EXPERTISE: Around ** years of expertise in Oil and Gas in total - 5 years in Process Engg (E& TS) at KNPC - SHU Refinery, Kuwait and 10 years of experience in Process Development (Projects) dept of Chennai Petroleum (subsidiary of Indian Oil Corporation), Chennai, India, & 5 years in Engineering Consultancy in Worley Parsons & ENI Saipem, 4 yrs with PDO (SHELL JV) upstream E& P Operating company in Gas Directorate. Currently with PETRONAS Refinery, Malaysia as Process Specialist

EDUCATION:

B.Tech (Chem. Eng.), Coimbatore Institute of technology, Coimbatore, India

MBA (International business) Pondicherry University, Pondicherry

PROFESSIONAL EXPERIENCE:

COMPANY

DESIGNATION

PERIOD

PETRONAS (Downstream),Malaysia 6

Process Specialist- Treating & Strategic Projects

Feb ’16 -

Petroleum Development Oman (PDO)5

Sr. Concept Process Engineer

Feb ’12 – Jan16

ENI Saipem 4, Sharjah

Dy. Chief Process Design Engineer

Sep‘08 – Oct’ 11

Worley Parson 3, Oman

Sr. Process Design Engineer

Aug ‘07 – July 08

KNPC 2, Mina Al Shuaiba Refinery

Kuwait

Process Eng. –

Tech. Services

Aug.’ 02 –July ’07

CPCL 1, Manali Refinery

Madras, India

Deputy Manager -

Process Dev. & Interface

Sep.’01–Jul.’02

Senior Process Development Engineer –

Process Engg

Jul.’96–Aug.’01

Process Development Engineer

Apr.’93–Jun.’96

CPCL 1, Manali Refinery

Madras, India

Operations Engineer

July’91–Jun.’93

1 Chennai Petroleum Corporation Limited (CPCL), formerly Madras Refineries Limited (MRL). It is a group company of Indian Oil Corporation Limited with a total refining capacity of 230 MBPD.

2 Mina Al Shuaiba (SHU) refinery is one of the refineries of Kuwait National Petroleum Company (KNPC) with a refining capacity of 200 MBPD.

3 Worley Parson, is world renowned Engineering company with wide interest in the area of Energy and resources with offices all over world.

4 ENI Saipem Sharjah Engineering, is world renowned EPC Company with wide interest in the area of Energy and resources with offices all over world

5 Petroleum Development Oman (PDO) is renowned government of Oman & SHELL JV upstream operating Company.

6 PETRONAS is renowned government of Malaysia & Malaysian Refining co JV.

SUMMARY OF WORK EXPERIENCE:

Experienced Sr. Process Specialist with about 26 years of total experience in Refinery, Exploration & Production, Onshore & offshore Engineering Consultancy. Being involved in various activities of Process Engineering such as Pre-Feasibility, strategic initiative Concept studies. New Refinery Screening studies, Brownfield refinery modification, Technical Services, Operation Support, Refinery Bench marking studies, Design, Commissioning and Operations of Refinery facility, LNG facilities & Offshore facilities. Performed as Technical Authority/ Head of Process in EPCM. Developed and headed the SBU SAIPEM, Sharjah

Involved and supported Concept studies, FEED and Detailed design in Oil & Gas area. Expertise in managing multi-discipline activities as focal point for various stages of Engineering studies. Executed many Facility change projects (FCP’s). Expertise in simulation in ASPEN+, UNISIM & Pipesim, FRED. Prepared various Process specifications for equipment’s. I have involved in projects related to Energy Saving studies, Involved in projects related to LNG Depletion compression, Flare studies. Pipeline /Flow assurance,

Experienced in Cost analysis & value engineering and project startup audits. I have worked adapting all HSE guidelines from IDENTIFY to OPERATE stages of various projects. Involved in Design review, HAZOP, SIL Classification for various projects. Involved in QRA/FRA/HAZID/ALARP & Project start-up Audits. I have updated knowledge in the latest technology such as EOR, REED BED water disposal, MCRC, ATD tank drain systems Familiar with Saudi ARAMCO standards. Involved in providing data for on various test runs aligning Refinery strategic objectives. Analyze the capabilities of vendors / contractors to perform major services in line with project requirements.

Feb 2016 – till date PETRONAS, Meleka Refinery, MALAYSIA - Process Specialist & Strategic projects lead

Providing process support and advisory in Technology group for treating section which comprises Naptha treating, Diesel hydro treating,KTU, SRU,SWS, ARU & Bulk Sulfur handling units.

Working in all PETRONAS Refinery, strategic ongoing projects at Concept stage to detailed design are as follows:

1.LPG capacity expansion project – Concept study

2.Crude tank water draining and sludge management project – concept study and support to FEL2 - ongoing

3.ULSD- 95 supply to TTLR – DFS, Support to BED

4.Condensate souring of CFU – Concept, Support to DFS.

5.Effluent treatment facilities revamp – Detailed Feasibility support

6.SRU improvement and new train- Basic Engineering design stage

Activities in treating units:

1.Carried out Amine chemical loss assessment in Amine Recovery unit in train 1 & 2.

2.The ARU site audit requirement for chemical losses was discussed and root cause identified and recommendations arrived and supported the presentations

3.Carried out RCFA for stripper column N5 nozzle shell impingement and piping metal thinning.

4.Presented the RCFA findings in AIMTECH and the same is being loaded in PARADYMS. To be presented in ATC on 23rd June 2016.

5.Participated on Area Leadership meeting as ALT, PLT, Production Planning etc.,

6.Updating the safeguarding memo for Units 33,34,35, 26,27 & 28 both in treating and product units.

7.Participated in various meeting for ROOT cause findings for unknown sulfur in LPG units.

8.Provided inputs for flow chart and root cause analysis for unknown sulfur

9.Participated in meetings with various vendors for providing the technology for removal of unknown sulfur.

10.Provided inputs for DRA software for SRU units and requested Consultant on critical tags.

11.Time to time monitoring of process units for any action required for Operations.

12.Participated in Technology Team PHA assessment and carried out sample PHA EXERCISE.

13.Provided inputs for S02 emission in stack and the provided inputs for revising the self-imposed emissions.

14.Participated in the discussions with HSES for Finalizing the Presentation to DOE/ Management.

15.Reviewed the SRU unit IR reports and provided comments as and when required.

16.Supported in the presentation for Operating the SRU unit for 180 TPD and participated in the meetings.

17.Participated in the technical selection of COD unit installation and the cost / economics evaluations

18.Carried out behavioral safety (BS) audits on monthly basis and provided the findings.

19.Carried out Technical safety audits(TSA) for unit 25 utility system and provided the findings.

20.Sour water stripper (U-15) top pressure issue performance hiccups brainstormed and issue addressed.

21.SRU back pressure issue and choking and provided inputs as and when required.

22.Participated in the HCR-10 meeting and represented technology and carried out audits.

23.Provided inputs to Flare gas seal bacterial growth issue in utilities area.

24.Supported the EURO –V project for scope and queries raised by team.

25.Participated in the SOLOMON associated presentation and input provided for queries.

Feb 2012 - till date: Petroleum Development Oman as Sr. Concept Engineer – Gas Directorate (LNG Facilities)

Facility Concept studies: Involved in Identify, Assess & Select stage

A)Operational Support to Gas Operations:

The gas Operations consists of 2x 40mmscmd of GAS plants such as Yibal, Saih Rawl with Compression, Turbo Expander and HC and water dew pointing facilities with metering facilities for export to LNG terminal

1.Regular support of Operational Constraints

2.Monitoring and trouble shooting

3.Support of Brownfield projects/ green field

4.Participation in technical workshops such as design review, Hazop, Hazid,Simops

B)Yibal Butane unit Assessment study (105 Tons/day capacity):

Involved in the Identify & Assess stage of the study.

Carried out simulations to assess the performance of the Butane unit for the new feedstock.

Verification of Re-boiler duties.

Technical discussions held with Vendor for the internal trays verification.

Review various option and prepared Concept selection report based on Economics at DEFINE stage

C)SR CPP Flare gas recovery study(Zero flaring study (SR Central Process plant

Review of Continuous / non continuous loads to Flare.

Site visit carried out for data collection / identification of plot area

Defined various scenarios for flare load calculation from the surface facilities.

Carried out hydraulic study for major pipelines.

Reviewed the requirement of Compressor / type

Prepared Process data sheet for the Reciprocating Compressor

Interaction with vendors to obtain budget quotes

Preparation of CSR with FEED scope of work.

D)Hydro-Carbon Conservation study (Government Gas Plant

Review of Continues loads

Review the loads for Purge / Blanketing

Identified the options for replacement or Recovery

Site visit to identify Tie-in

Technical discussion with Flare vendor for Replacement with N2 purge

Capacity check for the N2 Compressor / Air Compressor

Economics and Green House gases study

Preparation of CSR and presentation to Management.

E)GGP Flare Adequacy & segregation study

Evaluation of the Exiting flare loads

Verification of existing EDP, RV’s for exact load

Site visit to collect data for verification of data such as Cv for EDP/ RO etc.,

Verification of flare sub header / Header and Hydraulic checks carried out.

Segregated Depressurization scenarios and identified of Fire zones.

Calculation doen for back pressure and Mach number

Provided options for flare header / sub header replacement or additional flare

Prepare Concept selection report

F)GGP Safety studies (QRA,FRA & FG Mapping

Review of existing EDP & Release rate

Verification of RO at site and calculations

Involved in the Hazard identification workshops

Involved and worked along with Consultant on Physical effect Modeling

Identification of FIRE envelopes

Manning Philosophy of the units and the quantitative risks identification

Workshop to review the recommendation and sensitive analysis.

FEED & Detailed Design : Involved in DEFINE,EXCECUTE to OPERATE Stage

A)GGP Rejuvenation project: USD 120MM

Team leader for this Multidiscipline scope for refurbishing the existing 30 years old plant with scope includes process, static, mechanical, electrical, pipeline for refurbishment of old Government gas plant in order to extend the life of unit for another 25yrs at the cost of around 120 $MM. Involved in the baseline assessment study, scoping of the project, preparation of Basis of Design and presently supporting FEED, Detailed Design.

B)Yibal 2nd stage depletion& re-wheeling Compressor project: USD 300MM.

The unit is to install 4 depletion Compressor re-wheeling along with installation of new Compressor for pressure depletion in the subsurface wells for capacity of 23 MMSCMD LNG facility.

Involved to Technical Evaluation of bids support the YDDC123 & 4th Compressor for DEFINE stage

Involved in the supporting the Technical queries & Exemption, Qualification, Clarification (EQC)

Unisim calculations verified for the facility

Initiated various studies related to Process / HSE

Discussion with Compressor vendor on data sheet/ specification.

Verification of calculation and review of process documents / drawings.

Reviewed PFS/PEFS/PSFS and provided comments

Involved in the Design review/HAZOP/IPF reviews

Supported in closeout reports for the above.

Provided input to various safety studies like QRA/FRA& F& G Mapping

Involved in HAZID, ALARP STUDIES.

Supported HSE PLANS

Involved in Projects Audits/ Certification for fitness

Involved in Pre- start up and Commissioning

C)SR CPP Flare gas recovery study (Zero flaring study (SR Central Process plant) USD 120MM

The flare Gas recovery unit is installed in Central Gas processing plant to recovery up to 60,000 sm3/day of flare gases by installation of reciprocating Compressor & N2 Package

Involved to Technical Evaluation of bids support for identification of Compressor vendor & EPC

Involved in DCAF & HSE studies identifications

Involved in the supporting the Technical queries & Exemption, Qualification, Clarification (EQC)

Unisim calculations verified for the facility

Interface with the existing facilities were identified

Discussion with Compressor vendor on data sheet/ specification.

Finalization of Heat & Material balance.

Verification of calculation and review of process documents / drawings.

Reviewed PFS/PEFS/PSFS and provided comments

Involved in the Design review/HAZOP/IPF reviews

Supported in closeout reports for the above.

Involved in HAZID, ALARP Studies.

Supported HSE PLANS

Carried out site visits during fabrication and erection to vendor and Project facility area

Construction ongoing.

D)Al Huwaisah & Fahud south west off plot pipeline project.( 24” & 20” pipeline 56 km & 64km: USD 6.0 MM

Installation of off plot piping for the additional hook up of new wells and export pipeline capacity enhancement.

Carried out Hydraulic checks for the off plots pipeline for various sizes

Prepared SOW for Detailed Engineering for installation of the pipelines.

Involved in the Design review/HAZOP/IPF reviews

Supported in closeout reports for the above.

Supported in Material selection & integrity issue support

Supported HSE audits

Commissioning support provided Operational checks carried out.

E)GGP Fire water pump & Air blower (9Nos) replacement project: USD 20MM

As part of Safety & Integrity projects, it was proposed replace the existing Fire water pumps & Air blower relocation in GGP & CPP facilities.

Involved to Technical Evaluation of bids support for pumps & Blower

Involved in DCAF & HSE studies identifications

Involved in the supporting the Technical queries & Exemption, Qualification, Clarification (EQC)

Pipesim Hydraulic checks & Dynamic surge calculation checks

Interface with the existing facilities were identified

Discussion with Deluge and Air blower / pump vendors..

Finalization of capacity and water ring distribution .

Verification of calculation and review of process documents / drawings.

Reviewed PFS/PEFS/PSFS and provided comments

Involved in the Design review/HAZOP/IPF reviews

Detailed Design is in progress.

F)Handling following Field Change projects (FCP’s) in Yibal & SR cluster

1.Flare KOD Pumps replacement.

2.Rerouting of vent line to flare

3.Seal gas conditioning and condition monitoring project

4.Replacement of leaking valves in 48” Export gas pipeline.

5.Installation of additional Slug catcher.

6.Interlink Compressor reversal project

G)Gas business plans: preparing the following

Gas business plan

Early Business plan

Weekly / monthly progress reports

H)Providing Operation support & site audits for Yibal & Saih Rawl Gas facilities (LNG Facilities) .

Government gas plant (GGP) & SR Central Processing plant) having capacities of 23 MMSCMD & 46 SCMD respectively with 6 TEG gas treatment trains & TEG regeneration units for dew point and HC dew point conditioning along with Export facilities.

Supports in the Operations / trouble shooting

Discussion on minor HAZOP / RCA workshops

Modification reviews sessions

Facility Change proposals

Sep 2008 – Oct 2011: ENI – SAIPEM, UAE as Dy. Chief Engineer (Process Design)

A.QP OFFSHORE PLATFORMS ( Dec 2011 – Oct 2012)

Installation of top side gas facilities / treatment train for QP & Utilities

Prepared BFD /FEED for QP gas facility platforms as Lead Process Engineer.

Involved in the hydraulic simulation and calculation for separator sizing

Preparation support and approval of of data sheets and process documents

Participation in DR/HAZOP and closeouts

Multidiscipline workshops and projects meeting attended.

B.FEED for Flare gas Recovery unit for Takreer Ruwais refinery

1.Verification of process loads & site visit carried out

2.Preparation of Basis of Design.

3.Simulation carried out in Flare net

4.Preparation of study Report .

5.Preparation of presentation to Management

6.Process support in multidiscipline team and conducting workshops with clients.

C.SATORP – (Saudi Aramco – Total JV Export refinery ) - Reliability Engineering

(PROCESS COORDINATOR) (May 2011 – Nov 2011)

Process support for the reliability engineering. Involved in criticality analysis of process units, Review of complete refinery scope and unit level criticality analysis. & RCM.

Involved in preparation for criticality analysis, RBM and FMECA for the process & utilities units.

Process support in multidiscipline team and conducting workshops with clients.

Re-Analysis of SIL, C& F and HAZOP report recommendations.

D.GASCO FEED –Sales gas supply to Takreer RRD & Shuweihat area ( Feb 2010 – Jan ‘11)

Involved in PFD and P&ID preparation.

Pipeline hydraulic simulation using Pipeline studio (TGNET).

HAZOP study and action close out.

Preparation of process data sheet for instruments and equipments.

Generation of Equipment list

E.5. AQUILA – Phase – 2 Top side - SPPID Conversion ( Sep 2009 – Dec 090)

Symbol Customization (symbols, Piping components, equipments, etc.,)

P& ID creation using SMARTPLANT Generation for Equipment list

Generation of line list,

Generation of Instrument list.

F.ZADCO – SATAH FULL FIELD DEVELOPMENT:

Verification of process FEED documents/ drawing and FEED Endorsement.

Prepared consistency report

Carried out Simulation verification

Verified Data sheets & Documents

Prepared EQC

Attended Client Technical evaluations Meetings

: :

FEED verification carried out for the following proposals ( 2008 – 2011)

Involved in the proposal bid evaluation, carried out endorsement of process documents. Prepared budget proposals and tender reviews for various onshore/ offshore proposals.

ZADCO –UZ750K Brownfield upgrades/ Modification ( Ongoing)

All the FEED documents related Satellite platforms & islands such as separators/ pig launcher / receivers and Adequacy check of the existing system is being carried out. as part of FEED Endorsement.

Process studies, P&ID’s, PDS, Hydraulic simulation. EQC lists were prepared. Preparation of Detailed Engineering man-hours, inputs to Project execution plan.

Takreer: Isomerisation Quality Improvement Project:

All the FEED documents related to the following units such as Splitter data, pumps, exchangers and associated utilities were verified and FEED Endorsement was done for Process studies, P&IDs, PDS, Hydraulic simulation. EQC lists were prepared. Preparation of Detailed Engineering man-hours, inputs to Project execution plan.

ZADCO-UZGTP EXPANSION PROJECT

All the FEED documents related to the following units such as Gas Compressor unit, Primary and Secondary treatment unit ( Gylcol),Propane Refrigeration unit, and associated utilities were verified and FEED Endorsement was done for Process studies, P&IDs, PDS, Hydraulic simulation. EQC lists were prepared. Preparation of Detailed Engineering man-hours, inputs to Project execution plan.

Inter Refinery Pipeline (IRP) of KNPC & KOC

Reviewed FEED document related to refinery oil and gas transfer pipeline between KNPC / KOC,Checked simulation reports and validated, PFD / P& IDs / Process data sheets related to pumps were checked.

C. Involved in preparation of system procedures, reviewing existing technical instruction & process data sheets formats. Associate with Quality Management Committee as Internal Auditor for implementing QHSE.

D. Professional Mentoring for Engineer development program and departmental activities.

Aug 2007 - July '08: Worley Parsons, Oman as Senior Process Design Engineer.

NIMR Deep water disposal Facility (DWD) Phase – 7 for PDO,Oman (Aug 07 – March 08)

Involved in design basis, Simulations & hydraulic calculations for various scenarios using PIPESIM. Carried out IPF, Hazop reviews. Preparation of Line list. Process data sheets Preparation of Feed package for the revamp of the existing DWD system at Nimr Production site for PDO Facilities. Review of Tender Documents. Win PCS. Preparation of POM

NIMR Tank (T-4817) debottle-necking for PDO, Oman (Aug 07 – March 08)

Involved in Conceptual study, Design Basis, Preparation of PEFS, PSFS, HAC. Design Review. Preparation of Design Review Close –out. Calculation for Nozzle sizing, adequacy of PVV’s and hydraulic Simulations carried out using PIPESIM. Preparation of Data sheets. Line list. Hazop review and closeouts

Amal – Amin Pipeline Replacement Project (50 km) ( Mar 2008 – July 2008)

Involved in design basis, Simulations & hydraulic calculations for various options using PIPESIM.. Preparation of PEFS, PSFS, and carried out IPF / SIL analysis, Hazop reviews. Line list. HAC Dwg’s, Process data sheets, Dispersion calculation for H2S to locate drain system using FRED. Review of Mechanical drawings/ isometrics & MTO’s.

CSR for Nimr Crude separation-Pipeline network in Nimr for PDO, ( Mar 08 – July 08)

Review of present facilities, collection of baseline data, Preparation of Design Basis. Hydraulic simulation carried out for various options. Preparation of Conceptual Study Report. Techno – Commercial evaluation of options, Presentation to Top Managements.

Aug 02 to July 07: Kuwait National Petroleum Co – Process Technologist & Project support - TSD

Naphtha splitter Unit ( Oct 2002 – July 2003)

Study carried out for better separation of C5 / C6 of the stabilized naphtha and prepared study report and prepared preliminary process sketches. Involved in review of PEFS / P& ID, Data sheets and involved in detailed Engineering with Fluor Daniel.

Strategic Crude oil pipeline between KNPC & KOC ( April 03 – Aug 04)

As PMC with M/s Fluor Daniel . Reviewed & prepared Conceptual study report for Crude oil pipeline between KNPC & KOC. preparation of process sketch. hydraulic calculation. Preparation of PEFS. Review of GA’s & Mechanical Dwg’s. Assisted during engineering stage for tie-ins and preparation of Drawings. Punch listing of all systems, Commissioning assistance

Enhancement of Mogas & Gas oil transfer for Local Marketing depot / Terminal in Kuwait for KNPC ( Sep 2004 – June 2006)

Studied and prepared preliminary Conceptual study report for future demand (2020) and augmentation of existing supply pipelines of Mogas / Gasoil for LM.. Involved in preparation of Process sketch. hydraulic calculation, preparation of line list, tie-ins points and site identification. Preparation of PFS, PEFS, and assisted in preparation of Feed package & Operational Manual Assisted during commissioning / trouble shooting during operations.

ATF Transfer from KNPC to KAFCO & Filtration system (Jan 05 – Aug 06)

Rerouting (45 km ) and filtration improvement study for ATF transfer from KNPC to KAFCO. Study and Process sketch preparation, Hydraulic simulation and filtration pressure drop problem rectification.. Involved in Design review, IPF/ Hazop reviews. Coordinated during Engineering and vendor documents review. Commissioning of the facilities.

Bench marking studies( Jan 05 – Aug 06)

Involved with the Solomon associates in the bench marking studies for Kuwait refinery with respect to performance and product slate and optimization of process controls and compared with the best refineries.

Screening of the secondary process ing system with respect to NPV and economics and product off take

Involved as coordinator for the recommendation implementer setting KPI for individual discipline and follow-up

Involved in DR / HAZOP reviews. Conducted VAR 4 workshop

Revamp of berth & Loading arms in Marine terminal for OL2K for KNPC (Aug 06 – Apr 07)

Revamp of berth 31 & 32 of Shuaiba Oil pier was modified by M/s Hyundai Engg with the shortest time of 9 months. Critical path forward was established to review drawing & document. Tie-ins / hook up work was carried out along with M/s Fluor, Hyundai & KNPC and loading arms are being commissioned successfully. This has established simultaneous operation / flexibility to load both white and black products for M/s KNPC & Ammonia to M/s Equate at same time.

Process Technologist : Offsite, tankfarm / ETS & MARINE OPERATING FACILITIES

Regular Monitoring of Inventory and transfer of storage tanks and specific follow up on slop oil tanks. Preparation of inventory / monitoring reports on Refinery Slop oil management.

Troubleshooting problems related to operational flexibility & providing solutions. Preparation of Process Tracking Sheet, Preparation of Process and conceptual flow schemes related to modifications in Offsite, tank farm & Oil pier. Process calculations using PIPESIM 3.2, HYSYS,INSTRUCAL & TL-NET such as press drop for piping, pump suitability, etc and design calculations for any modification in pipeline transfer & offsite area.

Proposing modifications, participating in HAZOP study, Risk analysis pertaining to the proposed modifications and following up on their implementation, execution & commissioning.

Performing material & energy balance, sizing of equipment, pipelines, orifice plates, control valves etc. & process design calculations by using software packages Pro II, InstruCal etc.

Providing process engineering assistance in preparing instructions and plans for maintenance work related to startup, shutdown and turnaround activities.

A. General Refinery Turnaround (GRTA 2006)

B. Chemical Decontamination of Process Equipment’s.

C. SLOP Oil Management In Shuiaba refinery

Operation of Crude Distillation Unit: As unit in charge operated in shifts, 100 MBPD Crude distillation and associated LPG Treating unit & Flare Gas Recovery Unit, Successfully faced and resolved 6 major emergencies.

(1991 – 2002) Chennai Petroleum Corp Ltd (IOC, India) – Dy Manager (Process development & interface)

Crude Distillation Revamp & Bitumen unit for CPCL (Sep 92 –June 93)

As PMC of client at EIL, India office, Involved in debottlenecking existing Crude Distillation unit capacity from 2.8 Million ton’s to 3.7 Million ton’s. Involved in preparation of CSR, PFS, PEFS, Review of FEED and Detailed Engg, Inspection of Process Equipment. Construction coordination and Commissioning of Unit. The project was completed ahead of scheduled time.

Bitumen air blowing unit for CPCL (June 92 –Apr ' 93)

Conversion of Bitumen unit to produce low pen vacuum tar with minimum cost and in-house Engineering / execution and commissioning of revamp ahead of schedule by 3 months

750m3/hr Propane Recovery Unit Aug 93 – Dec '95)

Proactively involved in the Design Review, Hazop and IPF review and reviewed all PEFS, PSFS, PFS. Worked with consultant for preparation of FEED document and data sheets. Involved in interdisciplinary review and assisted in Inspection of equipment for compliance with dwg’s. Actively involved in commissioning and guarantee runs and preparation of Test runs and Project closeout Reports.

Diesel Hydro treating unit Aug 93 – Dec '95)

The project to treat the Diesel to meet EURO spec of capacity 1.8 mmtpa capacity Involved in Define phase to Commissioning with the Consultant IFP France. Involved in reviewing of H& MB, PFS, PEFS,PSFS. Reviewed process documents such as BFD, Relief and blow down, OCSP etc,. Participated in the DR/HAZOP/IPF reviews and technical authority to approve the documents. Participated in the pre-startup audit/Commissioning and guarantee runs.

Sour water / Amine treating units for CPCL, India ( Feb 96 – Dec 97)

Involved in total life cycle of execution of Project jointly Licensed by M/s. Delta Hudson, Canada M/s. Engineers India Limited. Amine Recovery unit/Sour Water Stripper Unit/Utilities (consisting of cooling tower, Nitrogen system, plant / Instrument air system etc. by Engineers India Limited were also being erected. Commissioning support rendered.

Acid gas Recovery Unit (2x250 TPD) MCRC process (Sep 96 – Dec 97) as PMC

Involved in total life cycle of execution of Project jointly Licensed by M/s. Delta Hudson, Canada M/s. Engineers India Limited. Amine Recovery unit/Sour Water Stripper Unit/Utilities (consisting of cooling tower, Nitrogen system, plant / Instrument air system etc. by Engineers India Limited were also being erected.

Environment Impact Assessment/ QRA /HAZOP/HAZID Safety studies for refinery (Dec 97 – Nov 98)

Involved in scope of work preparation for the Environment / safety studies

Reviewed the TBE and coordinated in the technical evaluation of the Third party Consultant

Involved in the Field trials and data collection

Supported and associated with the Consultant for the Model reviews

Reviewed the Draft report and finalized the study

Executed the recommendation and supported and participated with the Regulatory authorities for clearances.

3 MMTPA refinery configuration (Dec 98 – Oct 99)

Preparation of feasibility report

Prepared the Concept identification report

Supported Economic analysis

Developed the screening analysis for the refinery configuration

Presentation made to Management for the chosen options

Evaluation of the CSR for FEED

Supported FEED for SRU unit

2x 500 m3 Effluent Treatment Facilities for CPCL, India ( Nov 99 – June 01)

Involved in Design Basis, Review of PFS, PEFS, PSFS, Preparation and Review of FEED Package for Effluent treatment Facilities along with M/s EIL for capacity of 500 m3 / Hr capacity with Primary/Chemical & Biological treatment facilities to discharge and reuse of treated effluent meeting USEPA norms.

Operations Engineer: Crude distillation / LPG Recovery Unit ( June 01 – July 02)

Operation of Crude Distillation Unit: As unit in charge operated in shifts, 100MBPD Crude distillation and associated LPG Treating unit & Flare Gas Recovery Unit



Contact this candidate