Post Job Free

Resume

Sign in

Manager Engineer

Location:
Franklin Township, NJ, 08873
Salary:
$120 K+
Posted:
November 21, 2017

Contact this candidate

Resume:

Soulmaz Khojasteh, P.E., C.M.E.

* ****** ****

Princeton Junction, NJ 08550

Home Phone 609-***-****

Cell Phone 908-***-****

E-mail: ac3fdl@r.postjobfree.com

REGISTRATION:

Professional Engineer: New Jersey

Professional Engineer: Pennsylvania

EXECUTIVE EXPERIENCE:

Franklin Township, NJ Sewerage Authority

Executive Director

November 2010 – January 2018

FTSA is responsible for collecting and transferring wastewater for a population of approximately 40,000 throughout the Franklin Township. The Authority has 29 employees with an annual budget of $15 Million. As the Executive Director I was responsible for the general overall supervision and direction of all functions of the Authority including operations, maintenance, organization and finance, also responsible for establishing the annual operating and capital improvement budgets and recommendations for sewer rent revisions. Some of the other responsibilities included establishing personnel policies as well as hiring and firing of the Authority personnel. Reported to an appointed Board of Commissioners.

MANAGEMENT AND ENGINEERING EXPERIENCE:

CME Associates

Professional Engineer/Client Manager

September 1999 – November 2009

Berkeley Township Municipal Utilities;

As the Client Manager attended the monthly Board meetings, prepared and presented Engineering Reports regarding ongoing projects, performed Annual Facility Inspections and prepared reports.

Also designed and managed number of projects listed below:

-A major water main installation project from the design to construction completion. Approximate project budget was 8 Million dollars.

-A one million gallon elevated water storage tank; supervised and monitored the inspection. Approximate project budget was 2.25 Million dollars.

Soulmaz Khojasteh

2 Garnet Lane

Princeton Junction, NJ 08550

Home Phone 609-***-****

Cell Phone 609-***-**** page 2

Franklin Township Sewerage Authority;

As the Client Manager attended the monthly Board meetings, prepared and presented Engineering Reports regarding ongoing projects, performed Annual Facility Inspections and prepared reports.

Also designed and managed number of projects listed below:

-Managed the construction of a sewage pump station. Approximate project budget was 3 Million dollars.

-Managed the upgrades of three sewage pump stations. Approximate project budget was 2 Million dollars.

Township of Neptune Sewerage Authority;

As the Client Manager attended the monthly Board meetings, prepared and presented Engineering Reports regarding their ongoing projects, performed Annual Facility Inspections and prepared reports.

Also designed and managed the replacement of a digester gas burner. Approximate project budget was 1 Million dollars.

Northeast Water Pollution Control Plant

The City of Philadelphia, Water Department

Assistant Process Manager

August 1990 – September 1999

As Assistant Process Manager for a 210 MGD wastewater treatment plant, managed the day-to-day process and operation of the plant including the primary, secondary and the solids handling processes. Prepared environmental reports for regulatory agencies. Was in charge of a comprehensive study for evaluating and redesigning the plant’s secondary system from RBCs to conventional secondary activated sludge system. Prepared a SOP (Standard Operation Procedures) for the Sludge Thickening Process and developed and conducted a comprehensive training program for the plant operators.

Prepared the plant PPC (Pollution Prevention Contingency) plan.

Designed the hydrogen peroxide and potassium permanganate feeding systems as part of a comprehensive odor control system at the plant. Performed a comprehensive study regarding the odor abatement alternatives for the Plant.



Contact this candidate