Gerson D. Cárdenas P.
E-mail: ac3wpi@r.postjobfree.com
C. I. V (College of Engineers of Venezuela) Registration Number: 185.665 Period. Institute. Degree or equivalent.
**** - **** *********** ******* de Venezuela Degree in International Studies 2000 - 2007. Universidad Del Táchira, San Cristóbal. Architect. 1990 - 1997. U.E. Román Valecillos. San Cristóbal. High School Science Graduate. 1986 - 1990. U.E. Román Valecillos, Escuela Básica. Elementary. Summary
Work Experience
Company: Ministerio Para La Educación Universitaria (Higher Education Ministry) / Fundación Misión Sucre. Position: Professional 1 (P1)
Period: From March 2011 until February 2017.
- Inspect the national University Villages and identify the preventive and corrective maintenance requirements.
- Participate in both the elaboration and execution of the preventive and corrective maintenance plan and schedule at all Fundación Misión Sucres’ public spaces.
- Support either the elaboration of preliminary plans of works or the adaptation of projects through the search and systematization of required information.
- Help with the administrative procedures related to payment registrations, annual operation plans, purchases plan, transfers and reports of monthly and quarterly achievements when I am assigned to supporting administrative works in the management. Company: Venezuelan Institution of Scientific Investigations (IVIC) Position: Work Inspector in “Roof substitution at IVIC head office in Higuerote” Period: From February 2011 to May 2011
- Coordinate periods of execution, totals of investments and the work cash flow.
- Design and calculate necessary changes in the project for its good advance adapted to the established budget.
- Dictate guidelines to selected suppliers to achieve a good work advance adapted to established periods.
- Advise the administration of investment resources according to the established cash flow.
- Inspect technically the work execution for it to be performed according to the project specifications.
- Supervise the methods and procedures used in the execution of the works as well as the correct equipment and material. Company: Modular Systems Divida
Position: Business Adviser
Period: From March 2010 to May 2010
- Prepare offers and budgets for clients.
- Design furnishing proposals through detailed plans.
- Redefinition and rectification of measures of spaces mentioned in the contract.
- Represent the organization in fairs and expositions. Company: Capital District Government
Position: Professional Supporting
Period: From October 2009 to February 2010
- Designer, restorer and planner of public spaces.
- Coordination and logistics to execution of plans and restoring proposals, as well as recovery of spaces.
- Proposals and supervisions to intervention of constructions with change of use to be adapted to community’s needs.
- Coordination and distribution of either activities developed by my employees or materials to work execution.
- Organization and production of backing documentation concerning the intervention and construction in spaces. Company: Unispace Equipment Inc.
Position: Projects Coordinator
Period: From February 2008 to October 2009
- Coordination and logistics to furnishing installation (modular systems) in offices throughout the country.
- Consultancy in corporate image and use of modular systems in offices of different clients.
- Design of modular systems for offices.
- Visit the civil works to check their status and guarantee the best state to the furnishing entry.
- Travel to other cities of the country because of assigned projects. Company: Simon Bolívar Center Inc.
Position: Architect II
Period: From November 2007 to January 2008
- Finishings and closings designs; inspection, construction and installation of vertical closings.
- Inspection of works: supervision, control of prices, checking, conformation of valuations, and carrying out of reports concerning installation of fire systems, air conditioners and elevators restoring.
- Coordinate with professionals in charge of civil work and installations. Company: FundaCaracas
Position: Inspector
Period: From November 2007 to October 2008
- Inspection of execution of works concerning consolidation and improvement of accommodations in neighbourhoods located in Caracas.
- Administer the works: supervision, control of prices, checking, conformation of valuations.
- Write reports referring the beginning and ending of the work.
- Activate the turnover in the FundaCaracas administration and management areas. Company: Labeo Architects.
Position: Architect.
Period: From August 2007 to November 2007.
Architectural design, design elements and structural details, design wallcovering, Drawing and design of structural details on project: (National Central Electricity Management). Caracas. Company: Estran Group Inc.
Position: Intern
Period: From October 2005 to May 2006
- Design of textile cover,digitalization of plans and structural details in the projects: Rescarven Private Hospitals, Caracas; Caruachi Square, Puerto Ordaz, Bolívar State; terrace of Alcaldía Mayor Seat, Caracas; terrace of General District Attorney’s Office, Caracas; Universidad de Torreón, México DF, Mexico.
- Perform models to prove the running of those membranes in the mentioned projects
- Perform materials estimates and design of structural details in textile cover projects. Skillfulness
Computing: Advanced management of the following programs: Windows, Office, Corel, Photoshop, Cad Programs, Auto Cad, Vector Works, Scketh up 4, 3d max 6, Blender (animation), Microsoft Project. Technical: Performing of Materials Estimates, Model-Making, Projects, Knowledge about control process and project and civil works monitoring, Inspection and coordination of installation of furnishing for offices. Language: English; intermediate, French; Basic.