Pullatikurthi Praveen chand
House no * Madavanagar . Ponneri, Thiruvallur DT 601204 Tamil nadu India
• Contact No : 09840709520.09444298407.09444239158 • Email : ***.***@*****.***
Objective
To obtain a challenging position in a high quality engineering environment where my resourceful
experience and academic skills will add value to organizational operations
Education Details
• MBA marketing, Annamalai University Chidambaram Tamil nadu India 92%
Year of Pass 2010
Objective
• BBA Computer application (ms office), Annamalai University Chidambaram
Tamil nadu India 98 % Year of Pass 2008
Objective
• Installation of 840 D Siemens Simodrive, Siemens Ltd Bangalore India 98 %
Year of Pass 2006
Objective
• Advance training in Mechatronics, CVAT Vanagaram Chennai Tamil nadu India 98 %
Year of Pass 2005
Objective
• Diploma in Electronics, HIET Guindy Chennai Tamil nadu India 98 %
Year of Pass 1984
Objective
• SSLC, Government Higher Secondary school Ponneri Thiruvallur DT Tamil nadu India 40 %
Year of Pass 1979
Objective
Work Experience
• Sanjeevi Paint and pigment varnish company
Manager
Aug 1984 - Jul 1986
OVERALL CONTROL
• Ashok Leyland Ltd
Maintenance Technician Electrical Department
Aug 1992 - Aug 2003
attending faults in Hoiests,Lathe mechines, Substation maintenance
• Ashok Leyland
Technician Mechatronics
Aug 2003 - till date
attending faults in CNC mechines .
Project Details
PROJECT : 1
• Satillite Comunication
Inter link satellite for continues Television reciption
Period : 3 months Team Size:
Role : Period 1984
Objective
PROJECT : 2
• Quality Circle Improve 2003
Improvent in High speed Drive motor serviced in house
Period : 2 months won CCQC,NCQC cirtification Team Size:
Role : Cost savings. Time saving
Objective
PROJECT : 3
• Improve 2004 CCQC,NCQC
Modification of Lubrication system inTraub CNC Mechine
Period : Three months Team Size:
Role : In house development of Lubrication pump
Objective
PROJECT : 4
• QC Improve Presentation 2005
Old Electrical Logic changed to PLC logic in Reshiour automatic Lathe
Period : 4 months Team Size:
Role : Team Leader
Objective
PROJECT : 5
• Improve 2006
Effective Clamping of Component in NAGEL Honing mechine
Period : project time 3 months Team Size:
Role : Improvent
Objective
PROJECT : 6
• Improvement 2007
Facility Improvement in camshaft line OEE,5S
Period : 4Months Team Size:
Role : Improving overall efficiency of the Line
Objective
PROJECT : 7
• Improve 2008
Improve efficiency of the Engine block washing machine and mistake proofing ( pokayoke)
Period : 5 months, Completed in 3 months Team Size:
Role : Improve efficiency of the mechine
Objective
PROJECT : 8
• Improve 2009
PU plugs damaging in leak test mechine in Engine Head line
Period : 2 months Team Size:
Role : Pressure corrections done by seperating Hydraulic circuit in the SPM
Objective
PROJECT : 9
• Improve 2010
Semi automatic mechine conversation to fully automatic mechine to avoid Human error and
rework
Period : 2 months Team Size:
Role : Component stopper to be automated and confirmation of bush pressed on the
component
Objective
PROJECT : 10
• Improve 2011
To save Neat Cutting oil from the Engine Block and avoid contamination of oil in next
opprations
Period : 6months Team Size:
Role : Designed an Oil draining mechine to drain oil from the component
Objective
PROJECT : 11
• Improve 2012
Oil leak in Protek CNC twin turret turning centre Setup change fixture lock
Period : 2 months Team Size:
Role : Found blow holes in fixture Block provided a plate with O ring at the area
Objective
PROJECT : 12
• Improve 2013
In built Oil drainer Modification done to increase the efficiency of the Nagel Honing
mechine
Period : 4 months Team Size:
Role : Mechanically redesigned and removed drag chain and intigrated the Electrical
pneumatic Lines
Objective
PROJECT : 13
• Improve 2014
Reducing power consumption by eleminating multiple operations
Period : 6 months Team Size:
Role : Oil centrifugal unit eleminated .Found repair cost is more and in break down period
the oil is draining by the chip convayour and remaining 5% is drained by the centrifugal
mechine .30% power saved maintenance labur and spares cost saved
Objective
PROJECT : 14
• Improve 2015
Environmental problem after Boaring of Engine Block
Period : 3 months Team Size:
Role : Designed a 45" Lifter to drain coolant from camshaft hole .and to improve 5S in that
area
Objective
PROJECT : 15
• Improve 2016
Electrical panel Redesign and repositioning to improve 5S and reducing Mechine breakdown
hours
Period : 4Months Team Size:
Role : New Electrical pannel is designed and repositioning of switches to fecilitate easy
Access for attending breakdown and to fecilitate Operator for an easy Operating Condition
of the Mechine and reduces breakdown hours
Objective
PROJECT : 16
• Improve 2017
Makino Coolant filters not Effective
Period : 2 Months Team Size:
Role : Washing the Filters Manually is not available Effective So an Automated mechine is
designed to improve the quality of filter candle Cleaning
Objective
Field of Interests
• Maintenance, Management
Skills
• Research and creation Modification for 24X7 fail proof function of equipment
Strength & Hobbies
• Creating new ideas for need of the hour
• Creating ppt presentations
Reference
V Arumuga Nambi
Senior Manager
Ashok Leyland Ltd Ennore Chennai 57 India
*******.***@************.***
dcx
Declaration
I hereby declare that the above mentioned details are true to the best of my knowledge.
gbgb
Date : 2017
Place : Ponneri Thiruvallur DT Tamil nadu
(Pullatikurthi Praveen chand)