Planning Engineer

Location:
Quezon City, NCR, Philippines
Posted:
December 13, 2017

Contact this candidate

Resume:

Position : PLANNING ENGINEER

PROFILE:

Assigned in various projects in abroad under Saudi Electricity Company (SEC), Saudi Aramco, Shinsung Corporation, Saudi Petrochemical Company (SADAF), Saudi Arabian Fertilizer Company (SAFCO IV) Expansion Project, Jubail Chevron Phillips Co. (JCP), Saudi International Petrochemical Co. (SIPCHEM) and Qatar Petroleum (QP) in Dukhan Fields and Ras Laffan. Also in various projects under Shinsung Corporation, National Irrigation Administration and other construction company in the Philippines.

PROFESSIONAL EXPERIENCES:

Bechtel & Co. LLC

Dev’t of Muscat International Airport Project

Muscat, Oman

9 Aug 16 to 23 Nov 16

Planner

MEP Support Team for PTB Building Plant Rooms, Fire Detection and Alarm System (FDAS) and Public

Address and Emergency Warning System (PAEWS) for all areas.

AL YUSR TOWNSEND & BOTTUM QATAR CO. LTD

P.O Box 22778, Doha, State of Qatar

December 2007 – April 2016

Senior Planning Engineer

List of Projects / Experience:

EPIC for Shifting of Dukhan Water Network SCADA System to DWCC Building, Qatar Petroleum, Contract No. LC15100400.

EPIC of Expansion of Rotating Equipment Workshop at RG Plant in Dukhan Qatar Petroluem, Contract No. GC14104200.

Planning & Monitoring of CFH & CCB Projects at Al-Udeid Air Base Qatar, MEP Construction for 20 nos. Billeting, Contract No. F011900019.

EPIC of Street Lighting for roads to PWI-3 PWI-6 within Dukhan Fileds Qatar Petroluem, Contract No. GC13103500.

EPC of Natural Gas Supply to the Independent Power Plant (IPP) in Al

Udeid Air Base under Qatar International Power Technology Co. WLL, Contract No. PCC-05-11- C001

EPIC of HVAC System for the New JBOG Warehouse for JBOG Recovery Project at Ras Laffan Qatar Petroleum, Contract No. J3BG-FML-9-F240.

Upgrade of Diesel Fuel System and Project Management & Supervision for the Erection of the Fuel Oil Storage Tank (12.0m I.D x 8.0m H) in Qatar International Power Technology Co. (QIT) at Al Udeid Air Base, Contract No. PCC03/08/11/C006.

Construction / Erection of 2 Nos. Warehouses of Fluor Daniel – Qatar Gas 3 & 4 QCS Project in Ras Laffan. Contract No. CF-137.

CTJV Accommodation Camp, 4 MVA Power Plant and Warehouses Demolition Works at Ras Laffan Qatar, Contract No. QCS-CS-SFC-094.

EPIC for Completion of Remaining Works at JRC, Boat Maintenance Workshop at DWS and Security Entrance Facilities and Installation of Well Head Sand Netting in Diyab & Jaleha within Dukhan Fields (Qatar Petroleum). The following works consist of the following : 1. Design, Engineering and Construction of Remaining Works (Civil, Electrical, HVAC, Fire Alarm & Detection System for Jinnan Recreation Club, Boat Maintenance Workshop at DWS and Security Entrance Facilities and Installation of Well Head Sand Netting in Diyab & Jaleha in Dukhan Fields. Contract No. 070154B0.

Various Platforms at ARAB D gas Recycling Plant within Dukhan Fields (Qatar Petroleum). The following works consist of the following : 1. Design, Supply and Installation of Access Ladders and Platforms at 15 locations. 2. Design, Supply and Construction / Installation of Lift / Elevator near LP Demethaniser Re-boilers. 3. Design, Supply and Installation of Lifting Facilities for PSV’s in area 92. Contract No. GC 08102500/FSD.

EPIC - Hard Landscaping & Miscellaneous Civil Works at ARAB D Plant within Dukhan Fields (Qatar Petroleum). The following works consist of the following : 1. Beautification Works at ARAB D Gas Recycling Plant. 2. Design, Supply and Construction of Drum Storage area. 3. Removal of existing Chemical Shelter, Design, Supply and Construction of new Chemical Shelter. Contract No. GC 08102900/FSD.

EPIC – Water Distribution Control System Upgrade within Dukhan Fields (Qatar Petroleum), 13 Locations (FNDS, FSDS, KSDS, QPAA, PWI-1, FSP, ARAB D, JTF, DDP, FNGLCS, FMDS, QPSFA & DSSA), Contract No. GTC/07/154/FSD.

EPIC - Miscellaneous Instrumentation Works in the Dukhan Fields (Qatar Petroleum), 11 PCR’s in different plant areas (ARBD – D, Khatiyah Main, Khatiyah North, Jaleha Main, Fahahil Main and Khuff Plant), Contract No. GTC/07/113/OED.

FSP Cooling Pond Reservoir Refurbishment Pond A & B shutdown works at Fahahil Stripping Plant (FSP). Contract no. GTC/05/191/FSD.

Responsibilities

Developing the detailed schedules for the EPIC phases of the project and interrogating inter-discipline schedule requirements and restraints to ensure logical work sequences across all discipline of the project (Primavera 3.1 /6.7, R8.2/ Excel).

Fully responsible for the project schedule in all discipline.

Update / Monitor weekly activities and resources at site.

Prepare various reports (update schedule, weekly progress report, two / three week’s look-ahead schedule, s-curves and invoicing, etc.) for submission to the owner.

Reports to the Project Manager.

Attend regular progress meeting.

Prepare and submit material submittal for owner approval.

Quantity estimates.

Prepare and submit Method Statement & Procedures for owner approval.

Project and Design Engineering consultant coordination works.

Follow up and monitor procurement & delivery of long lead materials in order to meet the schedule target.

Follow up all design documents / drawings deliverables from the Design Engineering Consultant for submission to the owner.

Review and submit all the design documents / drawings deliverables including as-built drawings received from Design Engineering consultant for the owner review and approval.

Follow up all concern issues, coordinate with other parties involve and resolve the issues in a short period of time that may not affect the progress of the project.

Check / Review all Project Dossier for submission to the owner for review and approval.

Prepare all Bid Tender schedule, manpower histogram, equipment schedule and S-curve.

Performed other duties that may require from time to time.

Raymond Saudi Arabia Ltd.

P.O. Box 1090, Al-Khobar 31952, Kingdom of Saudi Arabia

November 1995 – Dec 2007

Planning Engineer / Quantity Surveyor

List of Projects / Experience:

Underground Piping – Jubail Acetyls Complex

Saudi International Petrochemical Company (SIPCHEM)

Contract No. JAC-C-022B

The scope of work includes the installation of underground piping consisting of 32"Ø–24"Ø FRP seawater supply & return lines (2,156lm), 80"Ø–48"Ø FRP Cooling water supply & return lines (1,380lm), 18"Ø–6"Ø RTRP Firewater line (8,370lm) and 18"Ø RTRP Storm water line (475lm).

Seawater Laterals – Jubail Chevron Phillips

Contract No. JCP – 0097

The scope of work includes design, supply & installs 1.6m diameter FRP seawater return (310m) and supply (220m) lateral pipes between RC canals and Saudi Chevron Plant. Construction of 3 Nos. Manhole, installation of sluice gates, flow transmitter & flow transducer including expansion of outstation #23.

Inspection & Study of Existing Seawater Supply & Return Cement Lines Pipe above ground piping (Reactor I and II) for repair. Al-Jubail Petrochemical Company (KEMYA).

The scope of work includes the inspection of existing above ground piping of seawater supply and return lines at reactor I and II for repair, planning and scheduling, spool fabrication drawings, and list of materials.

Urea and Ammonia Plant (SAFCO III) / Underground GRP Piping (SAFCO IV), Saudi Arabian Fertilizer Company at Jubail Industrial City

The scope of work includes above ground piping and equipment installation, erection of transfer tower & conveyor for Urea and Ammonia including Sabtank, transfer tower & conveyor at Port area (SAFCO-III). Earthworks and installation of underground GRP piping for Seawater Cooling Tower Structure and Fire Water Line (SAFCO-IV). Other Civil works per job order issued by the client including logistic supports.

Rehabilitation of Seawater Canal Structures at SADAF Petrochemical Plant.

The scope of work includes the concrete repair, Material / Equipment procurement, Installation of Cathodic Protection System and Commissioning.

Rehabilitation of Qurayyah Power Plant Open Discharge Canal (SEC-ERB formerly SCECO)

The scope of work include the construction of 2.4km new canal wall adjacent to the existing wall, Equipment / Material procurement, Concrete repair of the Seal Weir Pits and Outfall structure, Installation of Cathodic Protection System and the subsequent commissioning.

Improvement of Sea Water Inlet & Other facilities at Qurayyah Power Plant, Saudi Electricity Company (SEC-ERB).

This project is divided into four (4) portions namely :

Portion I : Installation of 25/5 tons Semi Gantry Crane. The scope of work include Design and Construction of the Crane columns and foundations, material / equipment procurement and commissioning of 25/5 tons Semi Gantry Crane. The said Gantry Crane has a span of 36lm and a height of 16m.

Portion 2 : Installation of Twenty (20) units Continues Chain Rake Bar Screen. This project portion is the jelly control component of the whole power plant for both Phase 1 and 2. The scope of work include the Design, Procurement and Installation of the Continuous Chain Rake Bar Screen (CCRBS) and all conveyance facilities such as Flushing System, Stainless Trough, Concrete Channel, Disposal Pond and Commissioning.

Portion 3 : Concrete repair and installation of the Cathodic Protection System of the entire Seawater Intake Structure of the Power Plant. The scope of work includes Design, Installation, Equipment procurement, CP installation and Commissioning.

Portion 4 : Installation of the Cathodic Protection System of Four (4) 50m diameter Diesel Fuel Tanks. The scope of work include Design, Material / Equipment procurement, CP installation and commissioning.

Comprehensive Facility Improvement Phase I & II @ Hafar Al-Batin Complex, Saudi Electricity Company (SEC-ERB).

The scope of work includes the construction of steel raw water tank with a capacity of 650cu.m. Renovation of 2160 sq.m. Service Center Complex that involves the installation of fire protection and fire alarm system, lighting and power supply, communication system, HVAC system, plumbing system and all other civil work items. The subsequent site development such as irrigation and landscaping, installation of 4” dia. to 8” dia. fire water pipeline, installation of carbon and UV filter system, installation of fire water pumps, and the booster system for potable and irrigation water system and the asphalt paving of the whole complex covering an area of 30,000sqm.

Construction of Recreation Building, Media Center & Dammam Power Plant Security Gate House, Saudi Electricity Company (SEC-ERB).

The scope of work includes the construction of Recreation Building, Covered Swimming Pool Building, & Security Gatehouse, Outdoor Facilities consists of Tennis & Handball court, Children Playground, Parking area & Landscaping.

Rehabilitation of QRT-11, Saudi Aramco.

The scope of work includes the cement lining of 3000lm of 42”steel pipes & Installation of CIPP liner for 550lm pipes crossing the sea. Includes installation of cofferdams to rehab & install CIPP liner for pipes under the sea.

Responsibilities

Developing the detailed schedules of the project and interrogating inter-discipline schedule requirements and restraints to ensure logical work sequences across all discipline of the project (Primavera 3.1 / Excel).

Fully responsible for the project schedule in all discipline.

Update / Monitor weekly activities and resources at site.

Prepare various reports (update schedule, weekly progress report, two / three week’s look-ahead schedule, s-curves and invoicing, etc.) for submission to the owner.

Reports to the Project Manager.

Attend regular progress meeting.

Prepare and submit material submittal for owner approval.

Quantity estimates.

Project and Design Engineering coordination works.

Follow up and monitor procurement & delivery of long lead materials in order to meet the schedule target.

Follow up all design documents / drawings deliverables from the Design Engineering for submission to the owner.

Review and submit all the design documents / drawings deliverables including as-built drawings received from Design Engineering consultant for the owner review and approval.

Follow up all concern issues, coordinate with other parties involve and resolve the issues in a short period of time that may not affect the progress of the project.

Check / Review all Project Dossier for submission to the owner for review and approval.

Prepare all Bid Tender schedule, manpower histogram, equipment schedule and S-curve.

Performed other duties that may require from time to time.

Shinsung Corporation

Qatif, Kingdom of Saudi Arabia

November 1992 – May 1995:

Planning Engineer / Quantity Surveyor

List of Projects

Qatif Sports Center, Kingdom of Saudi Arabia.

The scope of work includes the construction of Sports hall Building, Grandstand Building, Security Gatehouses, Mosque & Outdoor Recreation Facilities, Parking areas & Landscaping.

Ilocos Norte Irrigation Project, Philippines, Construction of River Dike Protection, Irrigation Canals & its Appurtenant Structures.

The scope of work includes the construction of Protection Dikes along the Madongan River (downstream of Madongan Dam) and Construction of Irrigation Canals & its appurtenant structures in Madongan Irrigation area

Responsibilities

Planning and scheduling using project management tools (Primavera Dos version / Excel).

Update / Monitor progress accomplishment / manpower (weekly) at site.

Prepare various reports (update schedule, weekly progress report, two / three weeks look ahead schedule, s-curves and invoicing, etc.) for submission to the client.

Attend regular progress meeting.

Estimate quantities for verification as to specification & drawing issued for construction.

Performed other duties that may require from time to time.

A.J. Taylan Construction Corporation

Laoag City, Ilocos Norte, Philippines

Construction of Laoag Allacapan Road Improvement Project

July 1992 to November 1992

Civil Engineer

National Irrigation Administration, Ilocos Norte, Philippines

Construction of Communal Diversion Dam

November 1989 – June 1992

Project In-Charge

T. Sales Bros. Const. Incorporation

Laoag City, Philippines

Construction of Irrigation Canal & Its Appurtenant Structures

June 1984 – October 1989

Civil Engineer

Responsibilities:

Prepare construction schedule using Excel.

Update / Monitor progress accomplishment (weekly).

Prepare various reports (forecast, progress accomplishment, invoicing, etc.) for submission to the owner.

Attend regular progress meeting.

Estimate quantities for verification as to specification & drawing issued for construction.

Supervise the overall construction of Diversion Dam and its appurtenant structures.

Enhance the participation of farmer irrigator’s association in the implementation and maintenance of the project.

Prepare payroll for labor contractor in the construction of the dam.

Performed other duties that may require from time to time.

SEMINARS & TRAININGS:

Internal Quality Auditing (ISO 9001 : 2000)

Saudi Arabia on 03 – 04 July 2002

Conducted by National Inspection & Technical Tsting

Co. Ltd. (FAHSS/TUV)

Planning & Controlling with Primavera Enterprise v. 3.0 19 – 22 October 2002

Conducted by PrimArabia (Premier Management Technologies)

Safety Awareness Training Course

MARAFIQ, CHEVRON, KEMYA, SADAF, SEC-ERB, ARAMCO, QP Dukhan (Qatar Petroleum)

Confined Spaced Training Course

Primavera 6.7 for Project Management

CHEVRON

8 Nov 2013 to 24 Jan 2014 (40hours/PDU’s) Chicago

Training Center at Doha Qatar

PERSONAL INFORMATION:

Address : No. 13 Baay, Batac, Ilocos Norte, 2906 Philippines

Civil Status : Married

Date of Birth : October 11, 1960

Nationality : Filipino

Email Address : ac3pe7@r.postjobfree.com

Mobile Phone : +639*********

Passport No. : EC1520404

EDUCATION:

University of Pangasinan

Dagupan City, Pangasinan, Philippines

1977 to 1982 – Graduate

Bachelor of Science in Civil Engineer (BSCE)

Licensure examination for Civil Engineer : 1983

Registered Civil Engineer

SKILLS:

Microsoft Word, Microsoft Excel

Primavera 3.1, Primavera Enterprise 3.1

Microsoft Dynamics GP 9.0 Professional