Post Job Free
Sign in

Quality Control, Material, Project Coordination & Audit

Location:
Doha, Qatar
Salary:
9000 QAR
Posted:
December 13, 2017

Contact this candidate

Resume:

CAREER OBJECTIVE

To be a dynamic professional with the aim of continuous growth in career & personal life while living the prized life on healthy terms.

SUMMARY

Graduate Civil Engineering with more than 5 years of experience, first as GET then as an Engineer in Steel Industry (Durgapur Steel Plant), then as QA/QC Engineer in Export Gas Compression Facilities Upgrade Project & Third Party Gas Interconnecting Facility project inside Ras Laffan Industrial City (State of Qatar) for Dolphin Energy Projects. Currently working in 2520 MW Power Plant Project of UHP IWPP at Al Wakrah, Qatar as QC

& Procurement Engineer.

I have witnessed the diverse nature of transition from Steel industry to Oil & Gas & now in Combine cycle Power Plant.

Total Experience 5+ Years Experience as a Project Engineer 5+ Years Experience as a QC Engineer 4+ Years Experience in Material Approval / Procurement 2+ Years SKILL / KNOWLEDGE

TANMOY PAUL

Mobile No.: +974-****-**** (Qatar)

E-mail id: ****.**********@*****.***

Passport Number: H6166198

Expiry Date: 18/08/2019

QUALITY CONTROL &

ASSURANCE

MATERIAL APPROVAL FROM CLIENT SITE EXECUTION

QA/QC DOCUMENTATION AS

PER QMS 9001-2008

PROJECT COORDINATION (RELATED TO

MATERIAL) WITH CLIENT/OE

BUILDING FINISHING

COORDINATOR

INTERNAL & EXTERNAL AUDIT

COORDINATION WITH EXTERNAL

SUPPLIER/CONTRACTOR FOR PROPER EXCECUTION

OF JOB AS PER CLIENT’S REQUIREMENT

AUTO CAD DRAWING

IMPLEMENTATION OF NEW

QMS 9001-2015

MATERIAL PROCUREMENT

BASIC STAAD PRO

DESIHNING

SITE QC INSPECTOR, SITE

QUALITY CONTROL &

TRAINING

QMS LEAD AUDITOR ISO 9001-2015 QUANTITY SURVEYING

CONSTRUCTION CODES

(QCS-2014, IS CODES & BS)

PUNCH LIST COORDINATOR RECONCILIATION

WORK EXPERIENCE

1) QA/QC & Procurement Engineer in Simplex Infrastructure Limited, State of Qatar September’2015 – Present

Project: UHP IWPP Project, 2520 MW Power Plant Project Project Cost: 250 Million Qatari Riyal

Client: Samsung C&T

Consultant: Mott McDonald

Owner: Umm Al Houl Power (UHP)

Roles & Responsibilities:

• Responsible for Material Approval for all the items related to our scope to be used at the project.

• Co-ordination with Main Contractor & Owner’s Engineer at regular basis to streamline the process of approval & other site related activities. Coordination with client on regular basis to deliver the exact material as per the project requirement.

• Co-ordinate with vendors & procurement team for proper flow of material according to the schedule. Taking approval of Shop Drawings & other documents related to the proper execution of project.

• Monitoring the material transit & inspection prior to final use at site.

• Monitoring the proper installation of the material as per approved Method Statement.

• Part of Internal Lead Auditor team for the Implementation of new QMS ISO 9001-2015, through training, awareness and new documentation.

• Preparation of Inspection Test Plan.

• Preparation of Method Statement.

• Preparations of MAR and monitor material testing.

• Site Inspection, Site Quality Control & Training.

• Material Approval for the project related items.

• Quality Training

• Internal Auditor & Audi tee at External Audit

• Maintaining & Conducting all the material Testing used at site, viz, Concrete, Grout, Blocks, Tiles, Gravel, Water etc.

• Coordination of Punch list, joint inspection for punch list closure with client & vendor.

• Preparation of RFI.

Highlights:

Completing 90 percent of the project within 26 months with continuous support from Samsung C&T & Client UHP, despite of the embargo & blockage of materials. 2) QA/QC Engineer in Simplex Infrastructure Limited, State of Qatar July’2014 – August 2015 Project: Third Party Gas Line Interconnecting Facility Project Project Cost: 20 Million Qatari Riyal

Client: L&T Hydrocarbon

Principal Client: Dolphin Energy Limited, State of Qatar Roles & Responsibilities:

• Preparation of documentation as per approved ITP

• Preparation of RFI.

• Preparation of Method Statement.

• Preparations of MAR and monitor material testing.

• Prepare and submission of Daily, Weekly and Monthly quality performance reports.

• Ensure all incoming materials inspected and stamped as per approved material.

• Responsible for all QA/QC related job of the project.

• Verify that works on site are executed according to the last version of IFC Drawing

• Site concrete checking as per mix design.

• Ensure that all inspection are done as per inspection schedule and test plan/contract and that these are documented on predefined format/check sheet.

• Co ordinates with client’s QC Inspector for the resolution of site problems.

• Assist QA/QC Manager/Team Leader on resolutions of Quality issues.

• Ensure proper interaction and coordination with COMPANY (DEL), site laboratory and site team for project coordination.

3) QA/QC Engineer in Simplex Infrastructure Limited, State of Qatar July’2014 – June’2015 Project: Export Gas Compression Facilities Upgrade Client: L&T Hydrocarbon

Project Cost: 50 Million Qatari Riyal.

Principal Client: Dolphin Energy Limited, State of Qatar Role:

• Assisting Senior QA/QC Engineer.

• Preparation of documentation as per approved ITP

• Preparation of RFI.

• Preparations of MAR.

• Ensure all incoming materials inspected and stamped as per approved material.

• Responsible for all QA/QC related job of the project.

• Verify that works on site are executed according to the last version of IFC Drawing

• Site concrete checking as per mix design.

• Ensure that all inspection are done as per inspection schedule and test plan/contract and that these are documented on predefined format/check sheet.

• Co ordinates with client’s QC Inspector for the resolution of site problems.

• Assist QA/QC Manager/Team Leader on resolutions of Quality issues.

• Ensure proper interaction and coordination client, main contractor, site laboratory and site team for project coordination.

• Preparing Red Line Mark up drawings as per site condition

• Preparing final Hand over Documents for final Phase of the project. 4 ) Engineer in Stewarts & Lloyds of India Ltd. March 2013 – July’014 Project: Inter Plant Pipe Line Project & Cooling Tower Project. Project Cost: 50 Crores INR

Client: Steel Authority of India Limited, India

Role:

• Only Civil Engineer at site looking after entire execution and planning of civil and structural job of a Interplant Pipe Line, Cooling Tower job at DSP,SAIL,INDIA

• Positioned as a project coordinator between client and engineering department.

• Witness all the Inspection and testing on site and laboratory along with consultant/client.

• Coordinates the implementation of the sub contractor quality control on site.

• Inspection of all civil engineering activities with site foreman and consultant.

• Reports weekly quality performance and documentation and quality trends statistical data to quality manager.

• Register and update all laboratory testing.

• Dealing with sub contractor for final rate finalization at the start of the company’s new project. Brief stint at company’s tender division.

• Preparing BBS, modifying drawings (both civil and structural), quantity surveying, preparing and submitting new route layout by working with the surveyor.

• Billing of both subcontractor and client.

• Daily basis client correspondence with daily and weekly basis planning submission. Highlights:

• Achieving client’s trust to cent percent, have freedom to work on my way maintaining both quality and costing.

• Completing cent percent of the job on a given route which was feed with major hindrances underneath the ground & revising the entire route through a critical corridor which ultimately saved ample time & costing.

5) Graduate Engineering Trainee in Jain Infraprojects Limited,India July 2012 –Feb’2013 Project: Inter Plant Pipe Line Project & Air Compressor Project. Project Cost: 40 Crores INR

Client: Steel Authority of India Limited, India

• Worked as a Execution Engineer for a Inter Plant Pipe Line & Air Compressor Project inside Durgapur Steel Plant(SAIL).Looked after the entire civil job under my senior’s assistance. Prepared BBS, certify bills,and modify structural designs as per site requirements. 6) Summer training at “Senbo Engineering Limited” on 2011

• Assisted Sr. Site engineer for a period of 1 month in the Nagerbazar Flyover project in Kolkata.

• During the stint I was posted at fabrication yard as well as at site. Witnessed Deck slab rod binding, shuttering and casting.

7) Summer training at PWD on 2010

• Trained under Chief Engineer of PWD at a 8 storied hostel building site at Kolkata,India. EDUCATION

• Bachelor in Technology in Civil Engineering from Camellia School of Engineering & Technology Under West Bengal University of Technology (2008-2012) DGPA: 9.19

• Intermediate (2008)

H.S. (Class XII): South Suburban High School(MAIN). Aggregate Percentage: 72%

• SSC (2006)

Madhyamik (Class X): Nava Nalanda High School, Kolkata. Aggregate Percentage: 74% ADDITIONAL INFORMATION

• Completed & Passed IRCA Certified QMS Lead Auditor Training from Bureau VERITAS- ISO 9001-2015.

• PROFFESIONAL BODY MEMBERSHIP

ASSOCIATE MEMBER OF INSTITUTE OF ENGINEERS

Membership Number – AM 176008-7

SOFTWARE SKILL

• STAAD PRO (Certified course from CADD centre Jadavpur University)

• AUTO CAD

• Proficient in MS Office & C language.

TRAININGS ATTENDED

• Dolphin Energy Limited – Safety, Health, health, Environmental Awareness Program – August’2014.

• Basic H2S Training program, confined space training, commissioning training. PERSONAL DEATAILS:

Date of Birth: 19th October 1990

Father’s Name: Dilip Kumar Paul

Marital Status: Unmarried

Languages known: English, Bengali, Hindi

Place: Doha, Qatar

Date: 19th November 2017



Contact this candidate