Post Job Free

Resume

Sign in

Engineer Manager

Location:
Cairo, Cairo Governorate, Egypt
Posted:
November 24, 2017

Contact this candidate

Resume:

RÉSUMÉ Hussein Fahim Abo EL Dahab

Address: El Hawamdia City, Egypt

Mobile: 002***********

Email: ac3grv@r.postjobfree.com

QUALIFICATIONS

**** *** ** ********* *********** Cairo University EMPLOYMENT HISTORY - BRIEF

Started my career with the Gulf of Suez Petroleum Company (GUPCO) from November 1998 to 2008. Gupco is a joint venture between BP (formerly AMOCO) and EGPC (Egyptian General Petroleum Corporation). Work as Senior Petroleum Engineer in different roles at Cairo office and at wellsite/fields at Ras Shukeir area (Gulf of Suez area, GoS).

I then joined Abu Dhabi Company for Onshore Operations (ADCO) in UAE in January 2008 as production engineer responsible for W/L & intervention work (killing. Stimulation, perforation, logging), preparing 5 years’ Budget and Business plane, prepare RMP (Reservoir monitoring plan), KPI to track performance and advise/flag any gaps for petroleum development and training and coaching less experienced engineers. KEY COMPETENCIES

• Monitor wells performance and identify enhancement opportunities.

• Production optimization using nodal analysis. (single well and integrated system models using GAP)

• Administer the Well-by-well reviews and track well intervention operations.

• Plan and program rig and rigless activities, Coiled tubing operations and Completion design.

• Rgigless coordinator and single point of contact for killing package, CT. unit., Well testing package

• Review and issued reports on Production logging analysis and Open hole logs analysis.

• Gas lift design, redesign and trouble shooting. (manual methods and proposer)

• Witness many offshore jobs (perforation, WSO, stimulation, PLT, WFL, PSP, TDT, FSI,

• Drilling and work over statement of requirements (SOR) preparations.

• Reservoir management and surveillance planning and execution (wrap up lessons learnt for improvements)

• Water flood management and issue and follow up on targets and guide field groups on improvement areas.

• Field development planning and follow up implementations.

• Well test analysis. (PBU Draw down PFO) job planning, operation and wrap up final analysis.

• Estimation of remaining reserve (decline curve).

• ESP design, redesign and trouble shooting

• Calculation of OOIP using material balance and volumetric methods

• Prepare annul Budget

• Prepare business plan for the filed

• Prepare HSE Plan & follow to achieve target.

• Prepare reservoir monitoring plan ( RMP)

• Dual lingual: Arabic and English.

WORK HISTORY

JAN-08-JULY2016 (OIL FIELD)

ABU DHABI COMPANY FOR ONSHORE OIL OPERATION (ADCO)

- SENIOR PETROLEUM ENGINEER

I join with ADCO in UAE in Jan, 2008 as production engineer responsible for W/L & intervention work

(killing. Stimulation, perforation, logging, slickline operations)

• Supervise logging programs as per RMP.

• Prepare corporate monthly Wire line plan (12 months) as part of PEIP for SAS including all RMP and activities and follow -up on execution & Feedback

• Provide daily W/L activities report

• Ensure timely reporting of the planned activities on the assigned board

• Monitor the Wire line workload distribution and ensure max. Utilization of W/L units.

• Issue monthly status report on W/L utilization

• Review the W/L survey results (on weekly basis) and ensure quality prior to forwarding to RDD

• ESP trouble shooting with review the performance for the ESP

• Prepare monthly wire line charge out distribution report along with the invoice.

• Prepare W/L budget & flow up

• Plan, prepare all programs such as: PBU,PFO, Isochronal test, interference test

• Put the plan for all types of logging such as: WFL,RST,PLT

• Prepare all task order & DTR for W/L

• Participated in SC-SSSV maintenance optimization effort

• Intervention work as: killing. Stimulation, kick off using N2, Scale removal, fishing using CTU, logging in horizontal well using CTU.

• Program all intervention work and follow-up progress and evaluate results and use lessons learned to optimize further programming.

Oct-2000 to Dec2007 ( Cairo Office )

GULF OF SUEZ PETROLEUM COMPANY (GUPCO), EGYPT

- RESERVOIR ENGINEERING (AS RESERVOIR MANAGEMENT) & PETROLEUM ENGINEER

• Review, update and plot the daily production and water injection reports for each well and field, identify the problematic wells, and evaluate the remedial actions for these wells. For example, production performance monitoring through Prosper modeling resulted in saving 20 MMSCF/day of lift gas used to open another shut in wells with 800 BOPD incremental oil.

• Follow up the well performance and reservoir performance to determine production problems and identify the solutions to maximize the production rates.

• Solve any well integrity problem, such as preparing repairing programs for X-Mass tree and/or header leaking valves, any tubing or casing obstructions, communicating tubing/annulus...etc. Understanding of well integrity issues and shred in determining high risk wells to HSE view.

• Study the water flood project effects on the production performance by following up the pressure performance, chloride measurements and water cuts to identify the optimum water injection rate.

• Prepare programs for all rigless operations and follow-up progress and evaluation for: o Pressure survey (static, flowing, PBU).

o Cased hole logging (PSP, RST, WFL, Cement Evaluation, etc o Tubing Cleaning (mechanical and chemical)

o Stimulation and acid wash (acidizing/fracturing). o Perforation & re-perforation job.

o CT application (unloading, stimulation, fishing, etc o Water shut off using TTBP.

• Drawing X-sections and determining offset wells relationships to develop a recommendation for production/injection enhancement opportunities.

• Follow-up daily drilling operations. Discuss the well problem with the drilling team. Make sure to maintain the well integrity and achieve the required SoR objectives (statement of requirements). Initiate SoR and integrate inputs to the final issue from geology, reservoir engineers and drilling and directional plan.

• Work over evaluation: Coordinate with other engineers (production Eng’s, Reservoir Eng’s, and drilling Eng’s) as well as production personnel to identify, develop, recommend and implement work over opportunities.

• Determining scale accumulation and preparing suitable solvents.

• Calculation of remaining reserve for many fields.

• Calculating OOIP using material balance and volumetric methods.

• Water Flood evaluation and redistribution for Sidki Field Nubia formation

• Preparing drilling SOR for new wells and workovers.

• Evaluation of reservoirs performance and recommendations for rig and rigless activities and surveillance plans.

OCT. 1999-OCT. 2000 (OIL FIELD) IN GOS, RAS SHUKIER

• Performing and/or witnessing the following offshore jobs: 1. Chemical jobs (Matrix Stimulation, Tubing Cleaning) 2. Perforation jobs (TCP, Through Tubing Perforation) 3. Well logging (OHL & CHL)

4. Well tests (RFT, PBU, PFOT, SS, SRT, GLS)

5. Wire line jobs (Tubing Gauging, Gas Lift Valve Change)

• Troubleshooting and unloading producing wells at the optimum flowing conditions.

• Qualitative and Quantitative Interpretation for: 1. Open hole logs.

2. Cased hole logs.

3. Pressure build-up surveys.

4. Bottom hole static surveys.

5. Step rate test for WIW.

NOV.98-OCT.99 ( CAIRO OFFICE )

GULF OF SUEZ PETROLEUM COMPANY (GUPCO), EGYPT

PETROLEUM ENGINEER

• Production/water injection performance monitoring.

• Follow up the well performance and reservoir performance to determine the production problems and identify the solutions to maximize the production rates.

• Well intervention operations.

• Rig and rigless activities monitoring.

• Preparing and witnessing stimulation jobs.

• Determining scale accumulation and preparing suitable solvents.

• Evaluation of reservoirs performance and recommendations for rig and rigless activities and surveillance plans.

• Drawing X-sections and determining offset wells relationships to develop recommendations for the following as required:

1. Water shut off using MPBT

2. Perforation and re-perforation

3. Rig and rigless re-completion.

4. Stimulation and tubing cleaning.

STUDIES

Participates in Hilal field development study with Sunbury development team in UK and results showed 2 new wells with 4000 BOPD incremental oil and increase the remaining oil reserve by producing the attic oil in this field by 5 MMBO incremental in reserve.

TRAINING

TECHNICAL

• Open Hole Logs interpretation, Cairo by Next, Schlumberger

• Cased Hole Logs, Cairo by Next, Schlumberger

• Advanced Formation Evaluation, Cairo by Next, Schlumberger

• Hydraulic fracturing. Cairo by Next, Schlumberger Halliburton (2000)

• Production Evaluation and Reservoir Monitoring, Cairo (2002)

• Gas Lift Production, Cairo (2002)

• Formation Damage, Cairo by PetroSkills Middle East (2003)

• Petroleum Expert ( MBAL Prosper Gap program ) (2003)

• Advanced Reservoir Engineering, Cairo by Colorado school of mines (2005)

• ESP Design (2005)

• Well test analysis (Pie program) (2005)

• Applied Reservoir Engineering, Cairo by AL-AMAL (2005)

• Water Flood A to Z, Cairo by Petroskills Middle East (2005)

• HSPTWSS - Permit to Work -Site Supervisor (2008)

• Area Authority (2008)

• PCTW - Team Work – PCP (2008)

• Effective Communication Skills (2009)

• Customer Focus (2009)

• Gas Lift System (2009)

• problem Solving & Decision Making (2010)

• Facility Response plan (FRP) (2012)

• Advanced petroleum Economic (2013)

• Enhanced Oil Recovery (2013)

• Advanced Hazop Analysis (2014)

INDUSTRY REQUIRED

• Helicopter safety and Firefighting, Cairo (1999)

• Safety Training and Observation Program (STOP), Cairo (2003)

• Offshore Firefighting, Cairo (2004)

• PTW course (2008)

• Firefighting (2008)

• PTW (2013)

SOFTWARE TRAINING

• Integrated Asset Modelling, Petroleum Expert, Cairo by BP (2003)

• Introduction to DSS & DSS Power User (Advanced), Cairo by Landmark (2003) REFEREES

Hussm Bin Kuwaire

TSM

ADCO

Mobile: +971*********

Yasser El-Massry, M. Sc.

PE

BP - Egypt Base

Management Manager

GUPCO Ops. Engineering

Deputy General Manager

Office: +2-022-***-**** E-

mail: ac3grv@r.postjobfree.com

Mohamed Abdel Salam

Petroleum Eng (Asset team)

ADMA UAE

ac3grv@r.postjobfree.com



Contact this candidate