Resource Alocator
Time Managment
Risk Managment
Flexibility
Self-motivation,
Communication
Chess Football
Marathon Running
Passion for Technology
Mohamed Saad Elbana
Maintenance and project manager
I’m a self-motivated, creative copywriter with 9 years of maintenance experience,and 4 years of projects experience at a leading FMCG company. I have a bachelor’s degree in Electrical Engineering and strong analytical skills. I have master of business administration [MBA] from Arab academy Deputy Project Manager
01/2015 – Present
Achievements/Tasks / Experiences
Planning, Execute Monitoring and control all organization’s projects.
Cost Control.
Risk management.
Time management.
MEP.
piping systems and fluids
Enthusiasm, Empathy, Competence Ability to Delegate Tasks. Cool Under Pressure. SOFTWARES & PROGRAMMING
SIMATIC Manager - Protool - WIN CC –Wonderware.
SAP Software.
Microsoft Project.
Primavera.
Autocad.
CERTIFICATES
PLC "TIA" Programming level II "ST-PRO2" & Protool (11/2014).
Communication & Soft Skills (2016)
Negotiation skills (2013)
Tetra Pak training for (TBA/8 m/c – Tetracardboard Paker m/c – Tetracap m/c) (2009)
Erca training (Erca yoghurt packaging m/cs) (2014)
Arcil training (Arcil yoghurt packaging m/cs) (2016)
Technical reports course (2015)
Leadership (2016)
PERSONAL PROJECTS
Construction of Aluminum factory for producing aluminum products (3/2015) – (5/2015)
Including factory building, filling(one aluminum injection machine with 3 robots and 800C oven) and Utilities( air compressor, chiller, vent systems).
Construction of Yoghurt plant with a capacity of 42,200 Yogurt cups/h (11/2015) – (06/2016)
Including Factory Building,Filling line (3 machines 42,200 cups/h ), Processing (Pasteurizer 15,000 liters/h - Tanks - Mixer -Homogenizer - Separator - 2 CIP units ), Facilities (Incubator - Quick Cooling - Air Compressor - Boiler - air conditioning - chiller).
Construction of Yogurt plant with a capacity of 3,300 Yoghert cups/h (03/2017) – (05/2017).
Including Factory Building,Filling line (1 machines 3,300 cups/h ), Facilities (Incubator - Quick Cooling - Air Compressor - air conditioning).
Construction of Margarine factory (06/2017) – (07/2017)
With a capacity of 1500 Package/h including the factory construction, filling line (2 machines, processing and utilities. Construction of Plastic factory(bottle and bottle neck (08/2017) – (11/2017)
With 2 production line. one of them is blow molding machine has a capacity 3200 bottle /h and another is plastic injection machine has 7000 neck/h. including the factory construction, filling line (2 machines) and utilities. EDUCATION
Bachelor's degree of Electrical Engineering
Alexandria University, Faculty of Engineering.
(09/2002) – (5/2007) Good(73%)
Master of business administration [MBA] "Project managment track" (04/2015) – (08/2017) Arab Academy for Science, Technology & Maritime Transport “Alexandria"
(04/2015) – (8/2017) GPA(3.9/4)
ACHIEVEMENTS
Increase our team work productivity by 45% (6/2016) – (Present).
Decreasing Malfunction& breakdown time by 30% (1/2017) – (Present).
Decreasing Electrical Power consumption _ With respect to Production_ by 13% (1/2017) – (Present).
Construction Yogurt Plant Which doubled our market share twice (2016).
Improvement Our teamwork's reputation within the organization.