Post Job Free

Resume

Sign in

Engineer Project Manager

Location:
Schaumburg, IL
Salary:
50,000 +
Posted:
November 24, 2017

Contact this candidate

Resume:

Gilbert Daniel November- ****

*

Gilbert Daniel

Cell: 630-***-**** / ac3gxk@r.postjobfree.com

Educations & Qualifications:

**** – 1997 University of East London (London – England) B.Sc Eng. degree in Civil Engineering.

1998 – 1998 Ealing Collage (London –England)

Two machine Video Editing

1979 – 1982

University of Technology

B.Sc. in Building and Construction Engineering.

2014 – 2014

PMP Project management tools & techniques coarse

2007 - 2007 Management & Planning course (Primavera CourseP6) 1994 - 1995 Computer programming course

IT knowledge, Q-Basic, all Microsoft, HTML, Auto-Cad, Photoshop & Primavera-P6.

PERSONAL PROFILE:

o Highly motivated Engineer, with over 25 years hands on of good experience & multi task skills to work as part of a team or independently in a leading-edge of different construction, Engineering, TV broadcasting Channels & Graphic and digital printing at director’s level with strong of Computer skills background. o Five years of experience in construction & site management of high and low rise buildings in Dubai within the Oil & Gas sites.

o Strong ability to communicate technical information to non- technical personnel. o Good experience of running multi-disciplinary activities covering all aspects from initial design stage, planning and programme, client liaison; to execution and commercial settlement in media business and local authorities. o Specific knowledge in planning of construction project using Primavera P6. o I am bilingual; speak fluently, English, Arabic, Assyrian (Aramaic) & Yugoslavian. Gilbert Daniel November- 2017

2

PROFESSIONAL EXPERIENCE

Al-Sahraa Group, Project Manager Dec. 2012 – Aug. 2017 Project Manager

Multiple functional Engineering group, who focus on consulting & contracting in the Civil & Electromechanical, Equipment and Machines trading industry. Multi task projects within the Oil & Gas field in UAE. Design and build 66 tubular steel towers up to 360 ft M in height, for each site which includes construction of control room, small substations. Internal roads construction & roundabout was also involved within mountain area, construct a special security fence surrounding each site, sewage system and electrical trenches for different type of electric and fiber Optic cables.

Managed multi construction sites; planned scheduled, procurement, monitored and coordinated all site activities.

Monitored performance of team of 50 employees and sub-contractors; insured that schedules were on time and under budget without compromising system performance.

Managed cash flow and budget control; prepared and follow up the invoices & payments

Ensured client’s requirements were met within budget and met client’s expectations

Assured quality; followed up with QA/QC team and lab field test (concrete & earth works)

Controlled health and safety precautions on site; especially in Oil and Gas fields AIS (Advanced Integrated System) Aug. 2010 – Nov. 2012 Implementation Manager

Security Project site: Working on oil and gas installation Fields in Western Region of the Emirate of Abu Dhabi. The projects include civil works, electrical installations, telecommunication installations, and the construction of buildings within hydrocarbon processing and storage facilities. Responsible for all construction works through the management of a team of engineers and site office staff. Duties include technical evaluations of sub-contractors, preparation of documents, programming and planning of works, management of site health, safety and quality, stakeholder management, sub-contractor management, design management, cost monitoring and control, invoicing, and management of the design process.

McCarthy & Stone Ltd, London- England Jun 2008 – Jun 2010 Construction Engineer,

Site Engineer working on a variety of new build and renovation bespoke housing projects in the City of London/ England. The role included managing and coordinating the works on multiple developments simultaneously. Duties included ground works, asbestos removal and demolition, material procurement requisition, management of subcontract and directly employed labors, steel and timber frame erection, concrete work, snagging, handover and maintenance.

Fields inspection and documentation.

Setting out the internal structure, positions of columns, walls.

Liaised between company and local government to receive county’s construction permission.

Planned, scheduled, measured and reported projects; Responsible for quality control.

Maintained quality control throughout visual inspections and site lab test inspections. Countryside Partnership PLC, London- England April 2006 – May 2008 Construction Engineer,

Construction of 31 houses on Denmark road, London, from the planning stage to the completion Gilbert Daniel November- 2017

3

Associated Press Broadcasting London - England Sept. 2003 – Mar. 2006 Transmission Operator / Transmission controller

Working with manual system for different TV channel output.

Responsible for the output feed (audio & video).

Responsible for complete transmission output the ON-AIR Services

Capturing of tapes into a digital format

Maintaining transmission and fault logs.

VT operator and knowledge of two machine Edit.

Issuing daily and weekly reports as required by operational procedure

Developed communication skills. Customer contact and internal liaison with other operational staff

Initiative and sound judgement

MBC (Middle East Broadcasting Center/ London - England May 1997 – June 2003 Head of Transmission Operator / Transmission controller Head of transmission Department/ Transmission Engineer: controlling & monitoring Live TV Broadcast.

Working with fully automation systems live to air.

Transmission & monitoring of MBC TV Satellite Channel output.

Software configuration to fit our display.

Operating Alamar & Louth (fully automation system).

Testing the On air VTs before go to live.

Reviewing & inspected Programmes for technical / artistic parameters, content and timing.

Maintain Net-working connections.

Viewing program tapes, commercials & promos for artistic & suitability to go to on air.

Capturing analogue tapes to a digital format review the schedule and add all the transition (fade, cut) and the speed of the transition. Make sure that the live news hit on the top of hour and adjust the difference in time. ADDITIONAL PROFESSIONAL WORK EXPERIENCE

MBC – TV / Head of transmission Control, software Design. May 1997 – June 2003

Association Engineering Group / Industrials & Steel Structure works Nov. 1988 – Aug. 1993

Hyundai Engineering & Construction / Roads and Motorways Oct. 1985 – Nov. 1988

FDSP Group / Building and Roads construction Sept.1982 – Oct. 1985



Contact this candidate