Electrical Supervisor Oil & Gas
S.SARAVANAKUMAR
+965-******** ac3s4l@r.postjobfree.com www.linkedin.com/in/saravana-s-1310
+ PROFILE + PROJECT MANAGEMENT EXPOSURE
A competent electrical engineer, with a
comprehensive knowledge of designing,
developing and maintaining electrical
systems and components as per required
specifications, focusing on quality, safety,
reliability and sustainability. A consistent
track record of deftly handling projects and
steering them through conceptualization,
detailed designing and implementation,
final testing and handover. My roles have
been multidisciplinary, working closely
across various departments, including
Engineering and Instrumentation Control.
Currently employed with IMCO Engineering
and Construction Co, handling electrical
engineering projects and instrumentation
activities as an additional responsibility.
+ AREAS OF FOCUS
Plan new or modified installations to minimize waste of materials, provide access for future maintenance, and avoid unsightly, hazardous, and unreliable wiring, consistent with specifications and local electrical codes.
Plan wiring and installation of panel boards, equipment and fixtures such as motors, generators, as well as control and distribution apparatus such as switches, relays, and circuit-breaker panels.
Prepare sketches showing location of wiring and equipment, or follow diagrams or blueprints, ensuring that concealed wiring is installed before completion of future walls, ceilings, and flooring.
Measure, cut, bend, thread, assemble, and install electrical conduit. Pull wiring through conduit. Splice wires by stripping insulation from terminal leads, twisting or soldering wires together, and applying tape or terminal caps.
Test continuity of circuit to ensure electrical compatibility and safety of components with testing instruments.
Inspect wiring and fixtures for conformance to college specifications or local electrical codes.
Observe functioning of installed equipment or system to detect hazards and need for adjustments, relocation, or replacement. Repair faulty equipment or systems.
Interpret specifications, blueprints, and job orders to workers, and assigns duties.
+ WORK EXPERIENCE
Electrical Installation
Electrical Drawings
Compressor Installation
Panel Drawings
Electrical Specifications
HV & LV Cabling, glanding &
termination
Insulated Copper Conductor
Optical Detector
Pressure Indication Transmitter
-- Fire and gas equipment installation
- HVAC systems installation
_ MICC cable laying, glanding and
termination.
Switch Boards
Control Element
Master Element
Flow Control Switch
Toxic Detector Module
Combustible Detector Module
Audio Visual Strobe
PVC And GI Conduit Pipes
Distribution Boards
End – to - End Project Management
Infrastructure Management
Budgeting / Cost Control
Solution Implementation
Service Delivery Management
Service Revenue Management
Quality Assurance & Control
Infrastructure Services
Incident & Risk Management
Vendor Management & Negotiation
Resource Deployment
New Technology Implementation
Task Allocation
Escalation Management
March 2013 to December 2017
Electrical Supervisor
IMCO Engineering and Construction Co,
Kuwait
May 2011 to Feb 2013
Electrical Supervisor
Gulf spic general trading and contracting
co - Kuwait
May 2005 to May 2011
Electrical Foreman
KUPCO Co
Kuwait
Apr 2004 to Apr 2005
Watch Division - Diploma Trainee
TITAN industries limited
India
+ INSTALLATION EXPERTISE
+965-******** ac3s4l@r.postjobfree.com www.linkedin.com/in/saravana-s-1310
+ ACADEMICS CERTIFICATIONS + SCOPE OF WORK
Participate in the scheduling and assignment of work to sub-ordinate technicians and under - takes such work in the absence of Senior Technicians. Includes establishing work requirements by review of operations log books and/or work orders entered on SAP system.
Identify preventative maintenance requirements in accordance with established schedule.
Review outstanding and work-in-progress, allocating work, obtaining or issuing appropriate.
Handle Hot or Cold Work Permits and provide any necessary technical written or verbal instructions to subordinates technicians to complete work.
Repair, overhauls and calibrates all types of instruments and component parts on site and in workshop and directs subordinates technicians in the removal, disassembly, inspection cleaning and reassembly of instruments.
Check the component parts of control valves and inspects repacking of valve seals; uses sophisticated electronic test equipment such as analyzers, oscilloscopes, frequency testers and meggers to check test circuits; and calibrates or checks the calibration of all types of instruments.
Carry out site repairs on transmitters and alarm systems, Analyzers & Gas Detectors, Fire Alarm Systems, CCTV, Access Control Systems, Safer System, Lab Instruments and replacing components as necessary.
Ensure that all repair work is carried out in accordance with applicable manufacturers' or other instructions, specifications and codes of practice.
+ PROJECTS SINCE 2013
Diploma in Electronics And
Communication Engineering DOTE –
Tamilnadu – India.
First aid training – SAIPEM - Kuwait.
HSE - SAIPEM – Kuwait.
Permit to work – KOC – Kuwait.
+ TECHNICAL EXPERTISE
MS Project
MS Office Suite
AutoCad 2007
Tally 2009
Computer Hardware Servicing
+ RECOGNIZED FOR
Supervision and execution of HV, LV and instrument cables laying for transformer, substations, control room, UPS system and field area.
Coordination of all phrases of HVAC projects from design through installation, specifying equipment including air handlers, pumps, boilers, chillers, cooling towers, exhaust fans and condensing units
Cable laying, glanding and termination in JB’S, PIT, FIT, FI, TI, TE, TG, PG, TIT,FGD, TGD, FD, HN, VLF, VLT, MOV, ROV, XIT instruments.
Installation of instruments PIT, TIT, FIT, TE, TG PG, FI, TI, FGD, TGD, FD, JB’S, HN, VLF, VLT, LCP’S, Condensate seal pot, Guit box, PGLS, FGDR, FGDT.
Study, review and updating of various aspects of distribution systems, standards, guidelines, material specifications, construction procedures, QA/QC plans, and other statistics such as, design reviews, and giving approvals to the design drawings/documents submitted by the contractors.
Evaluating contractor submittals in view of the scope of work, standards and contractual conditions. Co-ordination with different departments and contractors for the successful completion of projects and coordination with contractors/consultants in association with Project Manager for approval of project documents.
Correspondence with contractors, conducting regular site meetings to evaluate the progress and take remedial actions to resolve bottle necks.
Active participation in the selection of project team members
Defining role definition, delegation of competencies/ responsibilities, object/ target agreement, working conditions are a part of my day to day to activities.
Since Dec 2016
Small Boat Harbour Projects
Value: USD 490 Mn
Kuwait oil company
KUWAIT
Nov 2015 – Nov 2016
BS-171 (Booster station)
Value: USD 950 Mn
Kuwait oil company
KUWAIT
Feb 2015 – Nov 2015
Installation and monitoring of
Telemetry control & consumer
network systems
Value: USD 830 Mn
Kuwait oil company
KUWAIT
Mar 2013 – Feb 2015
Construction and Maintenance
of : Water distribution complex
– WDC - I & WDC - II Mina
Abdullah
Value: USD 250 Mn
Kuwait Ministry of electricity
and water (MEW)
+ PERSONAL DETAILS
Date of Birth: 13-10-1983
Languages: Tamil, English, Arabic, Hindi, Kannada & Malayalam.
Passport #: JO365818
Visa Status: Transferrable visa, Article #18 (Kuwait visa)
Permanent Address: 513,6/78 Thalakkavayal st.
Devakottai P.O and TK. Sivagangai
District, Tamilnadu- 630 302.
+965-******** ac3s4l@r.postjobfree.com www.linkedin.com/in/saravana-s-1310
+ CURRENT PROJECTS
IMCO Engineering and Construction CO.
Position : Electrical and instrument supervisor (instruments is my additional responsibility) Project : Small Boat Harbour Projects – Kuwait oil company Client : STFA / SSH - KOC
Supervision and execution of MICC (mineral insulated copper conductor) cable laying, glanding and termination done for the fire and gas system for the 11KV Substations and other associated buildings in the project.
Installation of HVAC ducts and HVAC equipment's in sub stations and other associated buildings in the project
Installation of fire and gas equipment’s like optical detector (OD), Control element (CE), Master element (ME), Flow control switch (FCS), Toxic detector module (TDM), Combustible detector module (CDM), Audio visual strobe, Break glass.
Installation of PVC and GI conduit pipes for the lighting and power circuits and electrical wiring for the 11KV Substations and other associated buildings in the project.
Installation of Distribution board (DB) and electrical panels for the 11KV Substations and other associated buildings in the project.
Supervision and execution of laying the HV cables and LV cables for the 11KV Substations and other associated buildings in the project in the cable trench and through man holes.
Perforated cable tray and ladder cable tray installed for laying the cables for the 11KV Substations and other associated buildings in the project.
Position : Electrical and instrument supervisor ( instruments is my additional responsibility) Project : BS-171 (Booster station) – Kuwait oil company (KOC) Client : SAIPEM / KOC
Installation of cable tray in the pig traps areas and flares areas.
Supervision and execution of HV, LV and instrument cables laying for transformer, substations, control room and field area.
Cable laying, glancing and termination in JB’S, PIT, FIT, FI, TI, TE, TG, PG, TIT,FGD, TGD, FD, HN, VLF, VLT, MOV, ROV, XIT instruments.
Site co-ordination and installation of instruments junction boxes, concrete foundations for the installation of instruments.
Installation of instruments PIT, TIT, FIT, TE, TG PG, FI, TI, FGD, TGD, FD, JB’S, HN, VLF, VLT, LCP’S, Condensate seal pot, Guit box, PGLS, FGDR, FGDT.
Tubing work from the instruments to the tapping point of the pipe lines.
Installation of RTU panel and cable laying, glanding & termination. Position : Electrical supervisor
Project : Installation and monitoring of telemetry control systems and consumer network systems Client : DAELIM / KOC
Installation of solar panel systems, cable laying, glanding and termination.
Installation of borri makes battery panels and UPS systems, PDP panels, RTU cabinet, FOC cabinet, FCA cabinet, cable glanding and termination.
Instruments Cable laying, glanding and termination & installation of instruments..
Installation of cable trays.
Battery termination in battery panels by making series and parallel connection in the battery 1700-ul-1.
Supervision and execution of HV and LV cable laying. Glanding and termination for substation, field area and UPS system. Position : Electrical supervisor
Project : Construction and maintenance of Water distribution complex 1 & WDC-II at Mina Abdullah Client : ABB / MEW (ministry of electricity and water)
Installation, Pre-commissioning and commissioning of ABB make 440V LV SWGR, Bus Tie and Feeders with associated protection devices.
Installation, Pre-commissioning and commissioning of ABB make 440V LV MCC-11, MCC12, MLDB-11, and MLDB12 with associated protection devices.
Installation, Pre-commissioning and commissioning of Capacitor Bank.
Installation, Pre-commissioning and Commissioning of Borries make Battery bank, Battery disconnecting switch, AC/DC UPS System.
Installation, Pre-commissioning and commissioning of Instrument and control equipment’s such as DCS Panel, Marshaling panel, Auxiliary panel, Office LAN panel, HMI panel, ODF panel, Control desk and large screen.
128600 mtr’s various rating of power cable laid, glanding, termination, preparation of cable support drawings, selection of cable accessories. Preparation of drum schedule, planning, execution, progress monitoring, recording and reporting.
180000 mtr’s various rating of I&C and FO Cable laid, glanding, termination, preparation of cable support drawings, selection of cable accessories preparation of drum schedule, planning, execution, progress monitoring, recording and reporting.
+965-******** ac3s4l@r.postjobfree.com www.linkedin.com/in/saravana-s-1310
+ PAST PROJECTS
GULF SPIC GENERAL TRADING AND CONTRACTING CO IN KUWAIT. Duration: May 2011 to Feb 2013
Position: Electrical supervisor
Client: SAIPEM, KOC (Kuwait oil company)
Project: Installation of new compressors at GC-07, 08 & 21
Installation of HT & LT Switchboards, Motor control centers, Metering Panels, All type of LT Motors, Battery Maintenance and Auto Electrical works.
Supervision and execution of cable laying, glanding & termination for HT & LT switchboards, Control panels, Motor control centers, Generators, HT & LT motors, Transformers, Motor operated valves, Lighting & Power distribution boards, Flood lighting poles, Substation & control room lighting.
Tie in of new extension Switchboards & Motor control centers with existing HT & LT panels.
Coordination with procurement department for requirement of vital and essential materials & preparation of material requisition list based on approved bill of materials.
Coordination with QC department and confirm that material received as per specified in contract document.
Preparation for shut down and job safety analysis review of risk involve in hot work permit and successfully completion of shut down.
Supervision & execution of cable tray installation, fire alarm system installation in gathering centers & booster stations.
Installation & testing of Pressure indication transmitter (PIT), Level indication transmitter (LIT), Flow indication transmitter (FIT), Resistance temperature detector (RTD), Temperature indication transmitter (TIT).
Installation of explosion proof equipment’s in hazardous areas.
Installation & testing of complete plant earthing such as driving the earth rod, installation of earth cables, connection of earth cable with Process equipment’s, Electrical Equipment, Structures, Pipe lines, Junction Box, Panels.
Carry out electrical wiring termination and modification of protection relay as per advanced control system by following schematic and inter connection diagram as per drawing provided by the client.
Earth grid termination with equipment by thermo weld, earth resistance checking using megger & earth resistance tester.
Lightning arrester installation with dedicated lightning earth pits.
Installation of tinned copper tape on roof floor of substation buildings.
Meggering, ferruling tagging of cable and cores at marshalling panel JB’s termination point transformer control panel relay panel
Monitoring all field testing activities as per project specifications.
Over all in charge for reporting to engineer, testing commissioning and ensure that work done as per project scope. GULF SPIC GENERAL TRADING AND CONTRACTING CO IN KUWAIT. Duration: May 2010 to Feb 2012 – 1 year extension
Position: Electrical and instrument supervisor
Client: SAIPEM, KOC (Kuwait oil company)
Project: Installation of new 3 TV compressors at GC-07, 08 & 21 Valuation: $121.7 mn usd
Team Size: 60