MICHAELSEN P. DEL ROSARIO
*** *.*. ***** **. Sta Cruz Cruz Cavite City 4100
Mob: +639*********
Email: ********************@*****.***
OBJECTIVE: Seeking job opportunities to grow my knowledge according to my work experience and qualification
WORK EXPERIENCE:
21TH CONSTRUCTION DEVELOPMENT CORPORATION
No. 28 Lot 12 Block 94, R. Papa Avenue corner P. Garcia Street, AFPOVAI, Phase VI, Taguig City
MWSS BNAQ ROW FENCING PROJECT
Norzagaray to San Jose Del Monte City Bulacan
Client: Manila Water Company Inc.
(Finished project)
January 23,2017 up to present (standby to be assign to other project)
Position: Land Surveyor
DUTIES AND RESPONSIBILITIES:
Responsible to all survey works particular in survey layout of property line of ROW (Right Of Way). Quantity progress monitoring of demolition line, excavation line and fence line prior to submittal of WPR (Weekly Progress Report). Defining conflict areas to be highlights in project keyplan for approval of proposal of relocations.
AS built survey of final quantification prior to final as built plan to be attached for final billing and final turn over of project to MANILA WATER CO.INC
Assigned to other company project in case to case basis.
QINGDAO MUNICIPAL CONSTRUCTION GROUP Co.Ltd.
San Lorenzo Ruiz Taytay Rizal Philippines
North and South Pasig Sewerage Project
Main Interceptor Sewerage Network
South Pasig Package 2A
Main Client: Manila Water Company Inc.
May 23, 2016 up to January 21,2017
Position: Land Surveyor
DUTIES AND RESPONSIBILITIES:
Responsible for day to day survey activities in South Pasig Package 2A Project in particular in alignment of underground pipelines elevation prior to pipe laying. Transfer of bench marks, pavements and ground elevation monitoring. As built survey (elevation and position) of sewer manholes prior to turnover to MANILA WATER COMPANY INC.
Doing other task in situational basis particular in worker supervision and site monitoring.
GRIDSCAN
Doha, Qatar
July 14,2014-November 29,2015
Position: Land Surveyor
DUTIES AND RESPONSIBILITIES:
Doing Topographical survey, Earth work, Cutting, Filling and Leveling
Responsible to solve any survey obstruction arising on the project
Supervision of survey team and manage the survey group
Ensure that work is being carried out as per Quality and safety standards
Dealing with sub-contractors and consultants.
Assessment of job site prior to final job quotations
Staff training of new survey staff particular in using total station and GPS.
SURVEY EQUIPMENT USED:
Leica TS06 Plus
Leica Builder
Leica GNSS Base and Rover GPS
Geomax
Some of the latest projects in Qatar that I was involved as a surveyor and/or was hired on daily team-hire basis:
RED LINE NORTH RAIL PROJECT
DOHA, QATAR
Main Conractor: IMPREGILO/SK engineering/GALPAR jointvenure
-setting out of diversion roads and underground pipelines
GOLD LINE RAIL PROJECT
DOHA, QATAR
Main Contractor: ALYSSJ joint venture
-setting out and as built survey of boreholes
RED LINE SOUTH RAIL UNDERGROUND PROJECT
DOHA, QATAR
Main Contractor: QATAR DIAR VINCI CONSTRUCTION
-setting out and as built of under ground pipe line.
RED LINE SOUTH RAIL ELAVATED AND AT-GRADED PROJECT
DOHA, QATAR
Main Contractor: FCC / YUKSEL / ARCHIRODON / PETROSERV
-survey monitoring of precast rail bridge
BO WON LEE CONTRACTING
Jubail, Saudi Arabia
United Nation Compensation Commission Project(UNCC Project)
Coastal remediation Contract (CRC) CRC11 and CRC12
Main Contractor: Pan Environmental Services
April 2013-Febuary 2014 (Project Finished)
Position: Land Surveyor/ Quality Controller
DUTIES AND RESPONSIBILITIES:
As a Land Surveyor:
Responsible for day- to- day survey activities in CRC11 and CRC 12 in particular in setting out and checking of position and sizes of excavation of tidal channel, area BOQ of Aspalt Pavements(AP) excavation and AP decompaction and degrading.
As a Quality Controller:
Responsible for everyday quality inspection in CRC11 and CRC12 construction works in particular in Tidal Channel excavation AP excavation and AP decompaction and degrading.
GENERAL SERVICES OFFICE
Cavite City Hall
July 2010-April 2013
Position: Engineer
DUTIES AND RESPONSIBILITIES:
Responsible for day-to-day GSO tasks in particular in material quantity preparation of estimates.
Re-assigned to engineering department if need particular in land surveying and autocad concern.
Prepares daily reports to be submitted to the immediate officer.
MUSTAFAWI TRADING AND ENGINEERING COMPANY (MTC SURVEYS)
Doha, Qatar
June 2005- Feb. 2010
Position: Land Surveyor
DUTIES AND RESPONSIBILITIES:
Responsible for various survey tasks assigned to me by the chief surveyor (for field operations): In particular topographic surveys, Engineering surveys, setting out (both Engineering and Cadastral Surveys), “As-built” surveys, GPS surveys, control traversing and precise leveling. Field checking(field verification) prior to compilation (by the office surveyor) into final plans.
Prepares daily reports to be submitted to my immediate supervisor (in the case of a team-hire).
SURVEY EQUIPMENT USED:
SOKKIA POWERSET 3010
SOKKIA POWERSET 3020
SOKKIA POWERSET 3030
SOKKIA AUTOMATIC LEVELS
SOKKIA GPS
SOKKIA SET2C
SOKKIA SET3C
TOPCON 750 SERIES
Some of the major projects in Qatar that I was involved as a surveyor and/or was hired on daily team-hire basis:
QATAR GAS 3 AND 4 ONSHORE LNG PROJECT
RAS LAFFAN INDUSTRIAL CITY, QATAR
MAIN CONTRACTOR: Chiyoda Technip Joint Venture
-worked as 3rd Party Engineering Survey
SHELL PEARL GTL PROJECT
RAS LAFFAN INDUSTRIAL CITY, QATAR
MAIN CONTRACTOR: JGC-ME/Kellog Brown & Root International
-worked as 3rd Party Engineering Survey
DOLPHIN ENERGY LTD PROJECT
RAS LAFFAN INDUSTRIAL CITY, QATAR
MAIN CONTRACTOR: JGC-ME
-worked as 3rd Party Engineering Survey
DOHA 2006 ASIAN GAMES OPENING AND CLOSING CEREMONIES
KHALIFA STADIUM, DOHA QATAR
MAIN CONTRACTOR:David ATKINS Enterprise
- Setting out of position of equipment and dance effects of the ceremonies.
DOHA 2006 ASIAN GAMES
QATAR BOWLING CENTER, DOHA
- Topographic Survey for renovation for the Asian games.
DOHA 2006 ASIAN GAMES
KHALIFA STADIUM, DOHA QATAR
- As built survey of Velodrome and water events venue
MUSTAFAWI TRADING AND ENGINEERING COMPANY (MTC SURVEYS)
Doha, Qatar
Feb., 2005- June 2005
Position: Assistant Surveyor (Instrument man)
HEAD QUARTERS NAVAL SHIPYARD
NAVAL SEA SYSTEMS COMMAND, PN
Cavite, Philippines
2002-2004
Position: Engineer I
DUTIES AND RESPONSIBILITIES:
Responsible for production supervision, cost and quantity materials preparation of estimates.
QUALIFICATION:
Bachelor of Science in Industrial Engineering
Computer Literate: Word, Excel, PowerPoint and AutoCAD
With completed 70 hours training of AUTODESK AUTOCAD 2009 w/Color Rendering
EDUCATIONAL BACKGROUND:
COLLEGE:UNIVERSITY OF PERPETUAL HELP RIZAL
LAS PINAS CITY, PHILIPPINES
1997-2002
SECONDARY:CAVITE NATIONAL HIGH SCHOOL
CAVITE CITY, PHILIPPINES
1993-1997
PRIMARY:STA. CRUZ ELEMENTARY SCHOOL
CAVITE CITY, PHILIPPINES
1987-1993
PERSONAL PROFILE:
Date of Birth: June 30, 1980
Place of Birth: Manila, Philippines
Nationality: Filipino
Religion: Roman Catholic
Civil status:Married
Languages Spoken: Filipino (mother tongue) and English