Skilled engineer capable of handling the entire round of construction management engineering cycles including planning, designing, evaluating and overseeing construction of building structures and facilities. Education

Bachelor of engineering, Building engineering program, Class 2014,Credit hours engineering program, Ain Shams University with Grade (Good).

Major: Construction Management.

Graduation Project : Hadayek el Maady overhead metro station creation with Excellent Grade where the Scope of Graduation project was Management of Hadayek El Maadi Overhead creation which comprises recreation of metro station building, strengthening project soil using piled foundation, demolition of old station, old platform & then establishing another station comprising ground floor & first floor while installation of electromechanical works like elevators & escalators . The project owner is The Egyptian Company for Metro Management & Operation; the Supervision Consultant was Nile Engineering Consulting Bureau while the General contractor was General Nile Company for Desert Roads. Our Scope of Graduation project included but wasn't limited to working on :

• Identifying Scope of the project

• Identifying Project Organizational Breakdown Structure & recommending a new one

• Studying Project Status & investigating Delay causes

• Doing Cost Estimate for the project based on the market prices

• Doing Time Estimate for the project based on resources productivity rates

• Preparing project Baseline & defining Critical path

• Allocating Resources (labor & equipment) & Cost on project time schedule

• Preparing project Cash flow in, out & Profit of investing in project

• Updating Time schedule according to actual progress on site

• Reporting project progress, actual cost spent & comparing versus planned progress to know project status if ahead Schedule or behind schedule, under budget or over budget

• Contract Analysis & Investigating points of weakness in Contract discussing the owner & the Contractor rights & duties

• Comparing the project contract to FIDIC RED BOOK & discussing its compatibility

• Preparing Method Statement of work

• Value Engineering for Piles Works & Slab types

• Discussing Health & Safety procedures at site & check if they comply with the required Health & Safety procedures

Thanaweya Amma, El Shaheed Tayyar Osama Ahmed Ismail experimental language school. Current experience

August 2016 till now Planning Engineer at Ginza for Construction Company ( Main Contractor) Working at Ashgar City Residential project where the scope of project includes Construction of seven models of Buildings of different areas, definite design and a mosque where the supervision Consultant is EHAF Consulting with total budget of 500 million Egyptian pounds where I am responsible for:

Preparing and updating two-week look-ahead schedule that reflect the priority activities.

Preparing Weekly & Monthly Status Report for the work in progress at Ashgar City project.

Preparing Full Time Estimate for all project activities depending on normal productivity rates

Analyzing monthly schedule submittals and preparing input into monthly Project reports.

Coordinating with site execution teams in order to follow up and record progress of operations.

Presenting the schedule of work to others in the company and the client organization involved with the project.

Developing detailed yet simple to understand schedules and graphs showing status of the project.

Producing visual aids to help explain the schedule of work, including bar charts and network diagrams using primavera

Monitoring the progress of the project at different stages of its development.

Updating the general project costs depending on invoices and interim payments received and issued.

Track, Monitor & Forecast progress of all activities and deliverables such as engineering documents, fabrication status, procurement and construction of all discipline.

Participating in all meetings ( i.e. schedule review meeting, progress meeting, coordination meeting and so on )

Preparing Baseline Schedule for Gardenia Park Clubhouse Construction project comprising of Concrete, finishing & MEP works comprising of basement, ground & first floor where it includes Gym, Sauna,Library,restaurant & swimming pools .

Updating progress weekly at Gardenia Clubhouse

Preparing Weekly & Monthly Status Report for the work in progress at Gardenia Clubhouse project Besides, participating to initiate Oracle Fusion Project Portfolio Management System at Ginza for Construction Company that aims to achieving full control over company’s projects, archiving all projects documents on the database for ease of access, enabling the top management to review Status of Ongoing projects & costs incurred for each project up to date. Also, it enables top management to review which projects are behind schedule or ahead of schedule, which over budget or under budget where it displays a dashboard for ongoing project status, pending issues & main concerns . Previous experience

December 2015 - May 2016 Technical Office Engineer at Orascom Construction ( Foundation Technology & Ground Engineering Department )

Working at Orascom Foundations department at Head Office where I was responsible for:

Preparing workshop drawings for piling projects in Egypt

Preparing Technical tender documents for projects

Preparing Tender schedules for projects

Reviewing Tender Contractual Documents & analyzing project risks in accordance with these terms and conditions

Developing work method of statement for piling works & Diaphragm walls works or procedure as required.

Updating weekly progress at East Port Said Quay Wall-phase 1 project where the project scope is to construct 500 meters Quay Wall at East Port Said

Issuing monthly invoices for East Port Said Quay Wall project for all subcontractors

Preparing periodical presentation for ongoing projects for OC Board of Directors to review

Monitoring and updating projects activities

Preparing and replying to Contractual letters

Attending progress meetings

Preparing Daily progress reports for the consultant for Port Said Quay Wall-phase 1 project

September 2015 – December 2015 Planning Engineer at Industrial Construction and Engineering Company (SIAC Group )

Working at Porto October project where the scope of project includes Construction of several malls & implementing landscape & hardscape works where the project owner is Amer Group & the supervision consultant is Dar Al Handasa with total budget of (140 million Egyptian pounds) where I was responsible for:

Preparing and updating one-week look-ahead schedule that reflect the priority activities.

Preparing Weekly & Monthly Status Report for the work in progress.

Managing project Baseline schedule and monitoring key dates for all phases of Projects (Design, Tendering, Procurement and Construction & commissioning).

Analyzing monthly schedule submittals and preparing input into monthly Project reports.

Coordinating with site execution teams in order to follow up and record progress of operations.

Presenting the schedule of work to others in the company and the client organization involved with the project.

Developing detailed yet simple to understand schedules and graphs showing status of the project.

Producing visual aids to help explain the schedule of work, including bar charts and network diagrams using primavera

Monitoring the progress of the project at different stages of its development.

Updating the general project costs depending on invoices and interim payments received and issued.

Making sure the achieved progress on the project fits the progress anticipated in the schedule.

Participating in all meetings ( i.e. schedule review meeting, progress meeting, coordination meeting and so on )

February 2015 - September 2015 (Unilever) Project Planner at Management Systems & Solutions (MSS) Working with Prof. Dr. A. Samer Ezzeldin (Project Director) at (Unilever Mashreq Manufactory Renovation & Rehabilitation) project with Gama for Trading & Contracting (Main Contractor) where I was responsible for the following:

Developing, managing project Master schedule and establishing key dates for all phases of Project (Design, Tendering, Procurement, Execution, Testing, & commissioning).

Preparing and updating one-week look-ahead schedule that reflects the priority activities.

Preparing Weekly, Bi-weekly & Monthly Status Report for the work in progress

Developing and implementing planned versus actual progress charts (histograms/S curves).

Checking progress at site any time for weekly progress reports.

Coordinating with site execution teams in order to follow up and record progress of operations.

Participating in regular and as-needed meetings with the contractor’s management team for discussing different issues.

November 2014- February 2015 Planning Engineer at Management Systems & Solutions (MSS)- Head Office Working at MSS Head Office where I was responsible for:

Monitoring and controlling the working hours of Manpower and their distribution among the activities of the projects considering the Time Sheets on "Procoor" (a Project Coordination system).

Preparing monthly overall monitoring report for departments' projects.

Weekly Updating of status for all projects in overall monitoring report according to the actual percentage of completion presented by each project manager.

August 2014 – November 2014 Trainee at Engineering House Of Expertise (EGEC) company Working at Mivida project with EGEC (Supervision Consultant ) at parcels 2,3,4 & 5 with ORASCOM construction company, at parcels 6& 18 with SIAC construction company & also at parcel 12 with REDCON construction company where I was responsible for :

Reporting and following up all non-conformance activities.

Conduct on site investigations and analyze data (maps, reports, tests, drawings and other)

Checking the status of project for all parcels on site

Preparing monthly reports for progress on site

Conducting sand cone test analysis

Observance of safety requirements

Ensuring that all site works are done according to all applicable quality standards.

Ensuring that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards Skills

Computer:

Certifications:

ICDL (certified from UNESCO ) April 2009

AutoCAD 2D (certified from Autodesk ) October 2012

Courses:

Excel, Word &PowerPoint Ecotect Analysis Autodesk

Primavera 6 Dialux

SAP 2000

Etabs

Microsoft Project

Project Management International Standards (PRMG025)

Project Bids and Contracts (PRMG080)

Project Budgeting & Financial Control (PRMG030)

Management of project Resources (PRMG020)

Project Feasibility Studies (PRMG050)

Procurement Management (PRMG055)

Language:

English : Good command both written & spoken

French : fair

Extracurricular activities

Participant at Catalysis workshop (Step 2) from June to August 2012.

Volunteer at Sonaa El Hayah organization El Elm Kowa project where I worked as a teacher for ignorant people at one of the literacy classes at one of the slums in Cairo (September –December 2012) .

Organizer at the closing of El Elm Kowa project at Al Azhar Conference Hall in February 2012.