Post Job Free

Resume

Sign in

I am a Civil Engineer with experience in Civil Work above 15 years.

Location:
Lagos, LA, Nigeria
Salary:
N300,000k
Posted:
December 12, 2017

Contact this candidate

Resume:

CURRICULUM VITAE

NAME: AKERELE OLUSOLA TEMIDAYO

DATE OF BIRTH: 4TH APRIL, 1971

SEX: MALE

STATE OF ORIGIN: EKITI

NATIONALITY: NIGERIAN

MARITAL STATUS: MARRIED

CONTACT ADDRESS: P.O.BOX 9465, GARKI, ABUJA

RESIDENTIAL CONTACT: FLAT 12, NATIONAL ASSEMBLY,

QUARTERS, F.H.A., LUGBE, ABUJA.

TELEPHONE NOS: 080********, 080********,097831020

E-MAIL ADDRESS: ac3ort@r.postjobfree.com,ac3ort@r.postjobfree.com ACADEMIC QUALIFICATION (INSTITUTION) WITH DATES:

Post Graduate Diploma in Civil Engineering (FUTA) – 2015.

* POST-GRADUATE DIPLOMA IN MANAGEMENT (P.G.D

MANAGEMENT) ABUBAKAR TAFAWA BALEWA UNIVERSITY

BAUCHI 2001

* HIGHER NATIONAL DIPLOMA (HND) IN CIVIL

ENGINEERING FEDERAL POLYTECHNIC, BIDA,

NIGER STATE 1996

* NATIONAL DIPLOMA IN CIVIL ENGINEERING

FEDERAL POLYTECHNIC, ADO-EKITI, EKITI STATE 1993

* WASCE-CONTINOUS EDUCATION CENTRE, AKURE 1991

* COMPUTER LITERACY

MS OFFICE PACKAGE AND EXCEL PROFICIENT, MS PROJECT PROFICIENT,AUTO CARD COMPLIANCE.

* REGISTRATION (COREN).

JOB EXPERIENCE HISTORY

* Project: Construction of Ship Building Facility and Dockyard at Okerenkoko, Warri South Local Government Area, Delta State.

- CLIENT: Nigeria Maritime Administration and Safety Agency (NIMASA) Federal Ministry of Transportation, Abuja.

- EMPLOYER: Kakatar CE Ltd, The Clan Place, Plot 1386, Tigris Crescent, Off Aguiyi Ironsi Street, Maitama, Abuja. Designation: Project Manager.

Job Description: Project item include construction of road and parking lots, Helipad, concrete wall and Clarion C-tru wire fence perimeter (2km, 350m), pavement and open storage areas and quay wall (sheet piles from Ancellomital Luxemborg, France).

Task: Task involves Planning, Mobilization, Timelines, Construction method and Technology, Material sourcing, personnel sourcing, Project Management, Representing employer Kakatar CE Ltd in meeting with the Client NIMASA, organizing meetings with the consultants, safety standards and conclusive atmosphere in reaction to the host community, preparation of certificates and reporting to the managing Director and entire management

(Sept 2014 –Till date).

PROJECT: Dualization of Ahoada-Omoku-Oguta-Izombe road,River/Imo State

(80 KM ).

CLIENT: NDDC

EMPLOYER: Inter- Bau Construction Ltd,12B,Lugard Avenue,Ikoyi,Lagos.. Job Designation: Project Manager tasks as above, in addition with rubbing mind with the company community relation officer CLO to curtail the excesses of the youths associations, various interest groups, traditional institutions making sure the project sees the light of the day. ( Jan.2011-Sept 2014.). Project: GREEN FIELD PROJECT Construction of a twin 3- floors high rise buildings comprises of two bedroom apartment of 16 flats on each building, service quarters, club house which houses the gym, club apartment, pool control base, Construction of swimming pool 18metres by 6metres( 3 feet at shallow end 6 feet height at deep end), estate roads, underground drains which includes earthwork base of which asphalt of 40mm laid and rolled to 30mm, construction of 20 thousand litres capacity overhead tank base and erection of its 8no of I steel station 12 metres height, construction of underground 10 thousands litres capacity, drilling of industrial bore hole-depth 80m Cassin & size 150m,static water level 5m,submersible pump2.2kw,3 phase Grundfos pump,and installation depth of 50metres.Construction of standard lawn tennis court,earthworks base material with asphalt wearing course laid at 40mm to rolled to 30mm fenced round with barb net 6 metres high.. Supervision of Mechanical & Electrical of the above named structures located at Boskel road, opposite Intels Group, Aba road, PortHarcourt, River State.

Client:Orwel and gas company,Trans-Amadi layout,PortHarcourt,River State. Job Designation: Project manager, task as above, in-addition, schedule of meetings with client,sub-contractors and consultants, preparation and alterations of program of works using Microsoft project, daily report to the managing director and the head of projects,minutes of site meetings copying all stake holders involved in the project via electronics mail and general supervision of all activities on the site, coordinates activities of the sub-contractors on site, checking all their drawings making sure that it conforms with what is being done on site milestones to milestones,working with construction safety standard as regards to site operations practice code in all project mentioned above.( March 2009 to Dec. 2010).

PROJECT: The Rehabilitation of Ogbomoso-Oko-Ilogbo–Osogbo 75km Road in Oyo/Osun State,Federal Route No 35A Contract No 6031. Client:Federal Ministry of Works, Housing & Urban Development,Mabushi,Abuja. Employer: Dutum company ltd,Isaac place,Onireke,Ibadan. Project Designation: SITE AGENT, Tasks involves coordinating the sub- contractors on concrete works, Planning of the projects i.e preparation of program of works on concrete works,earthworks,and asphalt of the entire road,joint measurements of works where needs be with client representative, ordering of some construction materials such as cement, reinforcements with standard compliance, setting up a quarry for crushing activities and asphalt plant in ready for production, supervision of laboratory tests as required carrying the R.E along, Relating with the client principal residential engineer and the engineering representative on site, preparation of valuation as regards to the milestones, Meetings with the federal controller,(HIGHWAYS) on site visits. Supervision of the plants operators on site, ensure maximum output from the personnel’s, identified problems and challenges ahead of time and the possible way out, relating well with host community and establish a good relationship, proper coordination of the project surveyors, project engineers and supervisors, reports to the company authority on daily, weekly and monthly basis via e-mail among others. (Feb. 2010

– Nov. 2010).

Project: Construction of 33.9km Ijan Ekiti – Ise Ekiti – Uso Boundary road. Client: Ekiti State Ministry of Works

Job Description: Construction of 33.9km Ijan Ekit – Ise Ekiti – Uso Boundary road, Ekiti State Government, 4120 metres line drains, 14 no of pipe culverts, 7 no of box culverts, stone based 60mm and asphalt 30mm thickness. Employer: Dekit Construction Ltd, No 7 Yelinga Street, Wuse 2, Abuja. Job Designation: Project Manager and duties as same as above. (July 2007 – March 2008).

Project: Construction of multipurpose edifice, (HANDEF) Handicap development educational fund, consisting of modern lecture rooms equipped with leaning aid for the disabled, six well equipped offices, play fields, car parks and other recreation facilities.

- CLIENT: Ondo State Government, Akure

- EMPLOYER: Afram Engineering Ltd. U1, Cuda Complex, Alagbaka Estate, Akure.

Job Designation: Project Manager, Task involve the recruitment of personnel sourcing for plants and materials, cut and fill (earthworks) supervision of setting out of the building with (Global positioning system) Supervision of reinforcement and concrete of the foundation with raft foundation 1,875 square metres, supervision of the columns and beams, partition walls, doors and window openings, roofing of the structure with long span aluminum, entrance culvert stone pitching design and supervision, taking levels carrying the land surveyor along to channel the water course, external works of the structure, fencing, car parks with earthworks 2,856.5sqm, priming and asphalting thickness 30mm,measurements and raising of certificates and handing over to the government. (Jan 2007 – June 2007).

* Project: Construction of 29 duplexes semidetached buildings in phase II of estate development, construction of 1.2km collector road and 8.3km minor roadway of various designs, foul sewer line, storm water line and 3 nos. of 2 cell pre-cast culverts of the same design in a water lodged terrain.

- EMPLOYER: Adkan Service Nigerian Ltd. (Estate Developer) Suncity, Galadima Airport Road, Abuja.

Job Designation: Project Manager, (construction) task involve recruitment of personnel, sourcing for the plants and machinery, monitoring the sub contractors on construction of the 29 numbers of duplexes semidetached, materials and modus operandi of the buildings be constructed, setting out of the buildings with Global Positioning System Interpreting the drawing along with the surveyor, setting out the roads, foul and storm water line, in line with the land surveyor using Global Positioning System and level Instrument simultaneously. Earthwork i.e cut and fill on the roads, excavation of the foul and storm water trenches monitoring the alignment and the levels as in carrying the surveyor along in the decision taken on site, setting out the 3 nos. of 2 cell precast culvert foundation, concrete and setting the pre-cast elements and back filling. Placing the pipes and the rings for foul sewer and the storm water line preparation of work program, co-ordination of site meetings delegation of authority or assigning job for engineers and reporting to the Managing Director. (Jan 2006-Dec 2006.

* Project: Construction of 1.2km foul sewer line and water canalization of the same length by IBB Golf Course Maitama, Abuja.

- CLIENT: F.C.D.A. Abuja

- EMPLOYER: Zef Nig. Ltd.,Opposite V.I.O.Mpape-AYA Road, Abuja. Project Designation: Project Manager task involve recruitment of personnel, sourcing for the plants and machinery, yard office for the company relocating from Lagos, sourcing for the pipes 200mm,design and supervision of fabrication of manholes mould according to the design, supervision of precast elements. Excavation of the foul trenches, Excavation of 1.2km length of canal of 9 meters trapezoidal shape, preparation of wok programme, measurement and preparation of certificates, attending meetings with the F.C.D.A official both on site and in their office, delegation of authority to the engineers and surveyors and reporting to the Managing Director. (July 2005-2006 Dec).

* Project: Construction of cement factory roads and other Infrastructures facilities at Calabar.

- CLIENT: Orascom International Limited

- EMPLOYER: Atmon Nig. Ltd Parliamentary Road Calabar, Cross River State.

Job Description: Project Manager, task involves recruitment of personnel, sourcing for plants and machinery, Timing, Budgeting, project evaluation and variation, setting out and opening up the roadway, drainage facilities and making sure that site activities conforms with the design. Oversee all site operation, preparation of work programme and progress report. Delegation of authority to the site engineers in each field i.e., earthwork, concrete, and surveying, preparation of certificates and valuations, attending meetings with project team manager, project coordinator and General Manager of Orascom Ltd as well as taking decision on behalf of the company report to the Chief Executive Officer. (2004-Dec-2005 June).

* Project: Construction of 3.02km single carriage way, 3nos, single cell box culvert (in-situ);concrete and reinforcement, car parks, and other Infrastructures facilities.

- CLIENT: National Hospital, Abuja (ancillary Project Doctor’s quarters)

- EMPLOYER: Transvari Services Nig. Ltd. Suite 618,.619 Transcorp Hilton Hotel, Abuja

Job Designation: Project Manager as in No. 5 above, participated in the design amendment and construction, oversee all site operation i.e earthworks, Kerb work, U open drainage, 3 nos. single cell box culvert 3m x 2.5m

(reinforcement and concrete) cost analysis, budgeting, project evaluation and variation, preparation of certificates, preparation of work programme and progress report. Asphalt operation both binder and wearing courses, taking decision on behalf of the company at various site meetings with task force committee. Reporting the Managing Director (Nov 2002-2004 Dec).

* Project: Construction of 3.60km Armory Dump road at Nigeria Air force base. Makurdi, Benue State.

- CLIENT: Nigeria Air force, Area 8, Abuja

- EMPLOYER: Mico International Nig. Ltd. Wuse II. Abuja Job Description: Project Manager, design and construction of a minor access and having a width of 15metres including carriage way, shoulder, verge and U drainage, tasks involves sourcing for plants, materials and personnel, setting out the drain and re-alignment of the existing road to the Dump. Clearing, cut and fill, oversees all site operation, cost analysis, budgeting, project evaluation and variation, preparation of work programme & progress report site meetings with Nigerian Air force task force committee on construction and reporting to the Managing Director (Nov.2001-2002 Nov).

* Project: Construction of 4nos of Duplexes, construction of pipeline Infrastructures (foul sewer and storm water line) of various design and Estate roads. At Gudu District Apo Legislative Quarters, Abuja.

-

- CLIENT: Federal Capital Development Authority (F.C.D.A) Abuja.

- EMPLOYER: Arab Contractor O.A.O Nig. Ltd.,

Utako District, Abuja.

Job Designation: Site Engineer, task involves, concrete and reinforcement of the structures, determination of foul and storm line alignment, Excavation of foul and storm into consideration. Laying and fixing of the PVC pipe 200mm for foul sewer and concrete pipe 600mm for storm water lines. Earthwork of the estate road, stone base and its Asphalt. Site report to the project Engineer (Feb.1999- 2001 Nov.).

* Project: Construction of District dual carriageway single carriage roadways, pre-cast culverts of various designs (determination of roads, median and Kerb alignment in relation to surveyors data and general supervision conforming with the design)

* project: Construction of highly reinforced concrete sub-base for Power sub- station at Utako District,Abuja.

- CLIENT: Federal Capital Development Authority (F.C.D.A) Abuja.

- EMPLOYER: Arab Contractor O.A.O Nig. Ltd.,

Utako District, Abuja.

Job Description: Site Engineer, participate in the design amendment and construction of various roads namely: Arterial road, collector roads and special important local street roads at Utako District total to 26.82km in length and various road width according to the design, task involves road earthwork with suitable materials, compaction of such with adequate medium at intervals, grading of the road with the slope percentage according to the design, laying of stone base taking recognizance of the thickness of Asphalt and laying of the Asphalt both binder and wearing courses. Construction of power sub –station saddled with responsibility of interpreting the structural design and placement of reinforcements in its right positions, supervision of concrete pouring of the same with industrial concrete grade 20.

EMPLOYER: Portland Construction ltd,a subsidiary of Porltland paint and product Nig.Plc.4th floor, Elephant House,Alausa,Ikeja. Lagos State.

* Project: Construction of 4 nos, of Duplexes, Construction of Infrastructures, Estate road, Car parks and Water

canalization.

- CLIENT: Jof Nig. Ltd., Ikorodu Road, Lagos.

- EMPLOYER: SMACE Nig Ltd., Onipanu, Lagos (1997)

Job Designation: Site Engineer Scope of Work Comprises of concrete and reinforcement of the structures, Earthworks: laying of binder course of Asphalt and supervision of Estate drainage and reporting to the project manager all site activities.

* Project: Construction of 45.7km Single carriage roadway, 3 box culverts

(cast-in-site) single cell 8 nos. of pipe culverts, single cell road side drainage within the towns and stone pitching where necessary along Asaba-ebu- Iyelen road. Delta State.

- CLIENT: Federal Ministry of Works and Housing

- EMPLOYER: Sparklight Nig. Lt., Opic Estate,Lagos –Sagamu way, Lagos.

Job Designation: Site Engineer, scope of work include Earthwork, laying of Asphalt, (binder and wearing courses) Feb.1998- 1999Jan (NYSC).

JOURNALS WRIITEN FOR PUBLICATIONS.

Causes of bituminous /interlock pavement failures and possible solutions Effective project management in civil engineering. COURSES AND TRAINING ATTENDED.

Microsoft project proficiency.

Effective planning and project implementation.

Effective cost management in infrastructure development in Nigeria. Green Field Project Management in civil / building industry. Geotechnical surveying, Soil test and the importance in civil engineering projects, Land surveying using new Global positioning system for accuracy. Construction / Industrial Safety standard operation courses. Week Training in Production of Sheet Piles in Ancilomital Sheet Pile Production Company, Luxembourg.

OBJECTIVES: Olusola Akerele has what it takes to move an organization forward with their set goals, being proactive and a goal getter, a fast learner, respect organization Authority abiding by the rules and regulation of such, believing there must be a way out of challenges and can deliver any given task under pressure.

SPECIAL INTEREST: have passion for job tendering which I have been involved with some companies I have worked with proofs. Anyhow or anywhere, we must be busy working keeping the company interest at heart, getting it right the first time of quality work done and making the firm economically buoyant. INTEREST: Challenges, Research and adventure.

REFEREES

Mrs. Grace Jones Akerele

Senate Department

Committee on National Security and Intelligence

National Assembly, Abuja.

080********.

Arch. Sani Gidado

Chairman, Presidential Committee on Barrack Rehabilitation,

(P.C.B.R), Area 8, Abuja.

Senator Nuhu Aliyu (RTD DIG POLICE)

Senate Chairman, Committee on National Security & Intelligence Senate, National Assembly, Abuja



Contact this candidate