Post Job Free
Sign in

Electrical Maintenance

Location:
United States
Posted:
December 19, 2017

Contact this candidate

Resume:

Ty Mckee

*** ****** **

MiddletonTn. *****

731-***-****

tmckee8 1 ***@*****.***

Education/Certificates

University of Florida, Associates of Electrical Engi.neering Southaven, MS Journeyman Electrician License 18706# Certified Welder wlll2#

Professioral Experience

NewBreed . May 2012-Present

Maint enance E lectrician

Responsible for reducing and elimihating production downtime through quick problem solving, planning, and engineering ofparts and tools, Planning and implementation ofpreventive and predictive maintenance of various components throughout the facility, Maintains and performs electrical and mechanical maintenance on Jones & Pearson Case Erectors, Automatic conveyors, Ink Jet Printers, and bagging equipment, Troubleshoots and edits PLC programs, Replaces 3 phase motors, gear boxes, and drives, Perforrns maintenance on pneumatic and hydraulic machines, Performs welding and soldering when needed. Nike

Maint ennnce Technician

June 201 I-2012

Periormed mecharrical and electrical repairs and troubleshooting of conveyor equipment, electonic circuits, motors, gear reduceis, pneumatic andhydraulic contr_ols, and Programmabie Logic Controllers-(PlCs), Ability to troubleshoot AC/DC circuits, Yo&4 on-laser scanning eqriipment such as, omni-directional, Accusort, and.side scarur.ers and_ UCC128 bar coding. ex]"rienc", Ability to repair various types of sortation conveyors and sorters I

Cascade

E&I Technician

Dec. 2010-May 2All

Worked preventative maintenance for high speed automated cooveyor systems Repaired, replaced and rewired electrical components on automated equipment as needed Worked on electrical panels (120-480), Troubleshot and edited PLC's; Worked on pneumatic and hydraulic valves, Worked on120-240 volt$C/DQ motors Shell Oil

Electrician

Ian.Z}M-Oct.2010

Pedormed routine and preventative mainte,nance, Troubleshot Allen Bradley PLCs, Rewired motors,

SNC/ Lavalian (Nepco/,F\ Enron), Jan. 200GJan.20O4 Joumeyman Elecfrician

Worked several projects while taveling througtiorlt,the United Stales, Supervised 8-20 man crew Programmed, edited, and troubleshot PLCs, Ranl conduit, pulled wire, Instrumentatioq Motor contrrols, 120-480 motors : '



Contact this candidate