
Native Language : Arabic
Foreign Language : English
Computer Knowledge:
Familiar with Microsoft Office.
Training and Courses:
Chemical Hazards Communication, Driver Safety, Electrical Arc Flash Safety, Emergency Preparedness Plan Guideline Training, Eye and Face Protection, Fire Extinguisher Usage, Hot work Program, Honeywell Alcohol and Drug Policy, Ladder Safety Awareness, Machine Safe Guarding, Respiratory Protection and Safe Electrical Work Practices
Previous Experiences:
Projects Performed at Al-Khadda International
Worked as an Electrical & Control Technician in below mentioned projects
Dated from Sept-2014 to till
Project Name New pipeline HP 16’’
Position Electrical & Control Technician
Company Combined Group Contracting Company (Sub-Contract Project)
Client KOC
Period Sept-2015 to Till Present
Project Name GC-106
Position : Electrical & Control Technician
Company Hyundai Engineering & Construction (Supply)
Client KOC & KNPC
Period Sept-2014 to Agust-2015
Work Responsibilities:
Prepare the work permit for the site jobs.
Monitoring the safety issues and make sure that the team is following the site instruction.
Participating in day to day activities regarding work.
Preparation of the require materials for the jobs.
Drawing studying and explaining to subordinate.
Perform lock out and tag out procedures.
Supervising the conduction of cable laying, glanding and termination of power and control cables.
Installation of panel, fitting of cable tray, conduit works, fitting of junction box.
Laying glanding and termination of all type of power and control cable.
Test, assemble, and install electronic wiring, equipment, appliances, apparatus or fixture.
Perform lock out and tag out procedures.
Operate and use testing equipment
Conduct function tests
Dated from May-2007 to Feb-2008
Association Name : Independent work
Profession Name : Electrical & Control Technician
Work Location Kuwait
Projects Performed at Honeywell
Joined as technician to work with project team in executing the awarded projects that included DCS and ESD systems.
Dated from March-2008 to Aug-2014
Project Name Heater & Boiler-Upgrading
Position Electrical & Control Technician
Client KNPC Shuaiba Refinery
Project Name ROIV
Position Electrical & Control Technician
Client KNPC Shuaiba Refinery
Project Name CB/1060 & CB/1062-Upgrading of existing DCS/ESD
Position Electrical & Control Technical Supervisor
Client KNPC Mina Abdullah Refinery
Project Name New Hydrogen Compressor Project
Position Electrical & Control Technical Supervisor
Client KNPC Mina Abdullah Refinery
Project Name Upgrade of existing control system in FUP CCR with associated
Accessories (WS#3 shutdown)
Position : Electrical & Control Technical Supervisor
Client KNPC MAA Refinery
Project Name Olefins II (OL2K)
Position Electrical & Control Supervisor
Client Equate Petrochemicals Company
Work Responsibilities:
Prepare the work permit for the site jobs
Monitoring the safety issues and make sure that the team is following the site instruction
DCS & Marshaling System Panel Assembling
Install DCS/ESD (Honeywell HPM/FSC)system and marshaling cabinets
Lay the pre-fabricated/patch cable between the system cabinets and marshaling termination
Pre-power up check activities and report the find out the concerned Engineer
FAT,SAT and Commissioning Activities
Perform the loop checkup from marshaling cabinet up to the DCS station (Honeywell MMI)
Preparation of cables and ferrules according to the engineering inputs using automated software
Inter-panel wiring/Field wiring/Cabling and Termination
If required to do the loop checkup from field to junction box
Close out the project and clear the punch list if any
The above information furnished is correct to the best of my knowledge and belief.