JASON D. ILES
Grovetown Ga, *****
(810) 858 – 8950
*******@*****.***
CAREER SUMMARY
A Quality, Program, and Operations Professional with over 22 years of experience specializing in Quality Systems Management, Operations Management, Material Planning, Product Launch and Project Management. Providing leadership skills in the pursuit of sustained Operational Excellence supporting Continuous Improvement with a World Class Organization.
CORE COMPETENCIES
Product Launch Management
ISO/TS Implementation & Auditing
Program Management
Quality Planning (APQP & PPAP)
Product Design
Problem Solving and Root Cause Analysis
Lean Manufacturing / 5S
CAD / Catia Component Design
Material Planning and Purchasing
Geometric Dimensioning & Tolerancing
PROFESSIONAL EXPERIENCE
Akebono Brake Systems, West Columbia, SC 8/2017 – Present
Quality Systems Engineer - In the roll the Quality Systems Engineer I am responsible for auditing and developing the quality system to meet the IATF and VDA standards.
Quality Systems Engineer Duties include but are not limited to:
Prepare team for VDA and IATF Audits
Create and maintain action plan for gap analysis
Develop and improve work instructions
Complete daily audits of the process
Validate corrective actions
Perform Internal system audits
Maintain document control
HP Pelzer Automotive Systems, Thomson, GA 12/2013 – 8/2017
Operational Excellence Manger /Operations Manager- In the roll as the Operational Excellence Manager I lead and manage the plant manufacturing environment to a continuous improvement culture. Plan, organize, implement, and support team centered continuous improvement activities. BMW, Mercedes, VW, Toyota, GM, Ford and Subaru.
Operational Excellence Manager Duties include but are not limited to:
Manage and implement cost savings ideas.
Reducing scrap by improving process and building in quality checks.
Maintaining cost savings database.
Implementing standard work in processes to increase OEE.
Responsible for optimizing cell layouts for proper material flow.
Developing TMP for production equipment
Developing 5S standards for all production cells
Operations Management Duties include but are not limited to:
Direct and manage the overall manufacturing operations of the facility
Partner with HR to develop and adjust manpower based upon Material Planning and Production rates
Provide leadership to first line supervisors in production departments including establishing objectives, setting goals, and managing accountability for attaining deliverables required of supervisory team
Partner with internal operations suppliers (HR, quality, safety, production control, etc.) to ensure quality, deliver, safety, goals are achieved
Provide Materials and Production Planning
HP Pelzer Automotive Systems, Thomson, GA / Port Huron 7/2008 – 12/2013
Quality Manager - Management of the Quality System for tier 1 automotive supplier dealing with Sound Insulation and Soft Trim, Assembly and Dealer Direct Service. Duties include supplier management, inspection management, MSA, layout inspection, customer service and Packaging Development and Root Cause Analysis to reduce Warranty issues.
Managed APQP on programs launched utilized PPAP for all new model General Motors Accessories.
Managed customer corrective actions for BMW, Mercedes, General Motors, Chrysler, Ford, & Toyota.
Quality System Management Representative responsible for QS9000 & TS16949 Certification.
Value Stream Mapping and Lean Manufacturing to improve quality, process capability and reduce costs.
Successfully implemented QSB in two plants
Supervision of quality staff (7 employees)
Facility Program Manager Duties include but are not limited to:
Optimized Program Management process in the plant to further improve profitability and cost control
Manage the APQP and Project Management for all new launches
Successfully identify high risk suppliers and help them develop systems to improve their quality
Responsible for tracking, documentation and monitoring all aspects for the ECN process for selected program
Support APQP and VA/VE activities for launch readiness and Cost Savings
PROFESSIONAL EXPERIENCE (Continued)
Chrysler / FCA, Auburn Hills, MI 4/2007 – 8/2008
Customer Satisfaction Team
Responsibilities included the introduction of new components with existing and new suppliers; maintaining quality level of current suppliers of production components. Processes of focus included all hard and soft trim for the CST.
Successfully identify and reduce top warranty issues based on customer feedback, worked with the product team to redesign or change the process to fix the issue.
Work with assembly plant if it is an assembly issue
Update the tracking systems (transmittals and E cims)
Verify all changes when complete
Release Engineer
Responsible for opening and following design release and engineering changes for Chrysler/FCA.
Successfully design and launched hard trim and load floors for the KA and KK programs
Successfully completed all engineering changes and documentation through the Change Notice System
Successfully implement cost improvements through the MCM program
Support the APQP process in the manufacturing plants
Review and approve supplier’s DVP&R
Provide launch support to assembly plants
Port Huron Township Fire Department, Port Huron Township, MI 7/2009 – 8/2010
Firefighter/ EMT
Clean and stock ambulance
Perform medical interventions for injured and and/or ill patients within local and state protocols
Perform Live saving measures i.e. CPR
Ability to assess the scene
Correctly document actions in detailed reports
Operation of an emergency vehicle with due regard
Complete daily maintenance, safety, and station cleaning checklists
Carcoustics, Novi, MI 5/2005 – 4/2007
Key Account Manager
Successfully launched acoustic parts for Chrysler for KA and KK programs.
Managing the quoting and cost of new programs to the customer
Complete all necessary paperwork and negotiate engineering change cost with the customers
Implement all cost improvements through the MCM program
Responsible for design and engineering products following APQP process.
Manage production operations for launch of new products on the production floor
Collins & Aikman, Troy, MI 7/1994 – 5/2005
Program Manager
Responsible for managing all activities with regards to four different Chrysler programs(JR, LX, DR, and ND carpet and acoustics)
Manage the implementation of cost improvements through the MCM program
Support various facets of the APQP process in the manufacturing plants and the corporate level
Responsible for costing and quoting new and existing business to the customer
Product Engineer
Responsible for all engineering elements for the LX program (carpet and acoustics)
Implementation of cost improvements
Responsible for all aspects of design and engineering with respect to existing changes and new business
Support plants in various aspects of the APQP and PSO process
Responsible for implementation of engineering changes, subsystems component level and plant launch coordination
PROFESSIONAL EXPERIENCE (Continued)
Collins & Aikman St. Clair, MI 7/1994 – 5/2005
Quality Manager
Auditing quality assurance systems and activities (ISO,QS and TS16949)
Implementation of Engineering Changes
Working knowledge of PPAP, FMEA, APQP and calibration and APQP functions
Supervision of quality staff (8 employees)
Planning, budgeting and maintaining cost
Plant Customer Contact Representative:
Active participant in Core Team Meetings during pre-launch and production stages of products
Create and update FMEAS and Control Plans
PPAP Submission
Dealt with supplier issues including credits, corrective actions and prevention
Performed GM and Daimler Chrysler PPAPs through internet
Warehouse Supervisor:
Scheduled duties for warehouse personnel (3 employees)
Ensured all shipments were audited and loaded on time
Verified all EDI information was transmitted within timeframe and accurate
Rotate into production for weekend supervision.
Production Control Technician:
Scheduled daily production, material orders and shipping of products
Utilized AS400 based program for planning, inventory control and purchasing of component parts
Interfaced with both customers and suppliers regarding production concerns
Acted as temporary coordinator for 3 months while manager position was empty
Warehouse Team Leader:
Created all shipping documents for all outgoing shipments
Audited outgoing material
Ensured all trucks were loaded properly and left within window times
Additional Career History and Information Upon Request
EDUCATION
St. Clair Community College, St. Clair, MI
Firefighter 1 and 2
St. Clair County TEC Center CAD/CAM
Haz Mat Operations
Emergency Driving
EMT A
COURSE WORK
Lean Manufacturing
Quality System Assessment
Layered Audit
Failure Mode Effects Analysis
Control Plans and Reaction Plans
Team Building
Problem Solving 8-D
Lead Audit Certification - KPMG
Mistake Proofing
Lead Audit Certification - KPMG
ISO/TS16949 Requirements
TS16949 Transition