Pradesh G. Raut
(Electrical Engineer)
Current Address – WZ-26, Gujral Niwas, Chhatriwala Park, Subhash Nagar, New Delhi-110018 Email ID – *******.****@***********.***, Contact no-91-801******* / 897-***-****
Career Objective
Seeking a position to utilize my skills and abilities in co-operate that offers professional growth while being resourceful, innovative, and flexible. Always love to have challenging environment with right team spirit .
Personal Strength:
Willingness to learn, creative, professional attitude and ability to perform under tight schedules. .
Work Experience: 6.1 yrs
BSES Rajdhani Power Ltd Delhi ( Joint Venture of Reliance Infrastructure & Delhi Distribution Board )
Designation: Assistant Manager
Duration of job: From 18 May 15 to Till date .
Roles & Responsibility :
Maintenance of 11 KV Ht Network & 440 V LT network .
Switchgears Protection & Maintenance Like ACB, RMU, G.O Set, D.O Set.
MOG connection in transformer .
Capacitor Bank installation .
Transformer Erection & Maintenance Work .
New Network Erection & Maintenance .
Attaining cable Fault & Cable Jointing Work of Both HT & LT .
Loss Reduction activities like chemical jointing and heat srink jointing, Meter Relocation, Meter Change in high loss area in focus Tagore Garden division of BRPL .
Team member of DT Analytics team from Tagore Garden Division in which to save our transformer from failure .
Attaining HT breakdown .
Handling AMC Manpower approximate 30 numbers team
Recovery as well as disconnection of Non payment of bill consumers .
Handling public resistance in high loss area .
Achievement:
Reduced breakdown, Cable fault, NCC and loss level (From 13.2 % to 6.04 %) Nagar Sub division . Also I have selected in 25 high potential engineer in BRPL
TORRENT POWER LTD in Bhiwandi (Distribution ) Franchising with MAHARASHTRA STATE ELECTRICITY DISTRIBUTION BOARD (MSEB)
Designation: Executive Engineer
Duration of job: 3.5 yrs ( From Jan 12 to May 15 )
Roles & Responsibility :
Working Under 22 KV HT Network :
Manage load of 22 KV ht feeder (Load Shifting & Load balancing ) .
Handling of 22 KV ht feeder like partly restoration of supply using DL,GOD &Tap D.O .
Operating of RMU, Auto-Recloser during time of breakdown and load shifting .
To increase the productivity of Breakdown of 22 kv HT feeder.
Installation of RMU,Auto Recloser, Sactionliser,Wedge Connector,Pan Connector, Tee Connector .
Cable laying or erection of 22KV HT feeder .
Locate fault in underground HT cable by using cable fault locator & HT straight throw Cable Joint .
On Site Transformer Testing, Oil filtration, Thermography of Cable & Line Jumper .
Erection of New 22 KV HT feeder either overhead or underground as per as possible.
Project & Maintenance work of 22 KV overhead network like DL/GOD installation, MVLC Sheet, Pin/Disc insulator replacement, DTC dropper replacement,old &damage conductor replacement, Jumper replacement,hardware new brassing, cross arm replacement, provide bird guard & spice guard on cut point channel. provide guard wire to overhead network. provide Muffing,Earthing & pole no of each and every pole . provide stay wire or pole stud to cut point or dead end pole, maintain sag of overhead 22 KV line.
Line Shifting as per the consumer application .
Worked under LT Network :
Project & Maintenance work of LT overhead and underground network like conductor,jumper, insulator, hardware, channel replacement . provide Muffing,Earthing & pole no of each and every pole,provide stay wire or pole stud to cut point or dead end pole. provide guard wire to overhead network .
Testing of MCB,MCCB & Energy Meter .
Cable laying of LT underground netwok .
Handling of cable fault & chemical joint of cable like SJ12,SJ11,SJ10, S3 etc .
On site Transformer & Faulty Meter testing.
Erection of 50 KVAR capacitor bank for distribution transformer.
Analysis of electrical consumption & consumed demand .
Analysis of Vigilance cases .
Maintain the power consumption report. Of higher complaint DTC.
Making report & analyzing of Fire & Fatal /Non Fatal accidents.
Arranging mass raids (Illegal wires removal programs) & participate in vigilance activities of company.
Trouble shooting consumer complaints & critical technical problems as like voltage fluctuations,breakdowns, shocks, M&R jobs etc.
Arranginging safety meetings to the electricians and suggesting them to maintain safety measures at time of site work.
Achievement:
Wedge connector installation,LT load transfer switch installation, RMU installation.
QUALITY ENGINEERS AND CONTRACTORS, Authorized service provided to Central Railway Mumbai
Designation: Site Supervisor
Duration of job: 6th Month
Project Name : DC to AC conversion (Traction Load)
Roles & Responsibility :
Mast erection, Boom erection, Super mast erection, Cross-Arm Erection, Termination, Load Transmission, Overlap Formation, Extension of Termination, Bracket Erection, Section Insulator Erection .
Academic Qualification:
DEGREE
INSTITUTE / UNIVERSITY
YEAR
%
B.E. ( Electrical )
Mumbai University
2007-11
66
H.S.C
Maharashtra Board
2006-07
71
S.S.C
Maharashtra Board
2004-05
73
Area of interest:
Maintenance in Production company, Facility provided to business related company, Quality control of product & Power Generation,Transmission and Distribution.
Salary Details:
Current CTC : 5.3 Lac p.a
Expected salary :7. 5 to 8 Lac p.a
Personal Details:
D.O.B : 7th March 1990 .
Nationality : Indian .
Sex : Male .
Marital Status : Single .
Language Known : Marathi, Hindi, English.
Hobbies : Reading books,listening music, singing song .
Strengths : Team player, self confidence, problem solving .
PLACE -
DATE - . Pradesh G. Raut