PROFESSIONAL PROFILE
** **** ************ ********* ******** with solid experience in reservoir and completions with most experience in production and moreso recently drilling.
Earned excellent performance reviews in leadership and technical roles (office and field) with large production companies due to my reliability extremely hard working nature and ability to consistently find ways to add value.
Currently consulting as a Production and Drilling Engineer for Canuck North Resources, a small production company where I oversee drilling and production operations and related regulatory submissions.
CAREER HISTORY
ORRACLE ENGINEERING, Calgary, AB August 2015 - Present
Petroleum Engineer – Calgary and Fort McMurray
Projects include:
Production and Drilling Engineer for Canuck North Resources (currently role)
Production, Completions and Drilling Engineer for Canacol, Bogota, Colombia (all in Spanish, 4 months)
Suncor Drilling Rig Supervisor on core-hole winter program in Fort McMurray
Assessed sand control and wax/scale accumulation on convention oil wells at Rising Star Resources
Performed decline analysis, used IPR and evaluated Productivity Index and build up test results to determine reserves as Reservoir Engineer at Western Canadian Consulting
Prepared and taught classes for Kablam on Drilling Engineering
Assisted in selling and design of Madala Production Engineering software
Provided well and surface design for geothermal drilling program, Sun Dragon Energy
Assisted in marketing platform and chemistry for an improved drilling fluid, Prairie Fluid Services
95% of these contracts resulted in a 5/5 performance rating and due to my work ethic, presentation skills and ability to communicate to upper management concise learnings and recommendations
NEXEN CNOOC ULC, Office and Field, Western Canada May 2006 – August 2015
Drilling and Completions Engineer – Horn River Basin May 2014 – August 2015
Reviewed shale gas drilling program and successfully sought and implemented optimization initiatives
Negotiated performance based contracts for key services for pad budgeted at $30 million
Performed technical limit study determining how long horn river shale gas wells can be drilled
Evaluation completion techniques and their resulting production
Worked with production and reservoir engineering teams to present and report large project plan to upper management
Drilling and Completions Engineer – Long Lake October 2010 – May 2014
Led junior engineers in budget management initiatives for $50 million project
Earned EX (top 3% of all Nexen engineers) overall rating for technical achievements
Sought out and obtained improved pricing with centrifuge and drill bit vendors
Wrote and executed drilling program for Long Lake pad 14/15 and earned a 96% scorecard
Presented drilling performance comparison of JACOS to Nexen’s Kinosis and Long Lake
Completions and Production Engineer – Dilly Creek/Fort Nelson May 2010 – October 2010
Part of a team that achieved an industry leading 3.5 fracs/day on b-18-I 8 well pad, $40 million
Involved in field operations and production optimization for large convention gas wells
Reservoir and Production Engineer – Long Lake and Other Fields May 2008 – May 2010
Hired and supervised Long Lake Co-op students and evaluated their engineering projects
Optimized performance of Gas-Lift/ESP operations
Performed reservoir simulations and reserve estimates
Presented papers internally and at SPE conferences in South Dakota and New Orleans
Taught intro to Petroleum Engineering course to over 100 engineers and students
Production/Facilities Engineering Coop Student – Long Lake January 2007 – May 2007
Reservoir/Production Engineering Coop Student – Long Lake May 2006 – September 2006
PETRO-CANADA., Calgary, AB May 2007 – September 2007
Drilling Engineering Coop Student – MacKay River
APACHE CANADA, Zama, AB May 2005 – December 2005
Field Operator and Production Engineering Coop Student - Zama
CANADIAN NATURAL RESOURCES, Grande Prairie, AB May 2004 – August 2004
Field and Plant Production Optimization Summer Student – Ante Creek
QUALIFICATIONS AND EDUCATION
Member of APEGA, CADE, and the SPE
Tickets include: 2nd Line Drilling Supervisor, First Aid, H2S Alive, Well Service Blowout Prevention, WHMIS certification, IRP 16, OSSA BSO, Wildlife Awareness, and Construction Safety Training System (CSTS-09)
Completed Nexen’s 5 year new grad engineering training program for production and reservoir engineering
Participated or presented Engineering concepts at 9 SPE conferences in Dallas, San Antonio, Anaheim, Denver, New Orleans and Florence
Chosen by Nexen to make multiple presentations internally and at the U of C in “A Day in the Life of a Drilling Engineer”
Apache achievement award for teaching other summer students
Petroleum Engineering, U of Alberta, BSc, April 2008, GPA: 3.9/4.0
Team lead on thesis production engineering project placing first in class and receiving scholarship
Class 5 driver’s license with an accident-free drivers abstract
Received 100% on Provincial Grade 12 math exam
COMPUTER / PROGRAM EXPERIENCE
Competent in, typically from formal training for: CMG STARS, Wellview, Madala, Wellplan and all other elements of MS Office, C++, Matlab, Excel, Total Well Management, RodStar, OpenWells, PASON, Accumap, Wellplan, SCADA, AFEnavigator, Cartofact and Fieldview
PERSONAL
Placed 1st at Canada Winter Games in Freestyle Skiing
Placed 1st at Canadian Junior Nationals in Halfpipe and Mogul Skiing
Only student chosen from U of A to present in SPE paper contest finals, 2008
Western North America youth SPE paper contest champion, 2008
REFERENCES
Gregori Colomine, Nexen, Team Lead Well Integrity, 587-***-**** (Cell), 587. 893.6305 (office)
Chris Gabrielson, Kablam, Owner, 403-***-**** (Cell)
Daniel Grunberg, Cartofact, Owner, 403-***-**** (Cell)
Brian Whitehead, Suncor (now Tourmaline), Drilling Superintendent, 403-***-**** (Cell)
Hammad Zafar, Nexen, Team Lead Drilling Engineering, 403-***-**** (Office)
Trevor Baird, Calgary Thermal Creations, 403-***-**** (Cell)
Tyler Fletcher, Prairie Drilling Fluids, 403-***-**** (Cell)