Phone No: 562-***-****
RESUME OF: GEORGE A. PORFIRIO Email: ********@***.***
EDUCATION: Venice High School, Los Angeles CA 1975-1978. Santa Monica Community College 1979-1980
OBJECTIVE: Seeking a position Quality Inspector: First Article, CMM, Final Inspection, etc.
SKILLS AND EXPERIENCE:
First Article Inspection
Blue Print reading
Surface Table Set-ups
Sine Plate
Tools Process Specifications
ANSIY.14.5
Optical Comparator
Sheet Metal
Machined Parts
PROFESSIONAL WORK EXPERIENCE:
07/15-5/17, Klune Industries Inc. North Hollywood CA 818-***-**** H/R
Control Inspector/Final Inspector.
First article thru final process inspection
Inspected machine parts
Stainless steel and aluminum parts
Checked parts according to prints using precision measuring instruments.
10/03-07/15, Various Aerotek Contracts (Marvin Engineering, Airdrome, Ducommun, Pervan Tooling), Torrance, CA
Quality Control Inspector
First article, in-process and final inspection of aerospace machine parts
Inspected sheet metal parts – in-process and final inspection
Inspected parts according to blueprint
Used measuring tools such as micrometers, calipers, and gages
AS 9100 environment
1/06 – 8/10 Robinson Helicopter, Torrance CA
Final Inspector
Final inspection: Inspect Process, Hardness Testing, and prepare package for customer verification.
Receiving Inspection: Verify all outside process, Hardware, Machined and Sheet Metal Details against Purchase Order Requirements.
In-Process Inspection: Perform 1st piece verification prior to production
Final inspection on machined and aluminum parts for Boeing
Receiving Inspection: Inspect Hardware, Sheet Metal Details, and Machined Details
from Out Side Process to Engineering drawings and Specification Requirements.
3/00 - 12/05 True Form Inc. Norwalk CA.
Perform Dimensional 1st Article Report per AS9102 requirements.
In-Process Inspection to Surface Plate Set-up's, CMM, Height Gage, Final Inspection
Inspector Final Article Inspection to Eng. Dwg. Specifications, Customer P.O.Perform Dimensional 1st Article Report per AS9102 requirements. In-Process Inspection .
.
7/95 - 5/99 Metal Research Los Angeles CA.
Inspector
Receiving Inspection: Received and Inspect parts from Out Side process such as
machining, Heat Treatment, Chem.-Film, Anodize, Mag. Inspection, NDT, and Paint per our internal Purchase Order Requirements.
Final Inspection: Perform and Review Package for Source Inspection.
In-Process Inspection: Perform inspection of machined parts, Sheet Metal parts to Engineering Dwg. by using Precision Inspection tooling, Surface table set-up's, C.M.M
Create Dimensional 1st Article Inspection Report per AS9102.
3/92 - 7/95 HI-Temp Forming, Gardena, CA
Inspector
Final Inspection: Inspect to Engineering Dwg. Customer Purchase Order, for Shipment
or Quality Control Source Inspection Requirement.
Receiving Inspection: Perform Inspections on Incoming Hardware, machined details.
And all outside vendor process per our internal Purchase Order.
In-Process Inspection: Perform 1st piece verification, and create a complete Dimensional 1st Article Report to Eng. Dwg.
01/86 -1/92 Neil Aircraft Co. Long Beach, Ca.
Inspector
Final Inspection: Inspect Process, Hardness Testing, and prepare package for
customer verification.
Receiving Inspection: Verify all outside process, Hardware, Machined and Sheet metal
Details against Purchase Order Requirements.
In-Process Inspection: Perform 1st piece verification prior to production.