C U R R I C U L U M V I T A E
NAME
RONALDO B. PEREYRA
Lot 10 Block 19 Kampupot Corner
Sampaguita St. Pembo Mkt. City
Cell. No.+63-947*******-(+63-920*******
Email : ************@*****.***
POSITION APPLIED FOR
EMPLOYMENT DATA: Construction/Project Manager
GOALS AND OBJECTIVE:
My Goal is to provide excellent service and be a key point in the team that contribute to the progress
of the Company.
To become a succesful engineer, growing up both professional and personally among enterprise, improving my potential and solving daily and punctual intellectual challenges.
As a Construction Project Manager with over 20 years of experience in different role for construction implementation and execution and in depth experience in construction management bussines.leader in
Managing cross company team effort through effective and motivating mentoring strategies.
AREA OF EXPERTISE:
A.Construction Management, Implementation and execution
B.High and Midrise Building Projects
C.Civil/Finishing Fit-out works for Building and High-End Residential Projects.
I. COMPANY: KHMAYA Builders Inc. PROJECT MANAGER
Unit 308 Golden Sun Bldg. II, 29 Mindanao
Ave., Brgy. Pagasa, Quezon City
Presently Employed
Contract Value: Php800M
Construction of SM Legaspi Project
II. COMPANY: Bongkyung Construction Co., Ltd CONST. MANAGER
P.O Box 1582, Riyadh 11352 Kingdom
Of Saudi Arabia
May 17, 2015 to May 24, 2017
Contract Value: SAR 277M
Const.of 24 Building 6 Storey Residential Projects
CONSTRUCTION/TECHNICAL DEPARTMENT
Main Duties and Responsibilities
Overseeing construction of SAR277M Proposed Residential Building Project in Yanbu, KSA.
I am co-managing with the Project Manager the Construction of SAR277M Proposed Residential
Building at the Royal Commission Government Project of which the Project Management
Consultants are Parsons.
Ensuring all site Facilities, site crew personnel and logistic and other support are fully
Operational and functional to provide support to the project.
Providing co-management support to the Project Manager to ensure project is within schedule
and budget in its progress.
Ensuring we are closely interacting with the project superintendents/architect/project managers
on a daily basis to ensure consistent access of information/instructions to allow project to
progress.
Administering all project management and contract management documentation facilitation from
Daily weather data, site personnel attendance records, daily work status reports, RFI’s for
Information from architects, facilitation of meeting to address the issues with external parties
As well as with internal parties such as subcontractors.
Compiling of various projectreports (workproject status, financial, etc.) on a monthly basis for
Internal purposes within management on Bong Kyung Construction Company Ltd.and also
To the Project Mmanagers/Architects as part of contract requirements
III. COMPANY: Ultra Engineering Ltd.
P.O Box 2436 LAE, Morobe Province
Papua New Guinea
Nov.20, 2014 to April.29, 2015
CONSTRUCTION MANAGEMENT DIVISION PROJECT MANAGER
Main Duties and Responsibilities
Perform a key role in project planning, budgeting and identification of resources needed.
Ensure that the construction activities move according to predetermined schedule
Project accounting functions including managing the budget tracking if team expenses minimi-
zing exposure and risk in the project.
Create the team develop the objectives/goals of each and assign individual responsibilities.
Communicate effectively with the contractors responsible for completing various phase of the
project.
Coordinate the efforts of all parties involved in the project which include, the architect,
contractors, subcontractors and laborers.
Monitor the progress of the construction activities on a regular basis and hold regular
status meeting with all the sub-teams.
Maintain strict adherence to the budgeting guidelines, quality and safety standards
Devise the project work plans and make revision as and when need arises.
Periodic inspection of construction site.
Identify the elements of project design and construction likely to give rise to dispute and
Claims and ensure the project documents are complete
Serve as a key link with the clients and review the deliverable prepared by the team
Before passing onto client.
IV. COMPANY: NiuginiBuilders
Dobel Estate P.O Box 1293
Mt.Hagen 281,Western Highland Province
Papua New Guinea
April 14, 2014 to Nov.16, 2014
CONSTRUCTION DEPARTMENT AREA MANAGER
Main Duties and Responsibilities
As Area Manager at Niugini Builders in Mt Hagen, Responsible for overseeing and
project managing building projects in Highlands Region.
Responsible for planning and organizing projects activities including determining
resources to be allocated for each projects site so that sufficient skilled manpower
and equipment is on site to carry out works to successful completion.
Oversee construction of a range of building contracts from start to finish.
Perform management role in project planning, budgeting and execution of works in
consultation with Head Office Management (HOM)
Ensure construction activities are according to pre-determined schedules. Communicate
effectively with the client and sub-contractors responsible in completing various phases
of the projects.
V. COMPANY: LMMC – LipaMedix Medical Center
Along National Highway, Balintawak
Lipa City, Batangas
June 2012 to Feb.2014
CONSTRUCTION MANAGEMENT DIVISION PROJECT MANAGER
( Owner’s Representative)
Project Handled
1.6 Storey Hospital Construction Project – Lipa City, Batangas
Main Duties and Responsibilities
Assuring Compliance with the organization project management guidelines and
Communicate with other subcontractors managers and working with the project
Owner and committee member for the direction and resourcing of the project.
Validate and evaluate the intended benefits and preparation of business case, Project
Charter and Project justification of brief as appropriate.
Scope control and change management and assuring the quality of the project
Management progress and Project Status, reporting directly to Hospital President
and Construction Committee Chairman.
VI. COMPANY: DMMC-Daniel Mercado Medical Center
#1 President Laurel Highway, Tanauan
City, Batangas
Nov. 14 2011 to June 14, 2012
CONSTRUCTION MANAGEMENT DIVISION PROJECT MANAGER
( Owner’s Representative)
Project Handled
1.Hospital Construction Project – Tanauan, Batangas City
Main Duties and Responsibilities
Planning and organizing the project activities, including determining resources
Requirements, what and when.
Working with projects Owner’s for the direction and resourcing of the project.
Coordinates with the technical subcontractors manager and team members.
Communicates with other department managers and Stakeholders of the projects.
Assuring compliance with the organization project management guidelines.
Collecting of input from project stakeholders to define the project requirements.
Validation of the intended benefits and Preparations of business case, project charter
Project justification of brief as appropriate.
Scope control and change management and assuring the quality of the project management progress & Project Status reporting and forecasting.
Resolution of conflicts with the project or between cross functional teams and
Ensuring that the project product does in fact deliver the benefits called for.
Responsible for all construction management operation for Hospital Facility and Facilities office improvement. Plan, design and supervise for on-going Hospital Construction Project.
Progress reporting directly to Hospital President and Managing Director.
VII. COMPANY: Aronlai Builders Finishing Contractor
#323 Kamias St. Cembo Makati City
Nov. 2003 to Feb. 2010
CONSTRUCTION DIVISION OPERATION MANAGER
Project Handled
1.Saint luke Medical Center – Global Taguig City
2.Makati Medical Center – Makati City
3.Dansalan Gardens Residences – Highrise Building – Mandaluyong City
4.River Front Residences – Mid Rise Building – Taguig City
5.Rosewood Residences – Highrise Building – Pasig City
6.Tivoli Gardens Residences – Highrise Building – Mandaluyong City
Main duties and Responsibilities
Oversee the construction project from start to finish.
Perform a key role in project planning, budgeting and identification of resources needed.
Create the team, develop the objectives/goals of each and assign individual responsibilities
Project accounting functions including managing the budget, tracking if team expenses and minimizing exposure and risk in the project.
Ensure the construction activities move according to pre-determine schedule.
Communicate effectively with the contractors responsible for completing various phase of the project.
Coordinates the efforts of all parties involved in the project which include the architects consultants, Contractor, Subcontractor and Laborers.
Monitor the progress of the construction activities on a regular basis and hold regular status meeting with all the sub teams.
Maintain strict adherence to the budgetary guidelines, Quality and Safety standards.
Periodic inspection of construction sites and ensure project documents are complete.
Identify the elements of projects design and construction likely to give rise dispute and claims.
Serve as a key link with clients and review the deliverable prepared by the team before passing onto clients.
Responsible for all construction management operation and typically managing civil and interior finishing works involving sub-contractor and consultants.
Administrative and Construction Contract Management.
VIII. COMPANY: R.D. Samaniego Roofing Corporation
#1088 Ortigas Ave. Ext., Bayanihan
Village, Cainta, Riza
Oct. 2000 to Oct. 2003
FABRICATION & CONSTRUCTION DIVISION PROJECT IN CHARGE
Project Handled
1. Construction of Semiconductor Building – Cavite City
2. Construction of Warehouse Building – Laguna
3. Construction of SM Mall Warehouse – Laguna
4. Construction of Warehouse Paint Building – Laguna
5. Construction of Office Building – Pasig City
Main duties and responsibilities
Manage the project taking into integration across all areas and engage w/ stakeholder
Develop project plan and Direct project resources
Monitor and Manage the project schedule and monitoring the project budget.
Monitoring and manage the project risk and deal with operational issues.
Organizing steering committee, raising strategic issues.
Prepare project status reports and project change request for the steering committee and ensure project meets requirements and objectives.
Manage project team members and organize and chair project reference group meeting as appropriate.
Communicate project status, all team members and other relevant stakeholders and involved parties.
Negotiate and resolves issues as they arise across areas of the project and where they impact on the other activities, system and projects.
Setting up meeting, running meetings, writing and distributing meeting minutes.
Determine resources required, interviewing candidates, vetting vendors, and assigning tasks.
Creating a plan, executing a plan and adjusting the plan as necessary and Preparing Status reports and presenting to upper management.
Prepare Project Operational Plan of project from Mobilization to Demobilization such as budget for job expenses and materials using project parameter, staffing and equipment needed.
Coordinate with the client and field inspector regarding the progress of the Project and Report directly to the Owner.
IX. COMPANY: P.IMES Corp.(Philippines International Manufacturing and Engineering
Services Corporation)
Phase IV, Cavite Economic Zone
Rosario, 4106 Cavite
Feb. 1999 to Sept. 2000
FACILITY MAINTENANCE DEPARTMENT FACILITIES SUPERVISOR
Project Handled
1.Construction of Semiconductor Facilities Extension Building
Main duties and responsibilities for Construction
1.Responsible for all construction management operation including plans, design and supervise from start to finish.
Main duties and responsibilities for Plant
Responsible on designing and maintaining an efficient and uninterrupted supply of electricity, water and compressed air for production use, Implemented and maintains the standard working environment of the plant. Plan and design for Manufacturing expansion.
Supervise and Conduct the operation and preventive maintenance of facilities equipment together with 4 shift engineers, 4 shift operator and 4 maintenance crews.
a.)Mitsubishi Diesel Power Plant (2 x 1000 kva Synchronized and 1375 kva)
b.)Electrical Switch Gear and Panel Board
c.)Koppel freight Elevator (2 x 1MT)
d.)Hydraulic lifts (4x 1MT)
e.)Air Handling Unit and package air conditioning
f.)Production water chiller and cooling tower
g.)Screw air compressors and refrigerated air dryers
h.)Class 10,000 and 1,000 Clean rooms Maintenance
i.)Building Maintenance
Monitor equipment performance using VOM meter, Clamp ammeter, Megger Tester, Energy analyzer, Gauge manifold and belt tension tester, Monitor Clean room
Environment using particle counter and temperature humidity meter, Monitor Power plant sound level using Decibel meter.
Evaluate equipment performance based on monitoring inspection maintenance check sheet and generated paper chart on equipment breakdown summary.
Prepare daily maintenance work order and weekly monthly annual maintenance.
Prepare standard preventive maintenance check sheet for new equipment. Update standard PM check sheet procedure for other equipment. Update maintenance standard procedure.
Coordinate with the manager regarding utility comparative studies on 24 hours energy supply from Gen set or Local Utility (NPC) and comparative study on Gen set Overhauling or Purchase new units.
Track and study records regarding Utility consumption and cost for energy and water consumption. Prepare requisition for payment on Electrical Bill, Diesel supply and water and sewerage bill.
Inspect and monitor on-going project for Class 1000 clean room expansion and design and estimate materials to be use for building maintenance and expansion.
Draft standard of ISO 14002 EMS Certification for pollution preventive maintenance and control committee, Health and Safety committee and energy and water conservation committee.
Prepares recommendation to human resources and services (HR&S) director on plans and procedure for maintenance activity improvement, plans were based on OBM-Japan maintenance mechanism incorporated with 5S.
ISO 14000 Environmental Management System (EMS) Core Committee Member, Safety Committee member and Fire Brigade member, Act as a Safety and Security Officer during non-working days holidays and when assigned as a night shift officer.
X. COMPANY: DCDC (Data Center Design Corporation)
2nd Floor Mile Long Building
Amorsolo St. Makati City
Nov. 1996 to June 1998
PROJECT MANAGEMENT DEPARTMENT PROJECT ENGINEER
Main duties and responsibilities
Project Handled
1.Fujitsu Phase 1 to 3 Semiconductor Facilities Plant Building – Laguna
2.Analog Devices Semiconductor Facilities Plant Building – Cavite City
3.Sun technology Semiconductor Facilities Plant Building – Cebu City
4.Analog Devices facilities Plant Building – Paranaque City
5.Texas Instrument Plant Building – Baguio City
6.Cement Plant Building – Cebu City
Planning and Design for the Clean room Construction, including the raised Flooring System
Monitoring all works accomplishment and Management progress reporting.
Prepare project operational plan of the project from Mobilization to Demobilization such as budget for job expenses. Materials, direct labor cost using project parameter staffing and equipment needed.
XI. COMPANY: AG&P (Atlantic Gulp & Pacific)
2nd St. Tacoma Port Area Manila
May 1996 to Sept. 1996
HONIRON – FABRICATION DIVISION PROJECT ENGINEER
Project Handled
1.Isuzu Plant Building – Santa Rosa Laguna
2.Toyota Plant Building – Santa Rosa Laguna
Main duties and responsibilities
Planning, Designing and scheduling of all Fabrication works at site.
Coordinate with Quality Assurance Engineer in performing test operation of steel works as per plans and specification.
Supervise the lay-out and group of installer for the fabrication of steel works to ensure the quality of the works.
Report directly to the project Manager for the progress of the project.
Prepare daily accomplishment report and assist to the Project Manager and other duties and responsibilities that maybe given from time to time.
XII. COMPANY: G.E CONSULTANCY
2nd Floor J&S Bldg. 869 Quezon
Avenue Quezon City
Feb. 1994 to Sept. 1995
CONSTRUCTION DIVISION PROJECT ENGINEER
Project Handled
1.E.G. Tower Building – Quezon City
2.Condo Plaza Tower – Makati City
Main duties and responsibilities
Prepare bar chart, PERT CPM and Project Milestone for purpose of progress accomplishment reporting, Monitoring and control to include cost status on materials installed, labor equipment and job expenses.
Assist the production planning and control in organizing resources for the project schedule such as cash flow, equipments, manpower, materials and facilities.
Coordinate with Quality Assurance engineer in performing the operation of civil works as per plans and specifications.
Management reporting.
XIII. COMPANY: ASSET BUILDERS CORPORATION
Unit 2106 A. Phil. Stock Exchange Center
Tektite Road Ortigas Center, 1600 Pasig
July 1993 to Jan. 1994
EQUIPMENT AND CONST. DIVISION SUPPORT/ASST. ENGINEER
Project Handled
1.G.S.I.S Government Building Project – Pasay City
Main duties and responsibilities
Monitoring all Construction equipment for daily operation
Responsible for the maintenance of construction equipment and support all the necessary assistance regarding the progress of the project.
Supervised all finishing works of manpower at site
Prepare take off materials, program at works and prepare daily accomplishment report and assist to direct superior.
Check and review properly the quantities against error and inconsistencies.
Deals and negotiate with the sub-contractors and clients and represent the company during Progress meeting.
XIV. COMPANY: ISA INDUSTRIES
546 Cordillera St. Mandaluyong City
Feb. 1994 to Nov. 1994
FABRICATION & CONST. DIVISION PROJECT SUPERVISOR
Project Handled
1.Construction of Pre-Fabrication School Building
Main duties and responsibilities
Coordinate with quality assurance engineer in performing of Pre-pad school building as per plans and specifications.
Coordinate to the DPWH engineer for the progress of the project to ensure the quality against error and inconsistencies.
Supervise the delivery and fabrication of steel trusses and long span pre-painted roof in order to review properly the quantities and total quality of construction works.
Supervise the installation and testing as per plans and specification and to achieve the total construction workmanship.
Management Progress Reporting.
XV. COMPANY: ISETANN DEPARTMENT STORE
Araneta Avenue, Quezon City
Aug. 1992 to April 1993
FABRICATION & CARPENTRY DIVISION CARPENTRY SUPERVISOR
Project Handled
1.Isetan Department Store Tower – Cubao Quezon City
Main duties and responsibilities
Responsible for the maintenance and repair of wooden works inside department store such as canopy, shelves, and other wooden works design and given by stall supervisor in our fabrication division.
Report directly to Department store manager
Estimate the materials needed for maintenance works by requesting of every department head for expansion purposes.
Handling highly skilled manpower
Coordinate to the Department Manager for the total works satisfaction.
XVI. COMPANY: W.G.C.C (William Golangco Construction Company)
408 J. Nepomuceno St. Manila
April 1989 to Sept. 1989
CONSTRUCTION DIVISION CIVIL ENGINEERING AIDE
Project Handled
1.Sky Plaza Tower – Makati City
Main duties and responsibilities
Monitoring all works activities and estimate the materials needed on the site by local purchase.
Handling manpower like steel man, carpenter, laborer to give their respective job assignment.
Coordinate with the client and field inspector regarding the progress of the project.
Represent the daily progress meeting by the company.
Supervise its total construction and observe commendable workmanship.
EDUCATION:
ELEMENTARY : PEMBO ELEMENTARY SCHOOL (1979)
SECONDARY : : FORT ANDRES BONIFACIO COLLEGE (1984)
COLLEGE : TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES (1989)
SPECIAL SKILL : PROJECT MANAGEMENT, IMPLEMENTATION & EXECUTION
(Computer Literate, Microsoft and Excel with knowledge in auto cadd)
SEMINAR & TRAINING’S:
TITLE: Construction Safety Training
(Held at the OSHC Complex North Ave.Cor.Agham Road Diliman Quezon City
(April 11 to 15, 2011)
TITLE: Dynamic Communication for Effectiveness in the works place
(Held at New World Hotel, Makati City on May 17, 1997)
TITLE: Project Management
(Held at Traders Hotel, Manila on December 14 and 15, 1997)
TITLE: Brain Power for Excellence
(Held at DCDC Conference room Makati City on November 4, 1997)
TITLE: Re-bar Detailing and Cutting list Preparation, CMDF
(Held at Dasmarinas Cavite on February 26 to March 1, 1996)
TITLE: Computer Aided Structural Analysis, MICROCADD TECH
(Held at Quezon City on January 9 to February 13, 1996)
TITLE: Computer Aided Construction Project Management, CAD Vision
(Held at Manila on Nov. to Dec. 1995)
TITLE: Advance Management Techniques for Engineer, Global Training
(Held at Quezon City on December 15 to December 18, 1993)
TITLE: Advnce Highway Engineering Training Coarse
(Held at DPWH Main Conferene Room Manila on February 12, 1992)
TITLE: Computer Aided Design Technology, ACCESS Computer School
(Held at Makati City on September 14 to Oct. 9, 1992)
P E R S O N A L D A T A:
Sex : Male
Civil Status : Married
Nationality : Filipino
Religion : Roman Catholic
Weight : 160 Lbs
Height : 5’7”
Date of Birth : May 28, 1967
Place of Birth : Manila
Name of Spouse : : Adelaida S. Pereyra
Fathers Name : Marino T. Pereyra
Mothers Name : Estrella B. Pereyra
I certify that the above information and date are true and correct
Signed: Ronaldo B. Pereyra Date: December 2017