RESUME
Name
Sameh Ahmed Gharib
Nationality
Egyptian
Date of Birth
Feb.16, 1967
Education
B.Sc in Civil Engineering, Zagazig University, Egypt, 1990
Profession
Civil Engineer
Contact Numbers
002***********, 002***********
Email Address
***********@****.***
Experience
25 Years
OBJECTIVE:
To Join a Leading Construction Firm
KEY QUALIFICATIONS:
Plans and manage the mobilization and demobilization of the project
• Participates in steering committee meetings and decisions. Manage claims, schedule performance, delays scope changes and changed conditions
• Responsible for all correspondences with the consultant. Implement company policy and procedures in managing the project’s activities.
• Ensures proper allocation and safekeeping of all company assets in the project
• Follow up the process of procurement with the head office, and logistics of material required
• Conducts periodic meetings with the client and consultant to ensure favorable climate for business. Ensure projects’ quality and safety measures are implemented
• Adhere to submit regular project reports for management and report the management with major issues concerning the project
PROFESSIONAL WORK EXPERIENCE
A-) SAUDI ARABIA (KSA):- FROM 20FEB/2003 up to now
1)Position
CONSLTANT PROJECT ENGINEER ( From Feb 2016 to up to now)
Saudi Engineering International Group
Nature of Work
Construction of new south east 380/33kv BSP S/S # 9054
Extra High Voltage Projects Department for SECO Riyadh Area
The project is consisting of 380 KV GIS Building
33 KV Building
Control Building
Fire Water Pump House
Capacitor Bank
Duct Banks for Commination & Power
Fire Hydrant Trenches
Cost of Project:
S.R 274.3 MILLIONS
PROJECT MANAGER (From Jan 2013 to Dec 2015)
Modern Tasami General Contracting Company
2) Position
CONSTRUCTION OF 5 SCHOOL IN JALMUDAH, PHASE-3 for royal commission in Saudi Arabia
The Project is consisting of 5 Schools.
The structure is reinforced concrete, precast double tee slabs and outside finishing are precast concrete panels.
Job Responsibilities :
Plan Supervise the project. Representing the project to the client.
Oversee the project to ensure the desired result is achieved.
Organizing the various professional people working on a project.
Ensure that the projects objectives will be meet.
Nature of Work
S.R 98 MILLIONS
Cost of Project:
PROJECT MANAGER (From Nov .2009 to Dec 2012)
APTC Company
3) Position
APTEC COMPANY(FACULTY OF AGRICULTURE AT KING FAISAL UNIVERSITY)
Area of the building is 21000 square meters basement and two floor with eight zone
system of structure is Hollow core and double tee slabs outside finishing is precast cladding
Job Responsibilities :
Planning and time management
Preparing shop drawing
Preparing all the change order and variation order
Prepare all requirement from manpower, material, subcontractor’s, suppliers to hand over on time
Nature of work
S.R 120 MILLIONS
Cost of Project:
PROJECT MANAGER (From May 2007 to Oct 2009)
Infrastructure project for Marafiq in Jubail Industrial with HYUNDAI Heavy Industries Co. Ltd
4)Position
Construction and finishing for building :
380 kv GIS building
Sea water intake building
Chlorination building
Full gas building
Cable trenches and shelters
Planning & time management.
Study the Resources Required For The Project
Administer on-site work force and achieve quality of work as specified.
Maintain relationship with customers from inspection to final hand over of the project
Ensure all grievances of the customers and properly attended and coordinate for smooth flow of the work
Nature of work
S.R 100 MILLIONS
Cost of Project:
PROJECT MANAGER (from April 2005 to April 2007)
ABDULAH AL MUTTAWA Company
4-) Position
Construction of ROYAL COMMISION FOR JUBAIL & YANBU Schools in JUBAIL INDUSTRIAL City Maintain relationship with customers from inspction to final hand over of the project
Ensure all grievances of the customers and properly attended and coordinate for smooth flow of the work
Nature of work
S.R S.R 33 MILLIONS
Cost of Project:
PROJECT MANAGER (From Feb. 2003 to March 2005)
CANTERY Company
5-) Position
Construction of Government School with 22 classrooms / 800 students at Jubail Insdustrial City.
Procurement /planning/time management.
Nature of Work
S.R 5 MILLIONS
Cost Of Project:
B)-EGYPT: - From July 1990 up Feb. 2003
PROJECT MANAGER (from Nov 1993 to Dec 1996)
Badran Construction company
Position
Construction & Finishing of 120 Flat Housing in Sharm El-Shaikh
Nature of work
L.E 20 MILLIONS
Cost Of Project:
Construction MANAGER (from Jan 1997 to Aug 1999)
Gulf Steel company
Position
Construction of 50 villa (steel structure) for Workers housing at Gulf village in Sharm El-Shaikh
Nature of Work
Implementation of all project surveying
Surveying using devices (level Machine & theodolite)
Receiving the site empty from any problem
Web budget and work to work excavation and backfill accounts
Implementation of all kinds of shuttering and processing business for receipt
Process inscpection request for submission to the government agency engineer Responsible
Processing and receipt of steel work
Do all acts concrete Active
Supervising the implementation of all acts finishes Active
Supervision,execution all ceramic works - marble - granite - suspended ceilings - installation of metal doors -
Installation of wooden doors paint work - installing marble stairs
prepar all the estimation for steel quantity,concerte,finishing itms,
Job Responsibilities
L.E 150 MILLIONS
Cost Of Project:
Construction MANAGER (from Sept 1999 to Feb 2003)
travco company
Position
Construction & Finishing of Al Fanar hotel (resort) for 600 Rooms & 100 Villas Swimming Pool & Rom Stadium and Landscapes
Nature of Work
L.E 300 MILLIONS
Cost Of Project:
From July 1990 to Oct. 1993
Sit engineer for heliplous company, in Egypt
Position
Infrastructure Project for Chemical Plant
Project
250 millions
Cost
12000 m2 with 16 zone each zone 720 m2
Project Area
Network pipe line :
Drainage network,
200 mm PVC pipe with manholes every 50 linear meter
Irrigation net work,
400 mm PVC – 315 mm – 250 mm – 200 mm – 160 mm – 110 mm …..
Water supply network,
UPVC pipe starting with 400 mm diameter
Firefighting network,
Polyethylene pipe with 200 mm diameter, every 30 meter exit point.
Five under ground water tank :
Two with capacity 10000 cubic meter.
Three with capacity 5000 cubic meter.
Valves room.
Substation.
Asphalt network roads.
All network lines are testing with under pressure 16 bars.
MS Office (Word, Excel, AutoCAD as a user)
Computer Skills
Management of ground Water supplies for urban areas, Chalmer University, Gothenburg Sweden.
Training Course