Post Job Free
Sign in

Engineer Electrical

Location:
DL, India
Posted:
January 08, 2018

Contact this candidate

Resume:

Pradesh G. Raut

(Electrical Engineer)

Current Address – WZ-26, Gujral Niwas, Chhatriwala Park, Subhash Nagar, New Delhi-110018 Email ID – *******.****@***********.***, Contact no-91-801******* / 897-***-****

Career Objective

Seeking a position to utilize my skills and abilities in co-operate that offers professional growth while being resourceful, innovative, and flexible. Always love to have challenging environment with right team spirit .

Personal Strength:

Willingness to learn, creative, professional attitude and ability to perform under tight schedules. .

Work Experience: 6.1 yrs

BSES Rajdhani Power Ltd Delhi ( Joint Venture of Reliance Infrastructure & Delhi Distribution Board )

Designation: Assistant Manager

Duration of job: From 18 May 15 to Till date .

Roles & Responsibility :

Maintenance of 11 KV Ht Network & 440 V LT network .

Switchgears Protection & Maintenance Like ACB, RMU, G.O Set, D.O Set.

MOG connection in transformer .

Capacitor Bank installation .

Transformer Erection & Maintenance Work .

New Network Erection & Maintenance .

Attaining cable Fault & Cable Jointing Work of Both HT & LT .

Loss Reduction activities like chemical jointing and heat srink jointing, Meter Relocation, Meter Change in high loss area in focus Tagore Garden division of BRPL .

Team member of DT Analytics team from Tagore Garden Division in which to save our transformer from failure .

Attaining HT breakdown .

Handling AMC Manpower approximate 30 numbers team

Recovery as well as disconnection of Non payment of bill consumers .

Handling public resistance in high loss area .

Achievement:

Reduced breakdown, Cable fault, NCC and loss level (From 13.2 % to 6.04 %) Nagar Sub division . Also I have selected in 25 high potential engineer in BRPL

TORRENT POWER LTD in Bhiwandi (Distribution ) Franchising with MAHARASHTRA STATE ELECTRICITY DISTRIBUTION BOARD (MSEB)

Designation: Executive Engineer

Duration of job: 3.5 yrs ( From Jan 12 to May 15 )

Roles & Responsibility :

Working Under 22 KV HT Network :

Manage load of 22 KV ht feeder (Load Shifting & Load balancing ) .

Handling of 22 KV ht feeder like partly restoration of supply using DL,GOD &Tap D.O .

Operating of RMU, Auto-Recloser during time of breakdown and load shifting .

To increase the productivity of Breakdown of 22 kv HT feeder.

Installation of RMU,Auto Recloser, Sactionliser,Wedge Connector,Pan Connector, Tee Connector .

Cable laying or erection of 22KV HT feeder .

Locate fault in underground HT cable by using cable fault locator & HT straight throw Cable Joint .

On Site Transformer Testing, Oil filtration, Thermography of Cable & Line Jumper .

Erection of New 22 KV HT feeder either overhead or underground as per as possible.

Project & Maintenance work of 22 KV overhead network like DL/GOD installation, MVLC Sheet, Pin/Disc insulator replacement, DTC dropper replacement,old &damage conductor replacement, Jumper replacement,hardware new brassing, cross arm replacement, provide bird guard & spice guard on cut point channel. provide guard wire to overhead network. provide Muffing,Earthing & pole no of each and every pole . provide stay wire or pole stud to cut point or dead end pole, maintain sag of overhead 22 KV line.

Line Shifting as per the consumer application .

Worked under LT Network :

Project & Maintenance work of LT overhead and underground network like conductor,jumper, insulator, hardware, channel replacement . provide Muffing,Earthing & pole no of each and every pole,provide stay wire or pole stud to cut point or dead end pole. provide guard wire to overhead network .

Testing of MCB,MCCB & Energy Meter .

Cable laying of LT underground netwok .

Handling of cable fault & chemical joint of cable like SJ12,SJ11,SJ10, S3 etc .

On site Transformer & Faulty Meter testing.

Erection of 50 KVAR capacitor bank for distribution transformer.

Analysis of electrical consumption & consumed demand .

Analysis of Vigilance cases .

Maintain the power consumption report. Of higher complaint DTC.

Making report & analyzing of Fire & Fatal /Non Fatal accidents.

Arranging mass raids (Illegal wires removal programs) & participate in vigilance activities of company.

Trouble shooting consumer complaints & critical technical problems as like voltage fluctuations,breakdowns, shocks, M&R jobs etc.

Arranginging safety meetings to the electricians and suggesting them to maintain safety measures at time of site work.

Achievement:

Wedge connector installation,LT load transfer switch installation, RMU installation.

QUALITY ENGINEERS AND CONTRACTORS, Authorized service provided to Central Railway Mumbai

Designation: Site Supervisor

Duration of job: 6th Month

Project Name : DC to AC conversion (Traction Load)

Roles & Responsibility :

Mast erection, Boom erection, Super mast erection, Cross-Arm Erection, Termination, Load Transmission, Overlap Formation, Extension of Termination, Bracket Erection, Section Insulator Erection .

Academic Qualification:

DEGREE

INSTITUTE / UNIVERSITY

YEAR

%

B.E. ( Electrical )

Mumbai University

2007-11

66

H.S.C

Maharashtra Board

2006-07

71

S.S.C

Maharashtra Board

2004-05

73

Area of interest:

Maintenance in Production company, Facility provided to business related company, Quality control of product & Power Generation,Transmission and Distribution.

Salary Details:

Current CTC : 5.3 Lac p.a

Expected salary :7. 5 to 8 Lac p.a

Personal Details:

D.O.B : 7th March 1990 .

Nationality : Indian .

Sex : Male .

Marital Status : Single .

Language Known : Marathi, Hindi, English.

Hobbies : Reading books,listening music, singing song .

Strengths : Team player, self confidence, problem solving .

PLACE -

DATE - . Pradesh G. Raut



Contact this candidate