AJEET SINGH SHEKHAWAT
**-*, ******** ****** *****, Janakpath, Hanuman Nagar Extension Road, Khatipura, Jaipur, Rajasthan
Contact: 978-***-****; Email: *****.*****@*****.***
MAINTENANCE OPERATIONS MANAGEMENT PROFESSIONAL
TPM Safety Operations Continuity Servicing Breakdown Management Stock Management Team Management
PROFILE
Mechanical Engineering with 18+ years of experience in maintaining a diverse range of hydraulic & pneumatic systems and equipment including
oMaterial handling devices e.g. EOT cranes & transfer trollies
oPumps, gearboxes of machines
oSteel plant equipment (cold rolling/ hard & tempering unit) - 4HI FROHLING, Slitting, Pickling, Annealing
oH&T plant equipment – Furnace, Grinding, Polishing
oConveyors, coal gas plant, kiln, glaze line, press, sizing machine, pottery fire plant
oForzing (Hatebur-AMP 30), Auto lathes, CNC m/c, cold rolling m/c, grinding m/c
Expertise in implementing preventive, planned and predictive maintenance schedules to maximize uptime of machines and conducting root cause analysis of failures to avoid reoccurrence
Dexterous in inspecting/ identifying areas of obstruction and initiate rectification to achieve higher operational efficiency, resource rationalization and cost optimization
Possess strong understanding of all aspects governing maintenance operations as well as knowledge of latest technological advancements, regulations/ guidelines & statutory compliances
PROFESSIONAL EXPERIENCE
Manager – Maintenance Agrasen Engineering Industries Private Ltd, Jaipur since June 2017
Assistant Manager – Maintenance Rajasthan Digital Tiles Private Ltd, Jaipur Feb 2017 - May 2017
Sr. Engineer – Maintenance Anil Special Steel Industries Limited, Jaipur Jun 2004 - Jul 2016
Planning and effecting predictive & preventive maintenance schedules of all types of equipment to increase machine uptime & equipment reliability
Observing standard procedures for maintenance of machines to optimize efficiency and to realize zero downtime
Conceptualising & implementing maintenance schedules and carrying out periodic checks to ensure performance and maintaining requisite documents for the same
Identifying areas of bottlenecks/ breakdowns and taking steps to rectify through application of troubleshooting tools like root cause analysis
Anchoring on-site activities to ensure completion of project within the time & cost parameters and effective resource utilisation to maximise the output
Carrying out overhauling work of equipment, modifications & major repairs to improve equipment efficiency
Conducting performance trials of engineering equipment to establish standards before and after major repairs
Liaising with Stores for spares’ availability as well as indenting new spares to ensure optimum stock availability
Production Supervisor RK Cutters Private Limited, Dewas Feb 1999 - Apr 2004
ACADEMIC CREDENTIALS
Diploma in Mechanical Engineering 1998 from Government Polytechnic, Sanawad, MP 73.94%
Intermediate 1995 from Shahdol, MP
Matriculation 1992 from Shahdol, MP
Date of birth: 17th May 1977